ML24280A001
From kanterella
Jump to navigation
Jump to search
ML24280A001 | |
Person / Time | |
---|---|
Site: | Millstone ![]() |
Issue date: | 06/20/2024 |
From: | James Holloway Dominion Energy Nuclear Connecticut |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
Shared Package | |
ML24176A175 | List: |
References | |
24-225 | |
Download: ML24280A001 (1) | |
Similar Documents at Millstone | |
---|---|
Category:Letter
MONTHYEARML25022A2962025-01-23023 January 2025
[Table view]Technical Specification Bases Pages ML25023A0392025-01-23023 January 2025 Senior Reactor and Reactor Operator Initial License Examinations L-25-001, Endorsement of Framatomes Requested Review Schedule for Topical Report ANP-10358P, Revision O Increased Burnup for PWRs2025-01-23023 January 2025 Endorsement of Framatomes Requested Review Schedule for Topical Report ANP-10358P, Revision O Increased Burnup for PWRs ML25014A2862025-01-21021 January 2025 Alternative Request to Defer ASME Code Section XI Inservice Inspection Examinations for Pressurizer and Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles IR 05000336/20244032025-01-13013 January 2025 Cyber Security Inspection Report 05000336/2024403 and 05000423/2024403 (Cover Letter Only) ML24365A2032024-12-30030 December 2024 ISFSI - 10 CFR 72.30 Decommissioning Funding Plan ML24351A2422024-12-19019 December 2024 Reactor Coolant System Alloy 600 Inspection Program for License Renewal Commitment No. 15 ML24351A2412024-12-19019 December 2024 Reactor Vessel Internals Inspections Aging Management Program Submittal Related to License Renewal Commitment No. 13 ML24346A2532024-12-12012 December 2024 Correction to Implementation Date for License Amendment No. 291 Regarding Framatome Gaia Fuel IR 05000336/20243012024-12-0606 December 2024 Initial Operator Licensing Examination Report 05000336/2024301 ML24324A0442024-12-0303 December 2024 Issuance of Amendment No. 292 Regarding Adoption of Technical Specification Task Force Traveler TSTF-421 05000336/LER-2024-002, Two Main Steam Safety Valves Failed to Lift within the Acceptance Criteria Resulting in a Condition Prohibited by Technical Specifications2024-11-26026 November 2024 Two Main Steam Safety Valves Failed to Lift within the Acceptance Criteria Resulting in a Condition Prohibited by Technical Specifications 05000423/LER-2024-002, Door Latch Failure Resulted in Loss of Safety Function for Secondary Containment Boundary2024-11-26026 November 2024 Door Latch Failure Resulted in Loss of Safety Function for Secondary Containment Boundary ML24296B2352024-11-19019 November 2024 Issuance of Amendment No. 291 License Amendment to Support the Implementation of Framatome Gaia Fuel (EPID L-2023-LLA-0150) (Non-Proprietary) IR 05000245/20240012024-11-12012 November 2024 Safstor Inspection Report 05000245/2024001 ML24317A2562024-11-12012 November 2024 Core Operating Limits Report, Gycle 30 IR 05000336/20240032024-11-0707 November 2024 Integrated Inspection Report 05000336/2024003 and 05000423/2024003 and Apparent Violation and Independent Spent Fuel Storage Installation Inspection Report 07200008/2024001 ML24289A0152024-10-21021 October 2024 Review of the Fall 2023 Steam Generator Tube Inspection Report 05000423/LER-2024-001, Loss of Safety Function and Condition Prohibited by Technical Specifications for Loss of Secondary Containment Boundary2024-10-14014 October 2024 Loss of Safety Function and Condition Prohibited by Technical Specifications for Loss of Secondary Containment Boundary IR 05000336/20244022024-10-0808 October 2024 Security Baseline Inspection Report 05000336/2024402 and 05000423/2024402 (Cover Letter Only) ML24281A1102024-10-0707 October 2024 Requalification Program Inspection 05000423/LER-2023-006-02, Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-09-26026 September 2024 Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24260A1952024-09-16016 September 2024 Response to Request for Additional Information Regarding Proposed Amendment to Support Implementation of Framatome Gaia Fuel ML24260A2192024-09-16016 September 2024 Decommissioning Trust Fund Disbursement - Revision to Previous Thirty-Day Written Notification ML24248A2272024-09-0404 September 2024 Operator Licensing Examination Approval ML24240A1532024-09-0303 September 2024 Summary of Regulatory Audit Supporting the Review of License Amendment Request for Implementation of Framatome Gaia Fuel IR 05000336/20240052024-08-29029 August 2024 Updated Inspection Plan for Millstone Power Station, Units 2 and 3 (Reports 05000336/2024005 and 05000423/2024005 IR 05000336/20240022024-08-13013 August 2024 Integrated Inspection Report 05000336/2024002 and 05000423/2024002 ML24221A2872024-08-0808 August 2024 Independent Spent Fuel Storage Installation (ISFSI) - Submittal of Cask Registration for Spent Fuel Storage IR 05000336/20244412024-08-0606 August 2024 Supplemental Inspection Report 05000336/2024441 and 05000423/2024441 and Follow-Up Assessment Letter (Cover Letter Only) ML24212A0742024-08-0505 August 2024 Request for Withholding Information from Public Disclosure - Millstone Power Station, Unit No. 3, Proposed Alternative Request IR-4-13 to Support Steam Generator Channel Head Drain Modification ML24211A1712024-07-25025 July 2024 Associated Independent Spent Fuels Storage Installation, Revision to Emergency Plan - Report of Change ML24200A1062024-07-22022 July 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000336/2024403 and 05000423/2024403 IR 05000336/20245012024-07-0101 July 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000336/2024501 and 05000423/2024501 ML24180A0932024-06-28028 June 2024 Readiness for Additional Inspection: EA-23-144 IR 05000336/20240102024-06-26026 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000336/2024010 and 05000423/2024010 ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 IR 05000336/20244402024-06-24024 June 2024 Final Significance Determination for Security-Related Greater than Green Finding(S) with Assessment Follow-up; IR 05000336/2024440 