m energy
~
harbor Rod L. Penfield Site Vice President, Perry Nuclear Energy Harbor Nuclear Corp Perry Nuclear Power Plant 10 Center Road Perry, Ohio 44081 440-280-5382 724-462-0816 (cell)
PERSONALLY IDENTIFIABLE INFORMATION -WITHHOLD UNDER 10 CFR 2.390 (may be decontrolled upon removal of the enclosure)
January 4, 2022 L-22-282 A TIN: Mr. Gregory Roach Chief Examiner, Operations Branch, Region Ill U.S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352
SUBJECT:
Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 NRC Post-Examination Documentation, Perry License Class 1 LOT22 10 CFR 55 In accordance with the guidance provided in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors" (Revision 12), ES-4.4 "Grading And Documenting Written Examinations" Section B. 7, the following materials are submitted in support of the Perry Nuclear Power Plant written operator license examination conducted on the week of December 19, 2022:
- 1. Graded written examinations (i.e., each applicant's original answer and examination cover sheets) plus two clean copies of each applicant's answer sheet and each applicant's machine graded profile report.
- 2. Master written examination answer keys. (No changes made while administering and grading the examinations)
- 3. Questions asked by the applicants and answers given to the applicants during the written examination.
- 4. Post-examination comments made by the applicants after the written and operating examinations. No questions were challenged by the applicants. No comments were made.
- 5. Seating chart for the written examination.
- 6. Results of any performance analysis that was performed for the written examination. (No recommended substantive changes to be made and no questions were missed by more than 50% of the applicants)
Perry Nuclear Power Plant L-22-282 Page2
- 7. Original Forms Form 1.3-1, "Examination Security Agreement," with a pre-and post-examination signature by every individual who had detailed knowledge of any part of the operating tests or written examination before they were administered.
The post examination performance analysis identified no potential areas of weakness. No questions on the Senior Reactor Operator Exam and no questions on the Reactor Operator Exam were missed by 50 percent or more.
The Facility Reviewer (Shift Manager/Superintendent) confirms the quality of the grading and concurs with the collective examination results.
There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Glendon Burnham, Manager - Regulatory Compliance, at (440) 280-7538.
Sincerely, Attachments:
- 1. Graded Written Examinations Plus Two Clean Copies of Each Applicant's Answer Sheet (including a copy of each applicant's computer graded answer sheet)
- 2. Master Examination Answer Key (No Changes Made While Administering and Grading the Examinations)
- 3. Questions Asked by the Applicants and Answers Given to the Applicants during the Written Examination
- 4. Post-examination comments made by the applicants after the written and operating examinations. (none)
- 5. Seating Chart for Written Examination
- 6. Results of Any Performance Analysis That Was Performed for the Written Examination
- 7. Original Forms 1.3-1, "Examination Security Agreement," with a Pre-and Post-examination Signature by Every Individual Who Had Detailed Knowledge of Any Part of the Operating Tests or Written Examination before They Were Administered cc: NRC Project Manager (w/o attachments)
NRC Resident Inspector (w/o attachments)
NRC Region Ill Branch Chief (w/o attachments)