|
|
(7 intermediate revisions by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 03/02/2016 | | | issue date = 03/02/2016 |
| | title = ROP 16 Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 & 3 (Report 05000277/2015006 & 05000278/2015006) | | | title = ROP 16 Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 & 3 (Report 05000277/2015006 & 05000278/2015006) |
| | author name = Schroeder D L | | | author name = Schroeder D |
| | author affiliation = NRC/RGN-I/DRP/PB4 | | | author affiliation = NRC/RGN-I/DRP/PB4 |
| | addressee name = Hanson B | | | addressee name = Hanson B |
Line 19: |
Line 19: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter: | | {{#Wiki_filter:UNITED STATES rch 2, 2016 |
| [[Issue date::March 2, 2016]]
| |
|
| |
|
| Mr. Bryan Hanson Senior Vice President, Exelon Generation President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
| | ==SUBJECT:== |
| | ANNUAL ASSESSMENT LETTER FOR PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (REPORT 05000277/2015006 AND 05000278/2015006) |
|
| |
|
| SUBJECT: ANNUAL ASSESSMENT LETTER FOR PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (REPORT 05000277/2015006 AND 05000278/2015006)
| | ==Dear Mr. Hanson:== |
| | On February 11, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Peach Bottom Atomic Power Station (PBAPS) Units 2 and 3. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2015 through December 31, 2015. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. |
| | |
| | The NRC determined that overall, PBAPS Units 2 and 3 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at PBAPS Units 2 and 3 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. |
| | |
| | The enclosed inspection plan lists the inspections scheduled through December 31, 2017. |
| | |
| | Routine inspections performed by resident inspectors are not included in the inspection plan. |
| | |
| | In addition to ROP baseline inspections, the NRC will perform Inspection Procedure (IP) |
| | 60855.1, Operation of an ISFSI Independent Spent Fuel Storage Installation at Operating Plants. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. |
| | |
| | In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. This Order requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. This Order requires licensees to have a reliable means of remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. The audit was completed for PBAPS Units 2 and 3, and the information gathered will aid staff in development of the Final Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing TI 2515-191, Inspection of the Implementation of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communications/Staffing/Multi-Unit Dose Assessment Plans. |
|
| |
|
| ==Dear Mr. Hanson:==
| | In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
| On February 11, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Peach Bottom Atomic Power Station (PBAPS) Units 2 and 3. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2015 through December 31, 2015. This letter inspections at your facility. The NRC determined that overall, PBAPS Units 2 and 3 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at PBAPS Units 2 and 3 during the most recent quarter was within the Licensee inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through December 31, 2017. Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to ROP baseline inspections, the NRC will perform Inspection Procedure (IP) 60855.1, nstallation at Operating Plants.The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. In response to the accident at Fukushima, the Commission issued Order EA-12-Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-s with Regard to Reliable Spent remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. The audit was completed for PBAPS Units 2 and 3, and the information gathered will aid staff in development of the Final Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing TI 2515-Instrumentation Orders and Emergency Preparedness Communications/Staffing/Multi-Unit In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 610-337-5262 with any questions you have regarding this letter.
