ML22144A336

From kanterella
Jump to navigation Jump to search
2019 Perry Retake ES-201-1
ML22144A336
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 09/03/2019
From: Randy Baker
NRC/RGN-III/DRS/OLB
To:
FirstEnergy Nuclear Operating Co
Baker R
Shared Package
ML19220A197 List:
References
Download: ML22144A336 (1)


Text

ES-201 Facility:

Date of Examination:

Developed:

Written:

Facility:

NRC:

// Operating: Facility: N/A NRC: N/A Days from Exam Target Date*

Chief Examiner's Initials

-240 04/29/2019 RDB 4/29/2019

-210 04/29/2019 RDB 4/29/2019

-210 05/13/2019 RDB 5/13/2019

-210 N/A

-210 08/09/2019 RDB 5/13/2019

-195 05/13/2019 RDB 5/13/2019

-150 08/26/2019 RDB 8/22/2019

-136 N/A

-75 08/26/2019 RDB 8/22/2019

-75 N/A

-60 07/10/2019 RDB 7/8/2019

-50 09/03/2019 RDB 9/3/2019

-35 09/04/2019 RDB 9/4/2019

-35 N/A

-30 08/09/2019 RDB 8/9/2019

-14 08/23/2019 RDB 8/23/2019

-7 09/05/2019 RDB 9/5/2019

-7 09/05/2019 RDB 9/5/2019

-7 09/05/2019 RDB 9/5/2019

-7 09/05/2019 RDB 9/5/2019

-7 09/05/2019 RDB 9/5/2019 Exam Date:

09/12/2019

2. NRC examiners and facility contact assigned (C.1.d; C.2.f).
3. Facility contact briefed on security and other requirements (C.2.c). As applicable, the facility contact submits to the NRC any prescreened K/As for elimination from the written examination outline, with a description of the facilitys prescreening process (ES-401, D.1.b).
4. Reference material due for NRC-prepared exams (C.1.e; C.3.c; Attachment 3).
5. Corporate notification letter sent (C.2.e).
6. NRC-developed written examination outline (ES-401-1/2 or ES-401N-1/2 and ES-401-3 or ES-401N-3) sent to facility contact (must be on the exam security agreement) (C.1.e-f; C.2.h; C.3.d-e).

Task Description (Reference)

1. Examination administration date confirmed (C.1.a; C.2.a-b). For NRC-prepared exams, arrangements are made for the facility to submit reference materials (C.1.e; C.3.c; Attachment 3).

Form ES-201-1 PERRY NPP (RO Written Retake Exam)

Examination Preparation Checklist 12-Sep-19

7. Operating test outline(s) and other checklists due, including Forms ES-201-2, ES-201-3, ES-301-1, ES-301-2, ES-301-5, and ES-D-1, as applicable (C.1.e-f; C.3.d-e).
8. Operating test outline(s) reviewed by the NRC and feedback provided to facility licensee (C.2.h; C.3.d-e).
9. Proposed examinations (written, JPMs, and scenarios, as applicable) and outlines (Forms ES-301-1, ES-301-2, ES-D-1, ES-401-1/2 or ES-401N-1/2, and ES-401-3 or ES-401N-3); supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, ES-401-6, ES-401N-6, and any Form ES-201-2 and ES-201-3 updates); and reference materials due (C.1.e-h; C.3.d).
10. Examinations prepared by the NRC are approved by the NRC supervisor and forwarded for facility licensee review (C.1.i; C.2.h; C.3.f-g).
11. Preliminary waiver/excusal requests due (C.1.m; C.2.c; ES-202).
12. Written exam and operating test reviews completed (C.3.f).

13b. The NRC and the facility licensee conduct exam preparatory week.

14. Preliminary license applications and waiver/excusal requests, as applicable (NRC Form 398) due (C.1.m; C.2.i; ES-202).
15. Final license applications and waiver/excusal requests, as applicable (NRC Form 398), due and Form ES-201-4 prepared (C.1.m; C.2.k; ES-202).
16. Written examinations and operating tests approved by the NRC supervisor (C.2.j-k; C.3.h).

13a. Examination review results discussed between the NRC and facility licensee (C.1.i; C.1.k-l; C.2.h; C.3.g).

17. Request facility licensee management feedback on the examination (C.2.l).
18. Final applications reviewed; one or two (if more than 10) applications audited to confirm qualifications/eligibility; and examination approval and waiver/excusal letters sent (C.2.k; Attachment 5; ES-202, C.3.j; ES-204).
19. Proctoring/written exam administration guidelines reviewed with facility licensee (C.3.k).
20. Approved scenarios and job performance measures distributed to NRC examiners (C.3.i).
  • Target dates are based on facility prepared examinations and the examination date identified in the corporate notification letter. These dates are for planning purposes and may be adjusted on a case by case basis in coordination with the facility licensee.