L-23-134, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations | 23 May 2023 | Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations | |
IR 05000440/2022301 | 24 January 2023 | 05000440/2022301 | Job Performance Measure |
ML23038A109 | 12 January 2023 | Form 2.1-1 Examination Prep Checklist | Job Performance Measure |
ML23038A114 | 12 January 2023 | NRC Exam Security Agreement | |
ML23038A145 | 12 January 2023 | 3.4-1 Events and Evolutions Checklist | |
L-22-282, NRC 2022 Post Exam Submittal Cover Letter | 4 January 2023 | NRC 2022 Post Exam Submittal Cover Letter | |
ML22333A790 | 6 December 2022 | Operator Licensing Examination Approval - Perry Nuclear Power Plant December 2022 | |
ML23038A143 | 1 December 2022 | 2.3-1 Examination Outline Quality Checklist | |
ML23038A158 | 1 December 2022 | 2.3-4 Written Examination Quality Checklist | |
ML23038A157 | 1 December 2022 | 2.3-2 Operating Test Quality Checklist | |
L-22-184, Proposed Exam Cover Letter 2022 Signed | 14 September 2022 | Proposed Exam Cover Letter 2022 Signed | Job Performance Measure |
ML23038A148 | 29 July 2022 | Day Letter Signed | |
ML22130A797 | 11 May 2022 | Confirmation of Initial License Examination | |
L-22-082, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations | 23 March 2022 | Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations | |
IR 05000440/2021301 | 8 April 2021 | NRC Initial License Examination Report 05000440/2021301 | Job Performance Measure |
ML22165A318 | 22 March 2021 | 2021 Per Ile ES-301-7 Operating Test Comments-Final | Earthquake |
ML22165A320 | 22 March 2021 | 2021 Perry Ile ES-401-4 | |
ML22165A311 | 22 March 2021 | 2021 Perry Ile Es 403-1-Final | |
ML22165A321 | 22 March 2021 | 2021 Perry Ile ES-401-9-Final Combined | Earthquake |
ML22165A308 | 22 March 2021 | 2021 Perry Ile Es 201-3 Security Agreement-Final | |
ML22165A307 | 22 March 2021 | 2021 Perry Ile ES-201-1 Exam Prep Checklist | Job Performance Measure |
L-21-087, 2021 Perry Ile Post-Exam Submittal Letter | 2 March 2021 | 2021 Perry Ile Post-Exam Submittal Letter | |
ML22165A327 | 19 February 2021 | 2021 Perry Ile Administered Written Exam with Reference Handouts-Final | Safe Shutdown High winds High Radiation Area Half scram Time to boil Operating Basis Earthquake Squib Scram Discharge Volume Severe Accident Management Guideline Time Critical Operator Action Earthquake Fuel cladding Pressure Boundary Leakage Power change |
ML22165A326 | 19 February 2021 | 2021 Perry Ile Administered Scenarios-Final | Safe Shutdown Half scram Time Critical Operator Action Earthquake Power change Unidentified leak |
ML22165A325 | 19 February 2021 | 2021 Perry Ile Administered Walkthrough JPMs-Final | High Radiation Area Offsite Dose Calculation Manual Stroke time Water Inventory Control Fire impairment Arc flash FLEX B.5.b Job Performance Measure Annual Radioactive Effluent Release Report Power-Operated Valves Fatigue Rule Fire Protection Program |
ML21032A082 | 1 February 2021 | Operator Licensing Examination Approval | |
ML22165A335 | 29 January 2021 | 2021 Perry Ile ES-301-6 Competencies Checklist Pg-1 Rev 0 | |
ML22166A032 | 29 January 2021 | 2021 Perry Ile Proposed Scenarios-Final | Safe Shutdown Half scram Time Critical Operator Action Earthquake Power change Unidentified leak |
ML22166A035 | 29 January 2021 | 2021 Perry Ile Proposed Written Exam | High Radiation Area Half scram Squib Scram Discharge Volume Severe Accident Management Guideline Time Critical Operator Action Earthquake Fuel cladding Power change |
ML22165A337 | 29 January 2021 | 2021 Perry Ile ES-401-6 - Signed | |
ML22165A333 | 29 January 2021 | 2021 Perry Ile ES-301-3 - Signed | |
ML22166A025 | 29 January 2021 | 2021 Perry Ile Proposed Walkthrough JPMs-Final | High Radiation Area Offsite Dose Calculation Manual Stroke time Water Inventory Control Fire impairment Arc flash FLEX B.5.b Job Performance Measure Annual Radioactive Effluent Release Report Power-Operated Valves Fatigue Rule Fire Protection Program |
ML22165A334 | 29 January 2021 | 2021 Perry Ile ES-301-4 - Completed | |
L-20-292, 75-Day Exam Submittal Cover Letter | 4 November 2020 | 75-Day Exam Submittal Cover Letter | Job Performance Measure |
ML22166A432 | 15 October 2020 | 2021 Perry Ile ES-301-1s-Final | Fire impairment |
ML22166A440 | 15 October 2020 | 2021 Perry Ile ES-D-1s Rev 11 Scenarios-Final | Earthquake Power change |
ML22166A434 | 15 October 2020 | 2021 Perry Ile ES-401-1 and 401-3 Outlines-Final | |
ML22166A431 | 15 October 2020 | 2021 Perry Ile ES-301-5 Transient and Event Checklist Rev 0 | |
ML22166A048 | 15 October 2020 | 2021 Perry Ile ES-201-2 - Signed | |
ML22166A433 | 15 October 2020 | 2021 Perry Ile ES-301-2s-Final | |
ML20205L369 | 23 July 2020 | Confirmation of Initial License Examination | Job Performance Measure |
IR 05000440/2019302 | 27 September 2019 | NRC Initial License Reexamination Report 05000440/2019302 (Rdb) | |
ML22144A379 | 12 September 2019 | 2019 Perry Retake Administered Written Re-Exam | Safe Shutdown Shutdown Margin High Radiation Area Half scram Time to boil Squib Overtravel Power change Coast down |
ML22144A380 | 12 September 2019 | 2019 Perry Retake Written Re-exam Reference Handouts | |
ML22144A383 | 5 September 2019 | 2019 Perry Retake Proposed Written Re-Exam | Safe Shutdown Shutdown Margin High Radiation Area Half scram Time to boil Squib Overtravel Power change Coast down |
ML22144A382 | 5 September 2019 | 2019 Perry Retake ES-401-6 Written Exam Quality Checklist | |
ML22144A340 | 3 September 2019 | 2019 Perry Retake Es 201-3 Final | |
ML22144A361 | 3 September 2019 | 2019 Perry Retake Es 403-1 | |
ML22144A360 | 3 September 2019 | 2019 Perry Retake 401-9 Final | Time to boil Squib |
ML22144A336 | 3 September 2019 | 2019 Perry Retake ES-201-1 | Job Performance Measure |