| | |
| | Please contact me at 610-337-5262 with any questions you have regarding this letter. |
| | |
| | Sincerely, |
| | /RA/ |
| | Daniel L. Schroeder, Chief Division of Reactor Projects Projects Branch 4 Docket Nos. 50-277 and 50-278 License Nos. NPF-44 and NPF-56 Enclosure: Peach Bottom Inspection/Activity Plan cc w/encl: Distribution via ListServ |
| | |
| | ML16060A376 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP RI/DRP NAME ATurilin/ AT BSmith/ BS via email JHeinly/ JH via email DSchroeder/ DLS DATE 02/25 /16 02/ 25 /16 02/24 /16 02/29 /16 |
|
| |
|
| Sincerely,/RA/ Daniel L. Schroeder, Chief Division of Reactor Projects Projects Branch 4 Docket Nos. 50-277 and 50-278 License Nos. NPF-44 and NPF-56
| | Page 1 of 2 Peach Bottom 02/24/2016 16:00:45 Inspection / Activity Plan Report 22 01/01/2016 - 12/31/2017 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 7111117T - PERMANENT PLANT MODIFICATIONS 3 2, 3 01/25/2016 01/29/2016 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 2, 3 02/08/2016 02/12/2016 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications EP - EP EXERCISE EVALUATION 4 2, 3 04/25/2016 04/29/2016 IP 7111401 Exercise Evaluation RS1234 - HP INSPECTION 1 2, 3 03/06/2016 03/10/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 03/06/2016 03/10/2016 IP 71124.02 Occupational ALARA Planning and Controls 2, 3 03/06/2016 03/10/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2, 3 03/06/2016 03/10/2016 IP 71124.04 Occupational Dose Assessment RS567PPI - HP TEAM INSPECTION 3 2, 3 06/06/2016 06/10/2016 IP 71124.05 Radiation Monitoring Instrumentation 2, 3 06/06/2016 06/10/2016 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 2, 3 06/06/2016 06/10/2016 IP 71124.07 Radiological Environmental Monitoring Program 2 06/06/2016 06/10/2016 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences 7111107T - TRIENNIAL HEAT SINK 1 2, 3 06/13/2016 06/17/2016 IP 7111107T Heat Sink Performance 3/20EXAM - PEACH BOTTOM INITIAL EXAM 4 2 02/20/2017 02/24/2017 U01942 FY-17-PB INITIAL OPERATOR LICENSING EXAM 2 03/20/2017 03/31/2017 U01942 FY-17-PB INITIAL OPERATOR LICENSING EXAM 7111108G - PB U2 INSERVICE INSPECTION 1 2 10/31/2016 11/04/2016 IP 7111108G Inservice Inspection Activities - BWR RS1234PI - HP INSPECTION 1 2, 3 10/31/2016 11/04/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 10/31/2016 11/04/2016 IP 71124.02 Occupational ALARA Planning and Controls 2, 3 10/31/2016 11/04/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2, 3 10/31/2016 11/04/2016 IP 71124.04 Occupational Dose Assessment 2, 3 10/31/2016 11/04/2016 IP 71151-OR01 Occupational Exposure Control Effectiveness 7111111B - PB REQUAL INSP WITH P/F RESULTS 2 2, 3 03/06/2017 03/10/2017 IP 7111111B Licensed Operator Requalification Program CBDI - COMPONENT DESIGN BASIS INSPECTION 6 2, 3 01/30/2017 02/03/2017 IP 7111121 Component Design Bases Inspection 2, 3 02/13/2017 02/17/2017 IP 7111121 Component Design Bases Inspection 2, 3 02/27/2017 03/03/2017 IP 7111121 Component Design Bases Inspection This report does not include INPO and OUTAGE activities. |
|
| |
|
| ===Enclosure:===
| | This report shows only on-site and announced inspection procedures. |
| Peach Bottom Inspection/Activity Plan cc w/encl: Distribution via ListServ
| |
|
| |
|
| ML16060A376 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP RI/DRP NAME ATurilin/ AT BSmith/ BS via email JHeinly/ JH via email DSchroeder/ DLS DATE 02/25 /16 02/ 25 /16 02/24 /16 02/29 /16 Page 1 of 202/24/201616:00:45Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SitePeach BottomInspection / Activity Plan01/01/2016-12/31/20177111117T-PERMANENT PLANT MODIFICATIONS3 2, 3 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T01/25/201601/29/2016 2, 3 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T02/08/201602/12/2016EP-EP EXERCISE EVALUATION4 2, 3 IPExercise Evaluation711140104/25/201604/29/2016RS1234-HP INSPECTION1 2, 3 IPRadiological Hazard Assessment and Exposure Controls71124.0103/06/201603/10/2016 2, 3 IPOccupational ALARA Planning and Controls71124.0203/06/201603/10/2016 2, 3 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0303/06/201603/10/2016 2, 3 IPOccupational Dose Assessment71124.0403/06/201603/10/2016RS567PPI-HP TEAM INSPECTION3 2, 3 IPRadiation Monitoring Instrumentation71124.0506/06/201606/10/2016 2, 3 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0606/06/201606/10/2016 