{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532-4352 August 9, 2017 Mr. David Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant Reg Affairs-A210 10 Center Road, P.O. Box 97 Perry, OH 44081-0097 SUBJECT: PERRY NUCLEAR POWER PLANT - NRC INITIAL LICENSE REEXAMINATION REPORT 05000 440/201 7 302
{{#Wiki_filter:ugust 9, 2017
 
==SUBJECT:==
PERRY NUCLEAR POWER PLANT - NRC INITIAL LICENSE REEXAMINATION REPORT 05000440/2017302


==Dear Mr. Hamilton:==
==Dear Mr. Hamilton:==
On July 1 9, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed the initial operator licensing reexamination process for a license applicant employed at your Perry Nuclear Power Plant. The enclosed report documents the results of the reexamination.
On July 19, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed the initial operator licensing reexamination process for a license applicant employed at your Perry Nuclear Power Plant. The enclosed report documents the results of the reexamination.


An exi t meeting was conducted on July 19, 2017, between you , other members of your staff, and Mr. Rand al Baker, Chief Operator Licensing Examiner, to review observations noted during the examination process as well as the proposed final grading of the operating test reexamination
An exit meeting was conducted on July 19, 2017, between you, other members of your staff, and Mr. Randal Baker, Chief Operator Licensing Examiner, to review observations noted during the examination process as well as the proposed final grading of the operating test reexamination.
. The NRC examiner administered the initial license reexamination operating test during the week of July 17, 2017. One Senior Reactor Operator-Upgrade applicant w as administered the reexamination.


The results of the reexamination were finalized on July 31, 2017. T he applicant passed all components of the walk-through portion of the operating test reexamination, and w as issued a senior operator license.
The NRC examiner administered the initial license reexamination operating test during the week of July 17, 2017. One Senior Reactor Operator-Upgrade applicant was administered the reexamination. The results of the reexamination were finalized on July 31, 2017. The applicant passed all components of the walk-through portion of the operating test reexamination, and was issued a senior operator license.


The reexamination , as well as documents related to the development and review (outlines, proposed examinations, review comments and resolution, etc.) of the examination will be withheld from public disclosure for 24 months , until July 1 9, 2019. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, "Public Inspections, Exemptions, Requests for Withholding."
The reexamination, as well as documents related to the development and review (outlines, proposed examinations, review comments and resolution, etc.) of the examination will be withheld from public disclosure for 24 months, until July 19, 2019. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.


Sincerely,
Sincerely,
/RA Michael Bielby Acting for/
/RA Michael Bielby Acting for/
 
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety
 
Docket No. 50-440 License No. NPF-58  


===Enclosures:===
===Enclosures:===
1. OL Examination Report 05000440/201730 2 2. Simulation Facility Fidelity Report
1. OL Examination Report 05000440/2017302 2. Simulation Facility Fidelity Report


REGION III Docket No: 50-440 License No: NPF-58 Report No: 05000 440/201 7 302 Licensee: FirstEnergy Nuclear Operating Company Facility: Perry Nuclear Power Plant Location: North Perry, Ohio Dates: July 1 7 - July 19 , 2017 Inspector:
REGION III==
R. Baker , Senior Operations Engineer - Chief Examiner Approved by: R. Orlikowski, Chief Operations Branch Division of Reactor Safety 2
Docket No: 50-440 License No: NPF-58 Report No: 05000440/2017302 Licensee: FirstEnergy Nuclear Operating Company Facility: Perry Nuclear Power Plant Location: North Perry, Ohio Dates: July 17 - July 19, 2017 Inspector: R. Baker, Senior Operations Engineer - Chief Examiner Approved by: R. Orlikowski, Chief Operations Branch Division of Reactor Safety Enclosure 1


=SUMMARY=
=SUMMARY=
Examination Report 05000 440/201 7302; 0 7/1 7/2017 - 0 7/19 2017; FirstEnergy Nuclear Operating Company
Examination Report 05000440/2017302; 07/17/2017 - 07/192017; FirstEnergy Nuclear
; Perry Nuclear Power Plant; Initial License Reexamination Report.


The announced initial operator licensing reexamination was conducted by regional U.S. Nuclear Regulatory Commission examiners in accordance with the guidance of NUREG
Operating Company; Perry Nuclear Power Plant; Initial License Reexamination Report.
-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 10.


Examination Summary The Senior Reactor Operator-Upgrade applicant passed all components of the walk-through portion of the operating test reexamination, and w as issued a senior operator license.
The announced initial operator licensing reexamination was conducted by regional U.S. Nuclear Regulatory Commission examiners in accordance with the guidance of NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 10.


  (Section 4OA5.1).
Examination Summary The Senior Reactor Operator-Upgrade applicant passed all components of the walk-through portion of the operating test reexamination, and was issued a senior operator license.