and 05000423/2024440 and Notice of Violation(S), NRC Investigation Rpt 1-2024-001 (Cvr Ltr Only) ML24281A2072024-06-20020 June 2024 Update to the Final Safety Analysis Report, Revision 37 (Redacted Version) ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24280A0012024-06-20020 June 2024 Update to the Final Safety Analysis Report (Redacted Version) ML24176A1782024-06-20020 June 2024 Update to the Final Safety Analysis Report ML24176A2622024-06-20020 June 2024 Update to the Final Safety Analysis Report, Revision 37 ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code 05000336/LER-2024-001, Control Room Air Conditioning Unit Inoperable Due to Refrigerant Overcharge Resulting in a Condition Prohibited by Technical Specifications2024-06-10010 June 2024 Control Room Air Conditioning Unit Inoperable Due to Refrigerant Overcharge Resulting in a Condition Prohibited by Technical Specifications ML24170A7832024-06-0606 June 2024 ISFSI, Virgil C. Summer, Unit 1, and ISFSI, North Anna, Units 1 & 2, and ISFSI, Surry, Units 1 & 2, and ISFSI - Submittal of Revision 36 of the Quality Assurance Topical Report ML24165A1292024-06-0505 June 2024 ISFSI, 10 CFR 50.59 Annual Change Report for 2023 Annual Regulatory Commitment Change Report for 2023 ML24128A2772024-06-0404 June 2024 Issuance of Amendment No. 290 to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and Core Operating Limits Report for Use of Framatome Gaia Fuel (EPID L-2023-LLA-0074) (Non-Proprietary) ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities 2025-01-23 Category:Updated Final Safety Analysis Report (UFSAR) MONTHYEARML24281A2072024-06-20020 June 2024
[Table view]Update to the Final Safety Analysis Report, Revision 37 (Redacted Version) ML24280A0012024-06-20020 June 2024 Update to the Final Safety Analysis Report (Redacted Version) ML23193A8842023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses ML23193A9072023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML23193A8962023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML23193A8902023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Frontmatter ML23193A8852023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 7, Instruments and Controls ML23193A9002023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program ML23193A9062023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics ML23193A8732023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML23193A8912023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary System ML23193A8832023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML23193A8682023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Chapter 3, Reactor ML23193A8692023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems ML23193A9012023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML23193A8742023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Chapter 4, Reactor Coolant System ML23193A8822023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Frontmatter ML23193A8582023-06-28028 June 2023 8 to Defueled Safety Analysis Report, Drawings Incorporated by Reference ML23193A8722023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Chapter 2, Site and Environment ML23193A8702023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features Systems ML23193A8942023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML23193A8562023-06-28028 June 2023 Submittal of Updates to the Final Safety Analysis Reports ML23193A8872023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML23193A8652023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary ML23193A8982023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Drawing Incorporated by Reference ML23193A8812023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations ML23193A9022023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML23193A8782023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Chapter 13, Initial Tests and Operation ML23193A8882023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 8, Electric Power ML23193A8952023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML23193A8992023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML23193A8892023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML23193A8772023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Chapter 15, License Renewal ML23193A8752023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Processing and Radiation Protection Systems ML23193A9032023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML23193A9052023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 19, License Renewal ML23193A9042023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 2, Tables 2.3-15 & Appendices, Monthly and Annual Wind Direction and Speed Distributions for 33-Foot Winds at Millstone ML23193A8592023-06-28028 June 2023 8 to Defueled Safety Analysis Report, Technical Requirements Manual ML23193A8672023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control ML23193A8862023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 18, Human Factors Engineering ML23193A8572023-06-28028 June 2023 8 to Defueled Safety Analysis Report, Redacted ML23193A8762023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML23193A8712023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Chapter 5, Structures ML23193A8662023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Drawings Incorporated by Reference - Redacted ML23193A8802023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Chapter 14, Safety Analysis ML23193A8972023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Fire Protection Evaluation Report ML22193A0232022-06-23023 June 2022 7 to Defueled Safety Analysis Report ML22193A1352022-06-23023 June 2022 5 to Updated Final Safety Analysis Report ML22193A1362022-06-23023 June 2022 5 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML22193A1332022-06-23023 June 2022 5 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance 2024-06-20 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML24280A001&oldid=3687560"