2, 3 IPRadiological Environmental Monitoring Program71124.0706/06/201606/10/2016 2 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0106/06/201606/10/20167111107T-TRIENNIAL HEAT SINK1 2, 3 IPHeat Sink Performance7111107T06/13/201606/17/20163/20EXAM-PEACH BOTTOM INITIAL EXAM4 2 FY-17-PB INITIAL OPERATOR LICENSING EXAMU0194202/20/201702/24/2017 2 FY-17-PB INITIAL OPERATOR LICENSING EXAMU0194203/20/201703/31/20177111108G-PB U2 INSERVICE INSPECTION1 2 IPInservice Inspection Activities - BWR7111108G10/31/201611/04/2016RS1234PI-HP INSPECTION1 2, 3 IPRadiological Hazard Assessment and Exposure Controls71124.0110/31/201611/04/2016 2, 3 IPOccupational ALARA Planning and Controls71124.0210/31/201611/04/2016 2, 3 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0310/31/201611/04/2016 2, 3 IPOccupational Dose Assessment71124.0410/31/201611/04/2016 2, 3 IPOccupational Exposure Control Effectiveness71151-OR0110/31/201611/04/20167111111B-PB REQUAL INSP WITH P/F RESULTS2 2, 3 IPLicensed Operator Requalification Program7111111B03/06/201703/10/2017CBDI-COMPONENT DESIGN BASIS INSPECTION6 2, 3 IPComponent Design Bases Inspection711112101/30/201702/03/2017 2, 3 IPComponent Design Bases Inspection711112102/13/201702/17/2017 2, 3 IPComponent Design Bases Inspection711112102/27/201703/03/2017This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
| | Page 2 of 2 Peach Bottom 02/24/2016 16:00:45 Inspection / Activity Plan Report 22 01/01/2016 - 12/31/2017 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EP - EP PROGRAM INSPECTION 1 2, 3 03/27/2017 03/31/2017 IP 7111402 Alert and Notification System Testing 2, 3 03/27/2017 03/31/2017 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 2, 3 03/27/2017 03/31/2017 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 2, 3 03/27/2017 03/31/2017 IP 71151 Performance Indicator Verification 71152B - PI&R BIENNIAL 2 2, 3 03/13/2017 03/17/2017 IP 71152B Problem Identification and Resolution 2, 3 03/27/2017 03/31/2017 IP 71152B Problem Identification and Resolution RS12 - HP INSPECTION 1 2, 3 03/27/2017 03/31/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 03/27/2017 03/31/2017 IP 71124.02 Occupational ALARA Planning and Controls ISFSI - ISFSI LOADING CAMPAIGN INSPECTION 1 2, 3 05/08/2017 05/12/2017 IP 60855 Operation Of An ISFSI 2, 3 05/08/2017 05/12/2017 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants RS34 - HP INSPECTION 1 2, 3 05/08/2017 05/12/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2, 3 05/08/2017 05/12/2017 IP 71124.04 Occupational Dose Assessment 2 05/08/2017 05/12/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences 71124.08 - RADWASTE 1 2, 3 07/17/2017 07/21/2017 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation RS123 - HP INSPECTION 1 2, 3 10/23/2017 10/27/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 10/23/2017 10/27/2017 IP 71124.02 Occupational ALARA Planning and Controls 2, 3 10/23/2017 10/27/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2 10/23/2017 10/27/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness 7111108G - U3 INSERVICE INSPECTION 1 3 10/30/2017 11/03/2017 IP 7111108G Inservice Inspection Activities - BWR This report does not include INPO and OUTAGE activities. |
|
| |
|
| Page 2 of 202/24/201616:00:45Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SitePeach BottomInspection / Activity Plan01/01/2016-12/31/2017EP-EP PROGRAM INSPECTION1 2, 3 IPAlert and Notification System Testing711140203/27/201703/31/2017 2, 3 IPEmergency Preparedness Organization Staffing and Augmentation System711140303/27/201703/31/2017 2, 3 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140503/27/201703/31/2017 2, 3 IPPerformance Indicator Verification7115103/27/201703/31/201771152B-PI&R BIENNIAL2 2, 3 IPProblem Identification and Resolution71152B03/13/201703/17/2017 2, 3 IPProblem Identification and Resolution71152B03/27/201703/31/2017RS12-HP INSPECTION1 2, 3 IPRadiological Hazard Assessment and Exposure Controls71124.0103/27/201703/31/2017 2, 3 IPOccupational ALARA Planning and Controls71124.0203/27/201703/31/2017ISFSI-ISFSI LOADING CAMPAIGN INSPECTION1 2, 3 IPOperation Of An ISFSI6085505/08/201705/12/2017 2, 3 IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants60855.105/08/201705/12/2017RS34-HP INSPECTION1 2, 3 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0305/08/201705/12/2017 2, 3 IPOccupational Dose Assessment71124.0405/08/201705/12/2017 