3
(Section 4OA5.1).


=REPORT DETAILS=
=REPORT DETAILS=
Line 64: Line 61:
===.1 Initial Licensing Examinations===
===.1 Initial Licensing Examinations===


a. Examination Scope The U.S. Nuclear Regulatory Commission (NRC) examiner and members of the facility licensee's staff used the guidance prescribed in NUREG
====a. Examination Scope====
-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 10, to develop, validate, administer, and grade the operating test reexamination. This reexamination consisted of only the walk
The U.S. Nuclear Regulatory Commission (NRC) examiner and members of the facility licensees staff used the guidance prescribed in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 10, to develop, validate, administer, and grade the operating test reexamination. This reexamination consisted of only the walk-through portion of the operating test; the simulator scenario portion of the operating test, as well as the written examination, were successfully completed during the initial license examination and were therefore waived for this reexamination.
-through portion of the operating test; the simulator scenario portion of the operating test, as well as the written examination, were successfully completed during the initial license examination and were therefore waived for this reexamination. Members of the facility licensee's staff prepared the outline and developed the walk-through portion of the operating test reexamination. The NRC examiner validated the proposed examination during the week of Jul y 17, 2017, with the assistance of members of the facility licensee's staff.
 
During the on
-site validation, the examiner audited the license re
-application for accuracy.


The NRC examiner, with the assistance of members of the facility licensee's staff, administered the operating test reexamination on July 18, 2017.
Members of the facility licensees staff prepared the outline and developed the walk-through portion of the operating test reexamination. The NRC examiner validated the proposed examination during the week of July 17, 2017, with the assistance of members of the facility licensees staff. During the on-site validation, the examiner audited the license re-application for accuracy. The NRC examiner, with the assistance of members of the facility licensees staff, administered the operating test reexamination on July 18, 2017.


====b. Findings====
====b. Findings====
: (1) Operating Test The NRC examiner determined that the walk-through portion of the operating test reexamination, as originally proposed by the licensee, was within the range of acceptability expected for a proposed examination. Changes made to the reexamination, documented in a document titled, "Operating Test Comments," as well as the final as-administered walk-through portion of the operating test , will be available , on July 19, 2019, electronically in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Document Access and Management System
: (1) Operating Test The NRC examiner determined that the walk-through portion of the operating test reexamination, as originally proposed by the licensee, was within the range of acceptability expected for a proposed examination. Changes made to the reexamination, documented in a document titled, Operating Test Comments, as well as the final as-administered walk-through portion of the operating test, will be available, on July 19, 2019, electronically in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Document Access and Management System.
. The NRC examiner completed grading of the operating test on July 19 , 2017.
: (2) Examination Results One Senior Reactor Operator
-Upgrade applicant was administered the reexamination.


T he applicant passed all components of the walk
The NRC examiner completed grading of the operating test on July 19, 2017.
-through portion of the operating test reexamination, and w as issued a senior operator license on July 31, 2017.
: (2) Examination Results One Senior Reactor Operator-Upgrade applicant was administered the reexamination.


===.2 Examination===
The applicant passed all components of the walk-through portion of the operating test reexamination, and was issued a senior operator license on July 31, 2017.


Security
===.2 Examination Security===


====a. Scope====
====a. Scope====
The NRC examiner reviewed and observed the licensee's implementation of examination security requirements during the examination validation and administration to assure compliance with Title10 of the Code of Federal Regulations, Section 55.49, "Integrity of Examinations and Tests."
The NRC examiner reviewed and observed the licensee's implementation of examination security requirements during the examination validation and administration to assure compliance with Title10 of the Code of Federal Regulations, Section 55.49, Integrity of Examinations and Tests. The examiners used the guidelines provided in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors, to determine acceptability of the licensees examination security activities.
 
The examiners used the guidelines provided in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," to determine acceptability of the licensee's examination security activities.


====b. Findings====
====b. Findings====
Line 96: Line 83:


{{a|4OA6}}
{{a|4OA6}}
==4OA6 Management==
==4OA6 Management Meetings==


Meetings
===.1 Exit Meeting===


===.1 Exit Meeting The chief examiner conducted an exit meeting on July 19, 2017, with Mr. D. Hamilton, Site Vice President, and other members of the facility's Operations and Training organizations.===
The chief examiner conducted an exit meeting on July 19, 2017, with Mr. D. Hamilton, Site Vice President, and other members of the facilitys Operations and Training organizations. Observations from the reexamination validation and administration were presented to the facility, and the facility verified that no post exam comments were identified for submission. The examiner presented the preliminary grading results, and asked the licensee whether any of the material used to develop or administer the examination should be considered proprietary. No proprietary or sensitive information was identified during the examination or exit meeting.
Observations from the reexamination validation and administration were presented to the facility, and the facility verified that no post exam comments were identified for submission. The examiner presented the preliminary grading results, and asked the licensee whether any of the material used to develop or administer the examination should be considered proprietary. No proprietary or sensitive information was identified during the examination or exit meeting.


