2.3-2 Operating Test Quality Checklist
ML23038A157
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 12/01/2022
From:
NRC/RGN-III/DORS/OB
To:
Energy Harbor Nuclear Corp
Greg Roach
Shared Package
ML21188A233 List:
References
Download: ML23038A157 (2)


Text

y y

y y

y y

y y

y y

(Y)es / (N)o QUALITATIVE ATTRIBUTES (continued) a b* c#

y y y

4. The events are valid with regard to physics and thermodynamics.
5. The sequencing and timing of events is reasonable and allows the examination team to observe y y y and evaluate applicant performance.
6. If time compression techniques are used, the scenario summary clearly so indicates. Operators NIA have sufficient time to carry out expected activities without undue time constraints. Cues are y N/A y

given.

y

7. The simulator modeling is not altered. y y
8. The scenarios have been validated. Pursuant to 10 CFR 55.46(d), any open simulator performance deficiencies or deviations from the referenced plant have been evaluated to ensure y y y that functional fidelity is maintained while running the planned scenarios.

All

9. Scenarios are new or significantly modified in accordance with ES-3.4. y New y y
10. Scenarios (as grouped) allow each applicant to be significantly involved in the minimum y y y number of transients, events, and evolutions specified on the version of Form 3.4-1 submitted with the scenario set.
11. Applicants are evaluated on a similar number of preidentified critical tasks y across y y y

scenarios, when possible.

y

12. The level of difficulty is appropriate to support licensing decisions for each crew position. y y Actual Attributes by (Y)es / (N)o TARGET QUANTITATIVE ATTRIBUTES per Scenario (See ES-3.4) Scenario No.

1 I 2 / 3 I 4* a b* c#

1. Malfunctions after emergency operating procedure (EOP) 3 I 2 I 1 I 1 y y y entry (1-2)
2. Abnormal events (2-4) 3 / 5 / 5 I 4 y y y
3. Major transients (1-2) #

y y y 2( )/ 1 / 1 I 1

4. EOPs entered/requiring substantive actions (1-2) 2 I 2 I 2 I 4 y y y
5. Entry into a contingency EOP with substantive actions #

1( ) / 1 / 1 I 1 y (2: 1 per scenario set; set is the entire set of scenarios y y prepared for the scheduled exam)

6. Preidentified critical tasks (2: 2) 2 / 2 / 2 I 2 y y y Printed Name/Signature Date
a. Author Rav Torres / 4/LJ 09/21/2022
b. Facility Reviewer (*) Steve Kaoostasv / C / ---+-

09/21/2022 Gregory M. Roach, Jr. l Gregory M. Roach, Jr. 10/07/2022 C. NRC Reviewer(#)

NRC Chief Examiner Gregory M. Roach, Jr. Gregory M. Roach, Jr. 10/07/2022 NRC Supervisor April M. Nguyen 12/1/2022

  • The facility licensee signature is not applicable for NRG-developed tests.
  1. An independent NRC reviewer performs the steps in column c. This may be the NRC Chief Examiner if he/she did not develop the operating test under review.

( ) Scenario also contains a Contingency MaJor that will exercise a Contingency EOP (4*) Spare Scenario ES-2.3, Page 11 of 19