ES-301 Transient and Event Checklist Form ES-301-5 NUREG 1021, Rev. 11 Page 1 of 5 Facility: Perry Date of Exam: Feb. 2021 Operating Test No.: 2021-1 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 3
5 x
x T
O T
A L
M I
N I
M U
(*)M(*)
Crew Position Crew Position Crew Position Crew Position S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
SRO-U
- 1 RX 1
1 1
1 0
NOR 1
2 2
1 1
1 I/C 4,7,9 3,4,5, 7,8,9, 10,11 11 4
4 2
MAJ 6
6 2
2 2
1 TS 4,5 2
0 2
2 SRO-I
- 1 RX 2
1 2
1 1
0 NOR 1
1 1
1 1
I/C 3,4,5, 7,8,9 3,5,9, 10,11 11 4
4 2
MAJ 6
6 2
2 2
1 TS 3,4 2
0 2
2 RO #1 Rx 2
1 1
1 0
NOR 2
1 1
1 1
I/C 3,5,8 4,7,8, 11 7
4 4
2 MAJ 6
6 2
2 2
1 TS 0
0 2
2 Rx NOR I/C MAJ TS Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
Crew-A
ES-301 Transient and Event Checklist Form ES-301-5 NUREG 1021, Rev. 11 Page 2 of 5 Facility: Perry Date of Exam: Feb. 2021 Operating Test No.: 2021-1 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 3
5 x
x T
O T
A L
M I
N I
M U
(*)M(*)
Crew Position Crew Position Crew Position Crew Position S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
SRO-U
- 2 RX 1
1 1
1 0
NOR 1
2 2
1 1
1 I/C 4,7,9 3,4,5, 7,8,9, 10,11 11 4
4 2
MAJ 6
6 2
2 2
1 TS 4,5 3
0 2
2 SRO-I
- 2 RX 2
1 2
1 1
0 NOR 1
1 1
1 1
I/C 3,4,5, 7,8,9 3,5,9, 10,11 11 4
4 2
MAJ 6
6 2
2 2
1 TS 3,4 2
0 2
2 RO #2 Rx 2
1 1
1 0
NOR 2
1 1
1 1
I/C 3,5,8 4,7,8, 11 7
4 4
2 MAJ 6
6 2
2 2
1 TS 0
0 2
2 Rx NOR I/C MAJ TS Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
Crew-B
ES-301 Transient and Event Checklist Form ES-301-5 NUREG 1021, Rev. 11 Page 3 of 5 Facility: Perry Date of Exam: Feb. 2021 Operating Test No.: 2021-1 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 2
3 x
x T
O T
A L
M I
N I
M U
(*)M(*)
Crew Position Crew Position Crew Position Crew Position S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
SRO-U
- 3 RX 1
1 1
1 0
NOR 2
1 2
1 1
1 I/C 3,4,5, 6,7,9 4,7,9 9
4 4
2 MAJ 8
6 2
2 2
1 TS 3,5 2
0 2
2 SRO-I
- 3 RX 1
2 2
1 1
0 NOR 1
1 1
1 1
I/C 3,4,6, 7
3,4,5, 7,8,9 10 4
4 2
MAJ 8
6 2
2 2
1 TS 3,4 2
0 2
2 RO #3 Rx 2
1 1
1 0
NOR 2
1 1
1 1
I/C 4,5,6, 9
3,5,8 7
4 4
2 MAJ 8
6 2
2 2
1 TS 0
0 2
2 Rx NOR I/C MAJ TS Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
Crew-C
ES-301 Transient and Event Checklist Form ES-301-5 NUREG 1021, Rev. 11 Page 4 of 5 Facility: Perry Date of Exam: Feb. 2021 Operating Test No.: 2021-1 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 2
3 x
x T
O T
A L
M I
N I
M U
(*)M(*)
Crew Position Crew Position Crew Position Crew Position S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
SRO-I
- 4 RX 1
2 2
1 1
0 NOR 2
1 1
1 1
I/C 3,4,5, 6,7,9 3,5,8 9
4 4
2 MAJ 8
6 2
2 2
1 TS 3,5 2
0 2
2 RO #4 RX 1
1 1
1 0
NOR 1
1 1
1 1
I/C 3,4,6, 7
4,7,9 7
4 4
2 MAJ 8
6 2
2 2
1 TS 0
0 2
2 Rx NOR I/C MAJ TS Rx NOR I/C MAJ TS Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
Crew-D
ES-301 Transient and Event Checklist Form ES-301-5 NUREG 1021, Rev. 11 Page 5 of 5 Facility: Perry Date of Exam: Feb. 2021 Operating Test No.: 2021-1 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 2
4 5
x T
O T
A L
M I
N I
M U
(*)M(*)
Crew Position Crew Position Crew Position Crew Position S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
SRO-I
- 5 RX 1
1 2
1 1
0 NOR 2
2 2
1 1
1 I/C 4,5,6, 9
3,4,5, 6,7,9 3,5,9, 10,11 15 4
4 2
MAJ 8
8 6
3 2
2 1
TS 3,5 2
0 2
2 SRO-I
- 6 RX 1
1 2
1 1
0 NOR 2
2 2
1 1
1 I/C 3,4,5, 6,7,9 3,4,6, 7
4,7,8, 11 14 4
4 2
MAJ 8
8 6
3 2
2 1
TS 3,5 2
0 2
2 SRO-I
- 7 Rx 1
1 2
1 1
0 NOR 2
2 2
1 1
1 I/C 3,4,6, 7
4,5,6, 9
3,4,5, 7,8,9, 10,11 16 4
4 2
MAJ 8
8 6
3 2
2 1
TS 4,5 2
0 2
2 Rx NOR I/C MAJ TS Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
Crew-E