ML17223B313: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 10/31/1991
| issue date = 10/31/1991
| title = Monthly Operating Repts for Oct 1991 for St Lucie Units 1 & 2.W/911113 Ltr
| title = Monthly Operating Repts for Oct 1991 for St Lucie Units 1 & 2.W/911113 Ltr
| author name = BREEN J J, SAGER D A
| author name = Breen J, Sager D
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ACCELERATED DISTRIBUTION DEMONSTPATION SYSTEMREGULATORY INFORMATION DISTRIBUTION SYSTEM(RIDS)ACCESSION NBR:9111190050 DOC.DATE:91/10/31NOTARIZED:
{{#Wiki_filter:ACCELERATED DISTRIBUTION DEMONSTPATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
NOFACIL:50-335 St.LuciePlant,Unit1,FloridaPower&LightCo.50-389St.LuciePlant,Unit2,FloridaPower&LightCo.AUTH.NAMEAUTHORAFFILIATION BREEN,J.J.
ACCESSION NBR: 9111190050             DOC. DATE: 91/10/31    NOTARIZED: NO            DOCKET FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power                & Light  Co.       05000335 50-389 St. Lucie Plant, Unit 2, Florida Power              & Light  Co.       05000389 AUTH. NAME            AUTHOR AFFILIATION BREEN,J.J.           Florida Power & Light Co.
FloridaPower&LightCo.SAGER,D.A.
SAGER,D.A.           Florida    Power & Light Co.                                             R RECIP.NAME           RECIPIENT AFFILIATION
FloridaPower&LightCo.RECIP.NAME RECIPIENT AFFILIATION DOCKET0500033505000389R


==SUBJECT:==
==SUBJECT:==
Monthlyoperating reptsforOct1991forStLucieUnits1&2.W/911113 ltr.DISTRIBUTION CODE:IE24DCOPIESRECEIVED:LTR gENCLQSIZE:TITLE:MonthlyOperating Report(perTechSpecs)NOTESDRECIPIENT IDCODE/NAME PD2-2LANORRIS,JINTERNAL:
Monthly operating repts          for  Oct 1991  for St Lucie Units      1            D 2.W/911113     ltr.                                                       &
ACRSAEOD/DSP/TPAB NRR/DOEA/OEAB RGN2EXTERNAL:
DISTRIBUTION CODE: IE24D            COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs) g  ENCL  Q  SIZE:
EG&GBRYCE,J.H NSICCOPIESLTTRENCL33111010"1111111111RECIPIENT IDCODE/NAME PD2-2PDAEOD/DOANRR/DLPQ/LPEB10 EG-=-EME--M'1NRCPDRCOPIESLTTRENCL1111111111DDRDNOTETOALL"RIDS"RECIPIENTS:
NOTES RECIPIENT              COPIES            RECIPIENT          COPIES ID  CODE/NAME            LTTR ENCL        ID CODE/NAME       LTTR ENCL              D PD2-2 LA                      3    3      PD2-2 PD                1    1 NORRIS,J                      1    1                                                  D INTERNAL: ACRS                        10    10      AEOD/DOA              1      1 AEOD/DSP/TPAB               "1          NRR/DLPQ/LPEB10 NRR/DOEA/OEAB                 1 1
ADDPLEASEHELPUSTOREDUCEWASTE!CONTACTTHEDOCUMENTCONTROLDESK,ROOMPl-37(EXT.20079)TOELIMINATE YOURNAMEFROMDISTRIBUTION LINISFORDOCUMENTS YOUDON'TNEED!TOTALNUMBEROFCOPIESREQUIRED:
1      EG-=-EME -- M'1      1 1
LTTR24ENCL24 P.O.Box128,Ft.Pierce,FL34854-0128 NOVi5199lL-91-30810CFR50.36U.S.NuclearRegulatory Commission Attn:DocumentControlDeskWashington, DC20555Gentlemen:
1 1
Re:St.LucieUnits1and2DocketNos.50-335and50-389Monthl0eratinReortAttachedaretheOctober1991Operating StatusandSummaryofOperating Experience ReportsforSt.LucieUnits1and2.Shouldyouhaveanyquestions about.thisinformation pleasecontactus~Verytrulyyours,VicePresident St.LuciePlantDAS.JJBkwcc:StewartD.Ebneter,RegionalAdministrator, RegionII,USNRCSeniorResidentInspector, USNRC,St.LuciePlantAttachments DAS/PSL$564-9191iii90050 9ii03iPDRADOCK05000335RPDRanFpLGroupcompany
RGN2                          1    1 EXTERNAL: EG&G BRYCE,J.H                1    1      NRC PDR                1      1 NSIC                          1    1 R
~~IAVERAGEDAILYUNITPOWERLEVELDOCKETNO.50-335~51NlCOMPLETED BYJ.J.BreenMONTHOCTOBER1991DAYAVERAGEDAILYPOWERLEVEL(MWe-Net) 10/1/9110/2/9110/3/9110/4/9110/5/9110/6/5'1io/7/9110/8/9118/9/5'110/10/9110/11/9110/12/9110/13/5'1 10/14/91io/15/91io/16/9110/17/5'1 10/18/9110/15'/91 10/20/9110/21/5'1 10/22/9110/23/5'1 10/24/9118/25/9110/26/9118/27/5'1 10/28/9110/29/9110/30/91io/31/5'1 838842747722843840839842845845844843840837838838839765-25-17-11-15-3-4-3-24-4 OPERATXNG STATUSOPERATXNG DATAREPORTDOCI(ETNO50-335DATESOYi5QgfCOMPLETED BYJtJ.BREENTELEPHONE 407/468/4248 1.UNTTNAMEtSTtLUCXE,UNXT12.REPORTING PERXODfOCTOBER19'9i3tLXCENSEDTHERMALPOWER(MWT)t27004tNAMEPLATE RATXNG(GRQSSMWE)t8505tDESXGNELECTRXCAL RATXNG(NETMWE)t830btMAXXMUMDEPENDABLE CAPACXTY(GROSSMWE)l8727,MAXXMUMDEPENDABLE CAPACXTY(NETMWE):8398,XFCHANGESOCCURXNCAPhCXTYRATXNGS<XTEMSNUMBER3THROUGH7)SXNCELASTREPORTrGXVEREASONSt9,POWERLEVFLTOWHXCHRESTRXCTED XFANY(NETMWE)ie.REASONSFORRESTRXCTXONS~
D A
XFANYtMONTHLY-YTD-CUMULATXVE 11.HOURSXNREPORTPERXODl12,NUMBEROFHOURSREACTOI'AS CRXTXCAL13tREACTORRESERVESHUTDOWNHOURS14,HOURSGENE~ATO~
D D
ON-LXNE15.UNXTRESERVESHUTDOWNHOURS16~GROSSTHERMAI..
NOTE TO ALL "RIDS" RECIPIENTS:
FNERGYfENERATED(MWI-I)17.GROSSELECTRXCAL ENERGYGENERATED (MWH)18.NETELECTRXCAL ENERGYGENERATED
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LINIS FOR DOCUMENTS YOU DON'T NEED!
<MWH)19tUNXTSERVXCEFACTOR20,UNXTAVAXLhBXLXTY FACTOR21.CAPACXTYFACTOR(USXNGMDCNET)22CAPACXTYFACTOR(USXNGDERNET)23tUNXTFORCEDOUTAGERATE24.SHUTDOWNS SCI-IEDULED OVERNEXT6MONTHSSHUTDOWNFORREFUELXNG QN10/18/9it 745432.40'432.10.0114570137593035393958t058'56.657t20.072966882tiet06857,5Ot0180044585965430564911294t094t092t393t3t2130272.099840.6205t398961tH39'255246512 841740707954185476t07bt075t574th4.125tXFSHUTDOWNATENDOFREPORTPERXQD~ESTXMATED DATEOFSTARTUPl12/19/91 UNITSHUTDOWNS ANDPOWERREDUCTIONS DOCKETNO,UNITNAMEDATECOMPLETED BYTELEPHONE TLIENIT1SQVi5Qe>JBREEN44-424REPORTMONTH0TBERIIDateTypeDuration(Hours)Reason'ethod ofShuttingDownReactor'icensee EventReporttntSystemCode'omponent Code'ause EcCorrective ActiontoPreventRecurrence 24911018312.54N/ARCFUELEXUnit1downpowered onOctober18,1991forrefueling.
TOTAL NUMBER OF COPIES REQUIRED: LTTR              24  ENCL    24
FForcedSSchcdukdReasonh-Equipmcnt failure(explain)
 