2 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0105/08/201705/12/201771124.08-RADWASTE1 2, 3 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0807/17/201707/21/2017RS123-HP INSPECTION1 2, 3 IPRadiological Hazard Assessment and Exposure Controls71124.0110/23/201710/27/2017 2, 3 IPOccupational ALARA Planning and Controls71124.0210/23/201710/27/2017 2, 3 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0310/23/201710/27/2017 2 IPOccupational Exposure Control Effectiveness71151-OR0110/23/201710/27/20177111108G-U3 INSERVICE INSPECTION1 3 IPInservice Inspection Activities - BWR7111108G10/30/201711/03/2017This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
| | This report shows only on-site and announced inspection procedures. |
| }} | | }} |
|
---|
Category:Inspection Plan
MONTHYEARIR 05000277/20240052024-08-29029 August 2024 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2024005 and 05000278/2024005) IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24060A1192024-02-29029 February 2024 Notification of Conduct of a Fire Protection Team Inspection IR 05000277/20230062024-02-28028 February 2024 Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 and 3 (Reports 05000277/2023006 and 05000278/2023006) IR 05000277/20230052023-08-31031 August 2023 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2023005 and 05000278/2023005) IR 05000277/20220062023-03-0101 March 2023 Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 and 3 (Reports 05000277/2022006 and 05000278/2022006) ML23019A0752023-01-19019 January 2023 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000277/2023011 and 05000278/2023011 IR 05000277/20220052022-08-31031 August 2022 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2022005 and 05000278/2022005) IR 05000277/20210062022-03-0202 March 2022 Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 and 3 (Reports 05000277/2021006 and 05000278/2021006) IR 05000277/20210052021-09-0101 September 2021 Updated Inspection Plan for the Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2021005 and 05000278/2021005) IR 05000277/20200062021-03-0303 March 2021 Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 and 3 (Reports 05000277/2020006 and 05000278/2020006) ML21091A1782021-02-0202 February 2021 Ti 2515/194 Inspection Documentation Request ML20296A3342020-10-21021 October 2020 ISI Remote Inspection - Supplemental Request for Information IR 05000277/20200052020-08-31031 August 2020 Updated Inspection Plan (Inspection Reports 05000277/2020005 and 05000278/2020005) ML20119A8852020-04-28028 April 2020 Stations, Unit 3, Long-Term Steam Dryer Inspection Plan at EPU Conditions IR 05000277/20190062020-03-0303 March 2020 Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2019006 and 05000278/2019006) IR 05000277/20190052019-08-28028 August 2019 Updated Inspection Plan (Inspection Reports 05000277/2019005 and 05000278/2019005) ML19119A1202019-04-29029 April 2019 Long-Term Steam Dryer Inspection Plan at EPU Conditions IR 05000277/20180062019-03-0404 March 2019 Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 and 3 (Reports 05000277/2018006 and 05000278/2018006) ML18330A0532018-11-21021 November 2018 Information Request for the Cyber-Security Inspection, Notification to Perform Inspection 05000277/2019403 and 05000278/2019403 IR 05000277/20180052018-08-28028 August 2018 Updated Inspection Plan (Inspection Report 05000277/2018005 and 05000278/2018005) IR 05000277/20170062018-02-28028 February 2018 Annual Assessment Letter for Peach Bottom Atomic Power Station Units 2 and 3 -(Report 05000277-2017006 and 05000278-2017006 Report 05000277-2017402 and 05000278-2017402 Report 05000277-2017501 and 05000278-2017501) ML17340A4112017-12-0505 December 2017 Notification of Conduct of a Triennial Fire Protection Baseline Inspection IR 05000277/20170052017-08-28028 August 2017 Updated Inspection Plan Letter 05000277/2017005 and 05000278/2017005 with Rpt. 22 IR 05000277/20160062017-03-0101 March 2017 Annual Assessment Letter Units 2 and 3 - Report Nos. 05000277/2016006 and 05000278/2016006 with Report 22 IR 05000277/20150062016-03-0202 March 2016 ROP 16 Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 & 3 (Report 05000277/2015006 & 05000278/2015006) IR 05000277/20150052015-09-0101 September 2015 ROP-16 Mid-Cycle Assessment Letter for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2015005 and 05000278/2015005) IR 