MONTHYEARIR 05000440/20230042024-01-30030 January 2024 Integrated Inspection Report 05000440/2023004 L-23-207, License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2024-01-24024 January 2024 License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs L-24-017, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2024-01-24024 January 2024 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative IR 05000440/20234022024-01-10010 January 2024 Cyber Security Inspection Report 05000440/2023402 ML24003A8032024-01-0303 January 2024 Notification of NRC Fire Protection Team Inspection Request for Information ML23321A0472023-12-20020 December 2023 Letter to Rod L. Penfield - Perry Nuclear Power Plant, Unit 1 - License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application L-23-171, CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency2023-12-0808 December 2023 CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency L-23-244, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000440/20230112023-11-28028 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000440/2023011 IR 05000440/20234032023-11-27027 November 2023 Security Baseline Inspection Report 05000440/2023403 ML23292A2972023-11-17017 November 2023 Table of Contents LAR (L-2023-LLA-0111) L-23-238, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 202023-11-10010 November 2023 Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 20 L-23-052, Submittal of the Updated Safety Analysis Report, Revision 232023-10-27027 October 2023 Submittal of the Updated Safety Analysis Report, Revision 23 ML23292A2482023-10-19019 October 2023 Fws to NRC, Federal Agency Coordination Under ESA Section 7 for Perry Nuclear Plant, Unit 1, License Renewal, and Concurrence with Not Likely to Adversely Affect Determination for Northern Long-eared Bat ML23292A2472023-10-19019 October 2023 Fws to NRC, Perry Nuclear Plant, Unit 1, License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected IR 05000440/20230032023-10-11011 October 2023 Integrated Inspection Report 05000440/2023003 ML23249A1032023-10-0303 October 2023 Letter to Rod L. Penfield, Site Vice President-Perry Nuclear Power Plant, Unit 1-Notice of Intent to Conduct Scoping Process and Prepare an Environmental Impact Statement ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure ML23261C3642023-09-25025 September 2023 License Renewal Application Online Reference Portal ML23261B0192023-09-25025 September 2023 Aging Management Audit Plan Regarding the License Renewal Application Review ML23256A3592023-09-22022 September 2023 Determination of Acceptability and Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing Regarding the Energy Harbor Nuclear Corp. Application for License Renewal L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-206, Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD2023-09-12012 September 2023 Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual IR 05000440/20234012023-08-28028 August 2023 Public - Perry Nuclear Power Plant Security Baseline Inspection Report 05000440/2023401 ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000440/20230052023-08-24024 August 2023 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2023005) ML23172A2852023-08-23023 August 2023 Safety Evaluation Irradiated Fuel Management Plan and Preliminary Decommissioning Cost Estimate ML23227A2202023-08-15015 August 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Perry Nuclear Power Plant L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-001, License Amendment Request to Remove the Table of Contents from the Technical Specifications2023-08-0707 August 2023 License Amendment Request to Remove the Table of Contents from the Technical Specifications IR 05000440/20230022023-08-0202 August 2023 Integrated Inspection Report 05000440/2023002 L-23-174, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2023-07-19019 July 2023 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative ML23198A2842023-07-17017 July 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection L-23-146, License Renewal Application for the Perry Nuclear Power Plant2023-07-0303 July 2023 License Renewal Application for the Perry Nuclear Power Plant IR 05000440/20230102023-06-29029 June 2023 Comprehensive Engineering Team Inspection Report 05000440/2023010 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III L-23-050, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-22022 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-051, Plan, Nineteenth Inservice Inspection Summary Report2023-06-22022 June 2023 Plan, Nineteenth Inservice Inspection Summary Report L-22-249, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener2023-06-0505 June 2023 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener ML23144A3562023-05-25025 May 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End of Cycle Plant Performance Assessment of Perry Nuclear Power Plant, Unit 1 L-23-134, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-23023 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) IR 05000440/20230012023-05-0404 May 2023 Integrated Inspection Report (05000440/2023001) L-23-122, Annual Radiological Environmental Operating Report2023-04-26026 April 2023 Annual Radiological Environmental Operating Report L-23-121, Annual Radiological Effluent Release Report2023-04-26026 April 2023 Annual Radiological Effluent Release Report 2024-01-30
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000440/20213012021-04-0808 April 2021 NRC Initial License Examination Report 05000440/2021301 IR 05000440/20193012019-04-24024 April 2019 NRC Initial License Examination Report 05000440/2019301 (Jxd) IR 05000440/20173022017-08-0909 August 2017 NRC Initial License Reexamination Report 05000440/2017302 IR 05000440/20173012017-04-13013 April 2017 NRC Initial License Examination Report 05000440/2017301 IR 05000440/20153012015-04-23023 April 2015 Examination Report 05000440/2015301; 02/02/2015 - 03/11/2015, Perry Nuclear Power Plant, Initial License Examination IR 05000440/20103012010-08-10010 August 2010 Er 05000440-10-301(DRS); 06/14/2010 - 06/30/2010; Firstenergy Nuclear Operating Company (Fenoc), Perry Nuclear Power Plant, Unit 1. Initial License Examination Report IR 05000440/20093012009-03-12012 March 2009 Er 05000440-09-301(DRS); 1/12/2009 - 1/21/2009; First Energy Corp., Perry Station Initial License Examination Report ML0907209522009-03-12012 March 2009 Er 05000440-09-301(DRS), on 1/12/2009 - 1/21/2009, First Energy Corp., Perry Station Initial License Examination Report IR 05000440/20073022007-09-20020 September 2007 Er 05000440-07-302, on 08/15/2007, Firstenergy Nuclear Operating Company, Perry Nuclear Power Plant. Initial License Examination Report IR 05000440/20073012007-04-26026 April 2007 Er 05000440-07-301 (Drs); 02/26/2007 - 03/02/2007; Firstenergy Nuclear Operating Company; Perry Nuclear Power Plant; Initial License Examination Report IR 05000440/20043012005-02-17017 February 2005 NRC Initial License Examination Report 50-440/04-301(DRS) ML0504806512005-02-17017 February 2005 Er 05000440-04-301(DRS); 11/29/2004-12/09/2004; Perry Nuclear Power Plant; Initial License Examination Report IR 05000440/20023012002-04-0505 April 2002 Er 05000440/2002-301, on 03/05-03/13/2002, Firstenergy Nuclear Operating Company, Perry, Unit 1. the Announced Operator Licensing Initial Examination Was Conducted by Regional Examiners in Accordance with the Guidance of NUREG-1021 2021-04-08
[Table view] |
Text
ber 20, 2007
SUBJECT:
PERRY NUCLEAR POWER PLANT, UNIT 1 NRC INITIAL LICENSE EXAMINATION REPORT 05000440/2007302(DRS)
Dear Mr. Allen:
On August 15, 2007, Nuclear Regulatory Commission (NRC) examiners completed initial operator licensing examinations at your Perry Nuclear Power Plant. The examination was a written retake examination for three license applicants that failed the February 2007 initial license written examination. The enclosed report documents the results of the retake written examinations which were discussed per telephone communication on August 28, 2007, between Mr. T. Evans, Perry Plant Training Manager, and Mr. D. McNeil, Senior Operations Engineer.