ATTACHMENT:
ATTACHMENT:  


=SUPPLEMENTAL
=SUPPLEMENTAL INFORMATION=
INFORMATION=


SUPPLEMENTAL
SUPPLEMENTAL NFORMATION
NFORMATION
KEY POINTS OF CONTACT
KEY POINTS OF CONTACT Licensee  
Licensee
: [[contact::R. Torres]], Fleet Exam Team
: [[contact::R. Torres]], Fleet Exam Team
: [[contact::L. Vriezen]], Initial Licensed Operator Training Supervisor
: [[contact::L. Vriezen]], Initial Licensed Operator Training Supervisor
Line 120: Line 105:
: [[contact::J. Nance]], Resident Inspector
: [[contact::J. Nance]], Resident Inspector
: [[contact::R. Baker]], Chief Examiner
: [[contact::R. Baker]], Chief Examiner
ITEMS OPENED, CLOSED, AND DISCUSSED Opened, Closed, and Discussed None LIST OF ACRONYMS USED NRC U.S. Nuclear Regulatory
ITEMS OPENED, CLOSED, AND DISCUSSED
Commission
Opened, Closed, and Discussed
 
None
SIMULATION
LIST OF ACRONYMS USED
FACILITY FIDELITY REPORT Facility Licensee: Perry Nuclear Power Plant Facility Docket No:
NRC               U.S. Nuclear Regulatory Commission
50-440 Operating Tests Administered:
SIMULATION FACILITY FIDELITY REPORT
July 1 7 , 2017 - July 18 , 2017 The following documents observations made by the U.S. Nuclear Regulatory
Facility Licensee:                       Perry Nuclear Power Plant
Commission (NRC) examin er team during the
Facility Docket No:                       50-440
initial operator license
Operating Tests Administered:             July 17, 2017 - July 18, 2017
reexamination.
The following documents observations made by the U.S. Nuclear Regulatory
These observations do
Commission (NRC) examiner team during the initial operator license reexamination.
not constitute audit or inspection findings and are not, without further verification and review, indicative of non
These observations do not constitute audit or inspection findings and are not, without further
-compliance with Title 10 of the Code of Federal Regulations
verification and review, indicative of non-compliance with Title10 of the Code of Federal
55.45(b).
Regulations 55.45(b). These observations do not affect NRC certification or approval of the
These observations do not affect NRC certification or approval of the simulation facility other than to provide information, which may be, used in future evaluations.
simulation facility other than to provide information, which may be, used in future evaluations.
No licensee action is required in response to these observations.
No licensee action is required in response to these observations.
During the conduct of the simulator portion of the operating tests, the following items were observed: ITEM DESCRIPTION
During the conduct of the simulator portion of the operating tests, the following items were
None None
observed:
ITEM                                         DESCRIPTION
None                                             None
2
}}
}}

Revision as of 23:19, 29 October 2019

NRC Initial License Reexamination Report 05000440/2017302
ML17221A259
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 08/09/2017
From: Robert Orlikowski
Operations Branch III
To: Hamilton D
FirstEnergy Nuclear Operating Co
Shared Package
ML17142A157 List:
References
50-440/17-302, ER 2017302
Download: ML17221A259 (9)


Text

ugust 9, 2017

SUBJECT:

PERRY NUCLEAR POWER PLANT - NRC INITIAL LICENSE REEXAMINATION REPORT 05000440/2017302

Dear Mr. Hamilton:

On July 19, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed the initial operator licensing reexamination process for a license applicant employed at your Perry Nuclear Power Plant. The enclosed report documents the results of the reexamination.

An exit meeting was conducted on July 19, 2017, between you, other members of your staff, and Mr. Randal Baker, Chief Operator Licensing Examiner, to review observations noted during the examination process as well as the proposed final grading of the operating test reexamination.

The NRC examiner administered the initial license reexamination operating test during the week of July 17, 2017. One Senior Reactor Operator-Upgrade applicant was administered the reexamination. The results of the reexamination were finalized on July 31, 2017. The applicant passed all components of the walk-through portion of the operating test reexamination, and was issued a senior operator license.