05000277/20140012015-03-0404 March 2015 ROP 15 Annual Assessment Letter for Peach Bottom Atomic Power Station (Report 05000277/2014001 and 05000278/2014001) IR 05000277/20140062014-09-0202 September 2014 ROP-15 Mid-Cycle Performance Review and Inspection Plan Report 05000277/2014006 and 05000278/2014006 IR 05000277/20130012014-03-0404 March 2014 ROP-14 2013 Peach Bottom Atomic Power Station Annual Assessment Letter, Report 05000277/2013001 and 05000278/2013001, and Inspection Plan IR 05000277/20130062013-09-0303 September 2013 ROP-14 Mid-Cycle Performance Review and Inspection Plan Report 05000277/2013006 and 05000278/2013006 IR 05000277/20120012013-03-0404 March 2013 Annual Assessment Letter for Peach Bottom Atomic Power Station Units 2 and 3 (Report 05000277/2012001 and 05000278/2012001) ML12318A0022012-11-0909 November 2012 Notification to Perform an Inspection of Temporary Instruction 2201/004, Inspection of Implementation of Interim Cyber Security Milestones 1 - 7 and Request for Information IR 05000277/20120062012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan 2012 - Peach Bottom Atomic Power Station (Report 05000277/2012006 and 05000278/2012006) IR 05000277/20110012012-03-0505 March 2012 Annual Assessment Letter for Peach Bottom Atomic Power Station (Report 05000277-11-001 and 05000278-11-001) ML1124113452011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Peach Bottom Atomic Power Station IR 05000277/20100012011-03-0404 March 2011 Annual Assessment Letter for Peach Bottom Atomic Power Station, EOC-11 (05000277/2010001 and 05000278/2010001) ML1024404132010-09-0101 September 2010 Mid-Cycle Assessment Letter 2010 - Peach Bottom Atomic Power Station, Units 2 and 3 ML1006210092010-03-0303 March 2010 Annual Assessment Letter - Peach Bottom Atomic Power Station (05000277-10-001 and 05000278-10-001) and Report 22 ML0924402532009-09-0101 September 2009 Mid-Cycle Performance Assessment Letter - Peach Bottom Atomic Power Station IR 05000277/20090012009-03-0404 March 2009 Annual Assessment Letter - Peach Bottom Atomic Power Station (05000277/2009001 and 05000278/2009001) ML0824704542008-09-0202 September 2008 2008 Mid-Cycle Performance Assessment Letter - Peach Bottom ML0734705752007-12-13013 December 2007 ROP - Peach Bottom - Change to Inspection Plan, 12/13/07 ML0724306242007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan, for 07/01/2007 - 12/31/2008 ML0706106152007-03-0202 March 2007 Annual Assessment Letter EOC 2006 - Peach Bottom Station (05-277-07-001 and 05-278-07-001) ML0624305232006-08-31031 August 2006 Mid-Cycle Performance Review and Inspection Plan - Peach Bottom Atomic Power Station IR 05000277/20060012006-03-0202 March 2006 2006-001 - Annual Assessment Letter - Peach Bottom Atomic Power Station (Report 05000277/2006001 and 05000278/2006001) ML0524207012005-08-30030 August 2005 Mid-Cycle Performance Review and Inspection Plan - Peach Bottom Atomic Power Station ML0506107082005-03-0202 March 2005 Annual Assessment Letter 2005001-Peach Bottom ML0424404642004-08-30030 August 2004 2004 Peach Bottom Mid-Cycle Performance Review and Inspection Plan 2024-08-29
[Table view] Category:Letter
MONTHYEARIR 05000277/20240032024-11-0404 November 2024 Integrated Inspection Report 05000277/2024003 and 05000278/2024003 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24281A1012024-10-0707 October 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24221A2582024-09-0606 September 2024 Response to Request for Re-Engagement Regarding the Subsequent License Renewal Environmental Review for Peach Bottom Atomic Power Station, Units 2 and 3 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification 05000277/LER-2024-003, Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum2024-09-0505 September 2024 Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum IR 05000277/20240052024-08-29029 August 2024 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2024005 and 05000278/2024005) ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24235A0342024-08-23023 August 2024 U.S. Nuclear Regulatory Commission’S Analysis of Constellation Energy Generation’S Decommissioning Funding Status Report IR 05000277/20240102024-08-23023 August 2024 Fire Protection Team Inspection Report 05000277/2024010 and 05000278/2024010 IR 05000277/20240022024-08-14014 August 2024 Integrated Inspection Report 05000277/2024002 and 05000278/2024002 IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24225A1692024-08-12012 August 2024 10 CFR 50.46 Annual Report ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24214A3232024-08-0101 August 2024 Response to Request for Additional Information - Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) ML24191A0612024-07-0606 July 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24177A1512024-06-24024 June 2024 Post Accident Monitoring Instrumentation Report ML24166A1172024-06-20020 June 2024 Regulatory Audit Summary Regarding Proposed Alternative Schedule to Complete Decommissioning Beyond 60 Years RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000277/20243012024-06-13013 June 2024 Initial Operator Licensing Examination Report 05000277/2024301 and 05000278/2024301 RS-24-058, Regarding Subsequent License Renewal Environmental Review2024-06-0505 June 2024 Regarding Subsequent License Renewal Environmental Review ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24150A2722024-05-29029 May 2024 Annual Radiological Environmental Operating Report 81, January 1, 2023 Through December 31, 2023 ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report ML24134A1792024-05-13013 May 2024 Supplemental Information in Support of Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations IR 05000277/20240012024-05-13013 May 2024 Integrated Inspection Report 05000277/2024001 and 05000278/2024001 IR 05000277/20245012024-05-0808 May 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000277/2024501 and 05000278/2024501 ML24121A1832024-04-30030 April 2024 Pre-Submittal Meeting Presentation Material Peach Bottom ECCS Compensated Level System Replacement Project RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24120A2762024-04-23023 April 2024 Independent Spent Fuel Storage Installation (ISFSI) Facility - Annual Radioactive Effluent Release Report 66 January 1, 2023 Through December 31, 2023 CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24107A2462024-04-15015 April 2024 Submittal of Changes to Technical Specifications Bases ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24102A0472024-04-11011 April 2024 Operator Licensing Examination Approval 05000277/LER-2024-002, Uncoordinated DC Circuits Cause Unanalyzed Condition2024-04-0808 April 2024 Uncoordinated DC Circuits Cause Unanalyzed Condition RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report RS-24-023, Report on Status of Decommissioning Funding.2024-03-22022 March 2024 Report on Status of Decommissioning Funding. IR 05000277/20244022024-03-12012 March 2024 Cybersecurity Inspection Report 05000277/2024402 and 05000278/2024402 (Cover Letter Only) ML24061A2642024-03-0101 March 2024 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) Commissioners ML24060A1192024-02-29029 February 2024 Notification of Conduct of a Fire Protection Team Inspection 2024-09-06
[Table view] |
Text
UNITED STATES rch 2, 2016
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (REPORT 05000277/2015006 AND 05000278/2015006)
Dear Mr. Hanson:
On February 11, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Peach Bottom Atomic Power Station (PBAPS) Units 2 and 3. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2015 through December 31, 2015. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, PBAPS Units 2 and 3 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at PBAPS Units 2 and 3 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through December 31, 2017.
Routine inspections performed by resident inspectors are not included in the inspection plan.
In addition to ROP baseline inspections, the NRC will perform Inspection Procedure (IP)
60855.1, Operation of an ISFSI Independent Spent Fuel Storage Installation at Operating Plants. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. This Order requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. This Order requires licensees to have a reliable means of remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. The audit was completed for PBAPS Units 2 and 3, and the information gathered will aid staff in development of the Final Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing TI 2515-191, Inspection of the Implementation of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communications/Staffing/Multi-Unit Dose Assessment Plans.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 610-337-5262 with any questions you have regarding this letter.
