L-22-184, Proposed Exam Cover Letter 2022 Signed

From kanterella
Jump to navigation Jump to search
Proposed Exam Cover Letter 2022 Signed
ML23038A160
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 09/14/2022
From: Penfield R
Energy Harbor Nuclear Corp
To: Gregory Roach
NRC/RGN-III/DORS/OB
Greg Roach
Shared Package
ML21188A233 List:
References
L-22-184
Download: ML23038A160 (3)


Text

m energy Energy Harbor Nuclear Corp Perry Nuclear Power Plant

~ harbor JO Center Road Perry, Ohio 44081 Rod L. Penfield 440-280-5382 Site Vice President, Perry Nuclear 724-462-0816 (cell)

September 14, 2022 L-22-184 10 CFR 55 ATTN: Gregory Roach U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352

SUBJECT:

Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 NRC Initial License Examination In accordance with NUREG-1021, 2.1, Preparing For Operator Licensing Initial Examinations enclosed are the proposed examinations, supporting documentation, and reference materials for the NRC initial license examination scheduled to be administered at the Perry Nuclear Power Plant starting December 12, 2022. The examination materials were developed in accordance with the guidelines specified in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors,"

Revision 12.

The following NUREG-1021 Forms are enclosed with the supporting documentation:

2.3-1, Examination Outline Quality Checklist 1.3-1, Examination Security Agreement 3.2-1, Administrative Topics Outline (RO & SRO) 3.2-2, Control Room/In-Plant Systems Outline (RO, SRO-I, SRO-U) 2.3-2 Operating Test Quality Checklist 3.4-1, Events and Evolutions Checklist 4.1-BWR, Boiling-Water Reactor Examination Outline 4.1-COMMON, Common Examination Outline 4.1-1, Record of Rejected Knowledge and Abilities 2.3-4, Written Examination Quality Checklist 3.3-1, Scenario Outline 3.3-2, Required Operator Actions A complete set of outline forms for both the Reactor Operator (RO) and Senior Reactor Operator (SRO) examinations are included in this submittal.

Perry Nuclear Power Plant L-22-184 Page2 It is requested that the enclosed examination materials be withheld from public disclosure until after the initial license examinations are completed. None of the materials being sent are considered Safeguards information.

There are no regulatory commitments contained in this letter. If there are questions or if additional information is required, please contact Mr. Raymond Torres at (440) 280-5277.

In accordance with 10 CFR 55.40(b)(3) and NUREG-1021, 2.1 C.4.k, the following signatures are provided:

£J Raymon_,., T eJ res

&~

Step n Kapostasy Nuclear Qualification Instructor Authorized Facility Representative Sincerely, t?bt Rod L. Penfield

Enclosures:

A Operator License Examination with Technical References B Reference Material to be Provided to Candidates for Written Examination C Job Performance Measures Examination D 2.3-1, Examination Outline Quality Checklist E 1.3-1, Examination Security Agreement F 3.2-1, Administrative Topics Outline (RO & SRO)

G 3.2-2, Control Room/In-Plant Systems Outline (RO, SRO-I, SRO-U)

H 2.3-2 Operating Test Quality Checklist I 3.4-1, Events and Evolutions Checklist J 4.1-BWR, Boiling-Water Reactor Examination Outline K 4.1-COMMON, Common Examination Outline L 4.1-1, Record of Rejected Knowledge and Abilities M 2.3-4, Written Examination Quality Checklist N 3.3-1, Scenario Outline 0 3.3-2, Required Operator Actions

cc: NRC Document Control Desk w/o Enclosures NRC Project Manager w/o Enclosures NRC Region Ill Branch Chief w/o Enclosures NRC Resident Inspector w/o Enclosures