L-21-087, 2021 Perry Ile Post-Exam Submittal Letter

From kanterella
Jump to navigation Jump to search
2021 Perry Ile Post-Exam Submittal Letter
ML22165A314
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 03/02/2021
From: Penfield R
Energy Harbor Nuclear Corp
To: Randy Baker
NRC/RGN-III/DRS/OLB
Baker R
Shared Package
ML20136A290 List:
References
L-21-087
Download: ML22165A314 (2)


Text

er,ergy harbor Rod L. Pe11field Site Vice President, Perry Nuclear Energy Harbor Nuclear Corp Perry Nuclear Power Plant 10 Center Road Perry, Ohio 44081 440-280-5382 724-462-0816 (cell)

PERSONALLY IDENTIFIABLE INFORMATION - WITHHOLD UNDER 10 CFR 2.390 (may be decontrolled upon removal of the enclosure)

March 2, 2021 L-21-087 ATTN: Mr. Randall Baker Chief Examiner, Operations Branch, Region Ill U.S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352

SUBJECT:

Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 NRC Post-Examination Documentation, Perry License Class 1 LOT21 10 CFR 55 In accordance with the guidance provided in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors" (Revision 11 ), ES-501, "Initial Post-Examination Activities" Section C.1, the following materials are submitted in support of the Perry Nuclear Power Plant written operator license examination conducted on the weeks of February 19, 2021 :

1. Graded written examinations (i.e., each applicant's original answer and examination cover sheets) plus two clean copies of each applicant's answer sheet (ES-403, "Grading Initial Site-Specific Written Examinations")
2. Master written examination answer keys, (No changes made while administering and grading the examinations) (ES-402, "Administering Initial Written Examinations," and ES-403)
3. Questions asked by the applicants and answers given to the applicants during the written examination (ES-402)
4. Post-examination comments made by the applicants after the written and operating examinations. No questions were challenged by the applicants.
5. Seating chart for the written examination (ES-402)
6. Completed Form ES-403-1, "Written Examination Grading Quality Checklist" (ES-403 and Section D.1)
7. Results of any performance analysis that was performed for the written examination, (No recommended substantive changes to be made) (ES-403)

Perry Nuclear Power Plant L-21-087 Page 2

8. Original Form(s) ES-201-3, "Examination Security Agreement," with a pre-and post-examination signature by every individual who had detailed knowledge of any part of the operating tests or written examination before they were administered.

The post examination performance analysis identified potential areas of weakness. Three questions on the Senior Reactor Operator Exam were missed by 50 percent or more of the applicants (SRO-10, SRO-17, & SRO-22). There were no questions missed by 50 percent or more on the RO portion of the Exam. This condition was entered into the Corrective Action Program under Condition Report 2021 -01206 for further analysis.

There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Glendon Burnham, Manager - Regulatory Compliance, at (440) 280-7538.

Sincerely, Wfl~------

Rod L. Penfield Attachments:

1. Graded Written Examinations Plus two Clean Copies of Each Applicant's Answer Sheet (including a copy of each applicants computer graded answer sheet)

2. Master Examination Answer Key (No Changes Made While Administering and Grading the Examinations)
3. Questions Asked by the Applicants and Answers Given to the Applicants during the Written Examination
4. Post-examination comments made by the applicants after the written and operating examinations.
5. Seating Chart for Written Examination
6. Completed Form ES-403-1, "Written Examination Grading Quality Checklist"
7. Results of Any Performance Analysis That Was Performed for the Written Examination, with Recommended Substantive Changes
8. Original Form ES-201-3, "Examination Security Agreement," with a Pre-and Post-examination Signature by Every Individual Who Had Detailed Knowledge of Any Part of the Operating Tests or Written Examination before They Were Administered cc: NRC Project Manager (w/o attachments)

NRC Resident Inspector (w/o attachments)

NRC Region Ill Branch Chief (w/o attachments)

NRC Document Control Desk (w/o attachments)