The plants training instructors administered an initial license written retake examination on August 15, 2007. One Senior Reactor Operator and two Reactor Operator applicants were administered license retake examinations. The results of the examinations were finalized on August 23, 2007. All three applicants passed all sections of their respective examinations and were issued applicable operator licenses.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). We will gladly discuss any questions you have concerning this examination.
Sincerely,
/RA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58
Enclosures:
1. Operator Licensing Examination Report 05000440/2007302(DRS)
w/Attachment: Supplemental Information 2. Simulation Facility Report 3. Written Examinations and Answer Keys (RO/SRO)
REGION III==
Docket No: 50-440 License Nos: NPF-58 Report No: 05000440/2007302(DRS)
Licensee: FirstEnergy Nuclear Operating Company Facility: Perry Nuclear Power Plant Location: Perry, OH Dates: August 15, 2007 Examiners: D. McNeil, Senior Operations Engineer Approved by: Hironori Peterson, Chief Operations Branch Division of Reactor Safety Enclosure 1
SUMMARY OF FINDINGS
ER 05000440/2007302(DRS); 08/15/2007; FirstEnergy Nuclear Operating Company,
Perry Nuclear Power Plant. Initial License Examination Report.
The announced initial operator licensing written retake examination was administered by plant training personnel in accordance with the guidance of NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9.
Examination Summary:
C Three examinations were administered (two reactor operator and one senior reactor operator).
C All applicants passed all sections of their examinations resulting in the issuance of two reactor operator and one senior reactor operator licenses. (Section 4OA5.1)
REPORT DETAILS
OTHER ACTIVITIES (OA)
4OA5 Other
.1 Initial Licensing Examinations
a. Examination Scope
Perry Nuclear Power Plant training department personnel prepared and developed the written retake examination. After NRC approval, the examinations were administered by members of the training department staff in accordance with the standards contained in NUREG-1021, Operator Licensing Examination Standards for Power Reactors.
b. Findings
Written Examination The examiners reviewed the submitted examination in accordance with the guidelines contained in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9. The examiners determined that greater than 80 percent of the submitted examination met the guidelines of NUREG 1021 and was within NRC expectations for an examination submission. Several question were modified or replaced per NRC examiner request. Changes made to the written examination were documented on Form ES-401-9, Written Examination Review Worksheet, which is available electronically in the NRC Public Document Room or from the Publicly Available Records component of the NRCs document system (ADAMS). The licensee did not submit any post-examination comments. The NRC examiners graded the written examination on August 17, 2007, and conducted a review of each missed question to determine the accuracy and validity of the examination questions.
Operating Test The examination did not have an operating test. The examination was a retake written examination only.
.2 Examination Security
a. Scope
The NRC examiners reviewed the licensee's implementation of examination security requirements during the examination development and administration to assure compliance with 10 CFR 55.49, Integrity of Examinations and Tests. The examiners used the guidelines provided in NUREG 1021, "Operator Licensing Examination Standards for Power Reactors to determine acceptability of the licensees examination security activities.
b. Findings
There were no findings or issues concerning examination security.
4OA6 Meetings
Debrief The chief examiner discussed preliminary examination results on August 15, 2007, with Mr. D. Pierson and other members of the training department staff.
Exit Meeting The chief examiner conducted an exit meeting on August 28, 2007, with Mr. T. Evans, Perry Plant Training Manager by telephone. The NRCs final examination grades were disclosed during the telephone discussion. The chief examiner asked the licensee whether any of the material used to develop or administer the examination should be considered proprietary. No proprietary nor any sensitive information was identified during the examination debrief/exit meetings.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee
- T. Evans, Plant Training Manager
- D. Pierson, Instructor
- D. Zielinski, Instructor
- J. Kelly, Instructor
Nuclear Regulatory Commission
- D. McNeil, Senior Operations Engineer
ITEMS OPENED, CLOSED, AND DISCUSSED
Opened, Closed, and Discussed
None
LIST OF DOCUMENTS REVIEWED