The reexamination, as well as documents related to the development and review (outlines, proposed examinations, review comments and resolution, etc.) of the examination will be withheld from public disclosure for 24 months, until July 19, 2019. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA Michael Bielby Acting for/

Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58

Enclosures:

1. OL Examination Report 05000440/2017302 2. Simulation Facility Fidelity Report

REGION III==

Docket No: 50-440 License No: NPF-58 Report No: 05000440/2017302 Licensee: FirstEnergy Nuclear Operating Company Facility: Perry Nuclear Power Plant Location: North Perry, Ohio Dates: July 17 - July 19, 2017 Inspector: R. Baker, Senior Operations Engineer - Chief Examiner Approved by: R. Orlikowski, Chief Operations Branch Division of Reactor Safety Enclosure 1

SUMMARY

Examination Report 05000440/2017302; 07/17/2017 - 07/192017; FirstEnergy Nuclear

Operating Company; Perry Nuclear Power Plant; Initial License Reexamination Report.

The announced initial operator licensing reexamination was conducted by regional U.S. Nuclear Regulatory Commission examiners in accordance with the guidance of NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 10.

Examination Summary The Senior Reactor Operator-Upgrade applicant passed all components of the walk-through portion of the operating test reexamination, and was issued a senior operator license.

(Section 4OA5.1).

REPORT DETAILS

4OA5 Other Activities

.1 Initial Licensing Examinations

a. Examination Scope

The U.S. Nuclear Regulatory Commission (NRC) examiner and members of the facility licensees staff used the guidance prescribed in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 10, to develop, validate, administer, and grade the operating test reexamination. This reexamination consisted of only the walk-through portion of the operating test; the simulator scenario portion of the operating test, as well as the written examination, were successfully completed during the initial license examination and were therefore waived for this reexamination.

Members of the facility licensees staff prepared the outline and developed the walk-through portion of the operating test reexamination. The NRC examiner validated the proposed examination during the week of July 17, 2017, with the assistance of members of the facility licensees staff. During the on-site validation, the examiner audited the license re-application for accuracy. The NRC examiner, with the assistance of members of the facility licensees staff, administered the operating test reexamination on July 18, 2017.

b. Findings

(1) Operating Test The NRC examiner determined that the walk-through portion of the operating test reexamination, as originally proposed by the licensee, was within the range of acceptability expected for a proposed examination. Changes made to the reexamination, documented in a document titled, Operating Test Comments, as well as the final as-administered walk-through portion of the operating test, will be available, on July 19, 2019, electronically in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Document Access and Management System.

The NRC examiner completed grading of the operating test on July 19, 2017.

(2) Examination Results One Senior Reactor Operator-Upgrade applicant was administered the reexamination.

The applicant passed all components of the walk-through portion of the operating test reexamination, and was issued a senior operator license on July 31, 2017.

.2 Examination Security

a. Scope

The NRC examiner reviewed and observed the licensee's implementation of examination security requirements during the examination validation and administration to assure compliance with Title10 of the Code of Federal Regulations, Section 55.49, Integrity of Examinations and Tests. The examiners used the guidelines provided in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors, to determine acceptability of the licensees examination security activities.

b. Findings

No findings were identified.

4OA6 Management Meetings

.1 Exit Meeting

The chief examiner conducted an exit meeting on July 19, 2017, with Mr. D. Hamilton, Site Vice President, and other members of the facilitys Operations and Training organizations. Observations from the reexamination validation and administration were presented to the facility, and the facility verified that no post exam comments were identified for submission. The examiner presented the preliminary grading results, and asked the licensee whether any of the material used to develop or administer the examination should be considered proprietary. No proprietary or sensitive information was identified during the examination or exit meeting.

ATTACHMENT:

SUPPLEMENTAL INFORMATION

SUPPLEMENTAL NFORMATION

KEY POINTS OF CONTACT

Licensee

R. Torres, Fleet Exam Team
L. Vriezen, Initial Licensed Operator Training Supervisor
M. McFarland, Superintendent, Operations Training
P. Boissoneault, Training Manager
B. Blair, Operations Manager

U.S Nuclear Regulatory Commission

E. Sanchez, Senior Resident Inspector
J. Nance, Resident Inspector
R. Baker, Chief Examiner

ITEMS OPENED, CLOSED, AND DISCUSSED

Opened, Closed, and Discussed

None

LIST OF ACRONYMS USED

NRC U.S. Nuclear Regulatory Commission

SIMULATION FACILITY FIDELITY REPORT

Facility Licensee: Perry Nuclear Power Plant

Facility Docket No: 50-440

Operating Tests Administered: July 17, 2017 - July 18, 2017

The following documents observations made by the U.S. Nuclear Regulatory

Commission (NRC) examiner team during the initial operator license reexamination.

These observations do not constitute audit or inspection findings and are not, without further

verification and review, indicative of non-compliance with Title10 of the Code of Federal

Regulations 55.45(b). These observations do not affect NRC certification or approval of the

simulation facility other than to provide information, which may be, used in future evaluations.

No licensee action is required in response to these observations.

During the conduct of the simulator portion of the operating tests, the following items were

observed:

ITEM DESCRIPTION

None None

2