Sincerely,
/RA/
Daniel L. Schroeder, Chief Division of Reactor Projects Projects Branch 4 Docket Nos. 50-277 and 50-278 License Nos. NPF-44 and NPF-56 Enclosure: Peach Bottom Inspection/Activity Plan cc w/encl: Distribution via ListServ
ML16060A376 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP RI/DRP NAME ATurilin/ AT BSmith/ BS via email JHeinly/ JH via email DSchroeder/ DLS DATE 02/25 /16 02/ 25 /16 02/24 /16 02/29 /16
Page 1 of 2 Peach Bottom 02/24/2016 16:00:45 Inspection / Activity Plan Report 22 01/01/2016 - 12/31/2017 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 7111117T - PERMANENT PLANT MODIFICATIONS 3 2, 3 01/25/2016 01/29/2016 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 2, 3 02/08/2016 02/12/2016 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications EP - EP EXERCISE EVALUATION 4 2, 3 04/25/2016 04/29/2016 IP 7111401 Exercise Evaluation RS1234 - HP INSPECTION 1 2, 3 03/06/2016 03/10/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 03/06/2016 03/10/2016 IP 71124.02 Occupational ALARA Planning and Controls 2, 3 03/06/2016 03/10/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2, 3 03/06/2016 03/10/2016 IP 71124.04 Occupational Dose Assessment RS567PPI - HP TEAM INSPECTION 3 2, 3 06/06/2016 06/10/2016 IP 71124.05 Radiation Monitoring Instrumentation 2, 3 06/06/2016 06/10/2016 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 2, 3 06/06/2016 06/10/2016 IP 71124.07 Radiological Environmental Monitoring Program 2 06/06/2016 06/10/2016 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences 7111107T - TRIENNIAL HEAT SINK 1 2, 3 06/13/2016 06/17/2016 IP 7111107T Heat Sink Performance 3/20EXAM - PEACH BOTTOM INITIAL EXAM 4 2 02/20/2017 02/24/2017 U01942 FY-17-PB INITIAL OPERATOR LICENSING EXAM 2 03/20/2017 03/31/2017 U01942 FY-17-PB INITIAL OPERATOR LICENSING EXAM 7111108G - PB U2 INSERVICE INSPECTION 1 2 10/31/2016 11/04/2016 IP 7111108G Inservice Inspection Activities - BWR RS1234PI - HP INSPECTION 1 2, 3 10/31/2016 11/04/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 10/31/2016 11/04/2016 IP 71124.02 Occupational ALARA Planning and Controls 2, 3 10/31/2016 11/04/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2, 3 10/31/2016 11/04/2016 IP 71124.04 Occupational Dose Assessment 2, 3 10/31/2016 11/04/2016 IP 71151-OR01 Occupational Exposure Control Effectiveness 7111111B - PB REQUAL INSP WITH P/F RESULTS 2 2, 3 03/06/2017 03/10/2017 IP 7111111B Licensed Operator Requalification Program CBDI - COMPONENT DESIGN BASIS INSPECTION 6 2, 3 01/30/2017 02/03/2017 IP 7111121 Component Design Bases Inspection 2, 3 02/13/2017 02/17/2017 IP 7111121 Component Design Bases Inspection 2, 3 02/27/2017 03/03/2017 IP 7111121 Component Design Bases Inspection This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 Peach Bottom 02/24/2016 16:00:45 Inspection / Activity Plan Report 22 01/01/2016 - 12/31/2017 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EP - EP PROGRAM INSPECTION 1 2, 3 03/27/2017 03/31/2017 IP 7111402 Alert and Notification System Testing 2, 3 03/27/2017 03/31/2017 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 2, 3 03/27/2017 03/31/2017 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 2, 3 03/27/2017 03/31/2017 IP 71151 Performance Indicator Verification 71152B - PI&R BIENNIAL 2 2, 3 03/13/2017 03/17/2017 IP 71152B Problem Identification and Resolution 2, 3 03/27/2017 03/31/2017 IP 71152B Problem Identification and Resolution RS12 - HP INSPECTION 1 2, 3 03/27/2017 03/31/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 03/27/2017 03/31/2017 IP 71124.02 Occupational ALARA Planning and Controls ISFSI - ISFSI LOADING CAMPAIGN INSPECTION 1 2, 3 05/08/2017 05/12/2017 IP 60855 Operation Of An ISFSI 2, 3 05/08/2017 05/12/2017 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants RS34 - HP INSPECTION 1 2, 3 05/08/2017 05/12/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2, 3 05/08/2017 05/12/2017 IP 71124.04 Occupational Dose Assessment 2 05/08/2017 05/12/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences 71124.08 - RADWASTE 1 2, 3 07/17/2017 07/21/2017 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation RS123 - HP INSPECTION 1 2, 3 10/23/2017 10/27/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 10/23/2017 10/27/2017 IP 71124.02 Occupational ALARA Planning and Controls 2, 3 10/23/2017 10/27/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2 10/23/2017 10/27/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness 7111108G - U3 INSERVICE INSPECTION 1 3 10/30/2017 11/03/2017 IP 7111108G Inservice Inspection Activities - BWR This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.