ML23038A148

From kanterella
Jump to navigation Jump to search
Day Letter Signed
ML23038A148
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 07/29/2022
From:
NRC/RGN-III
To:
Energy Harbor Nuclear Generation LLC
Greg Roach
Shared Package
ML21188A232 List:
References
Download: ML23038A148 (2)


Text

.a energy Perry Nuclear Power Plant 10 Center Road

~ harbor P.O. Box 97 Perry, Ohio 44081 July 29, 2022 Mr. Greg Roach USNRC Chief Examiner United States Nuclear Regulatory Commission Suite 210 2443 Warrenville Road Lisle, Illinois 60532-4351 Perry Nuclear Power Plant Docket No. 50-440 NRC Initial License Examination Outline Submittal

Dear Mr. Roach:

Enclosed for your review and approval are the outlines for the Perry Initial Licensed Operator Examination scheduled to begin December 12, 2022. These outlines are submitted in accordance with NUREG 1021, Operator Licensing Examination Standards for Power Reactors (Revision 12).

The following materials are enclosed:

  • Form 1.3-1, Examination Security Agreement (Copy) (2 pages)
  • Form 2.3-1, Examination Outline Quality Checklist - (Signed)
  • Form 2.3-2, Operating Test Quality Checklist - Rev. 0 (Unsigned)
  • Form 3.2-1, Administrative Topics Outline RO - Rev. A
  • Form 3.2-1, Administrative Topics Outline SRO - Rev. A
  • Form 3.2-2, Control Room/In-Plant Systems Outline RO - Rev. A
  • Form 3.2-2, Control Room/In-Plant Systems Outline SRO-I - Rev. A
  • Form 3.3 2, Control Room/In Plant Systems Outline SRO-U - Rev. A
  • Form 3.3-1 Scenario Outline - Rev. A (3 New & 1 Spare)
  • Form 3.4-1, Events and Evolutions Checklist - Rev. 0 (4 pages)
  • Form 4.1-1, Record of Rejected Knowledge and Abilities - Rev. A The unsigned Form 2.3-2, Operating Test Quality Checklist, is being sent to support Form 2.3-1, Examination Outline Quality Checklist. A signed version of this form will be sent with the exam materials.

There were no Rejected K/As were documented on Form 4.1-1, Record of Rejected Knowledge and Abilities.

USNRC Page 2 of 2 July 29, 2022 The expected additions to the Exam Security Agreement are additional Operation's Validation Team members.

We request these materials be withheld from public disclosure until after the completion of the exam. If you have any questions, please feel free to contact me at 440-280-5686, or Ray Torres at 440-280-5277.

teve Kapostasy Raym nd Torres Nuclear Shift Manager - Facility Representative Perry Exam Developer - Author

Subject:

Perry Training Memo - 2022 - 0001