B-Maiiatcnanee orTestC-Refueling D-Regulatory restrictio E-OperatorTraininggtUccnseExsnunation F-hdmhtistradve G-Operational Error(Expalin)
P.O. Box 128, Ft. Pierce, FL 34854-0128 NOV    i 5 199l L-91-308 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn:     Document Control Desk Washington,           DC    20555 Gentlemen:
H-Other(Explain)
Re:     St. Lucie Units            1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Attached are the October 1991 Operating Status                      and      Summary    of Operating Experience Reports for St. Lucie Units                  1 and        2.
Method1Manual2-ManualScram3-hutomatic Scram4-Continued 5-LoadReduction 9-Other(Explain)
Should you have any questions about.       this information please contact us ~
ExtubitG-instructions forpreparation ofDataEntrySheetsLicenseeEventReport(LER)File(NUREG41161)
Very    truly yours, Vice President St. Lucie Plant DAS.JJB kw cc:     Stewart D. Ebneter, Regional Administrator, Region Senior Resident Inspector, USNRC, St. Lucie Plant II, USNRC Attachments DAS/PSL     $ 564-91 91iii90050 9ii03i PDR    ADOCK      05000335 R                          PDR an FpL Group company
Exhil>it1-SameSource SUMMARYOFOPERATING EXPERIENCE DOCKETNO+50-335~IIBV3COMPLETED BYJ.J.BreenREPORTMONTHOCTOBER1991OnOctober18,1991,Unit1wasmanuallydownpowered forrefueling.
 
Inaccordance withtherequirements ofTechnical Specification 6.9.1.6,therewerenochallenges tothePORVsorsafetyvalvesduringthereportperiod.
~~
AVERAGEDAILYUNITPOWERLEVELDOCKETNO.50-389~~~~0)COMPLETED BYJ.J.BreenMONTHOCTOBER1991DAYAVERAGEDAILYPOWERLEVEL(MWe-Net) 10/1/9110/2/9110/3/9118/4/9110/5/9110/6/9118/7/9110/8/91io/9/9110/10/9110/11/9110/12/9110/13/9110/14/9110/15/9110/16/9110/17/9110/18/9110/19/9110/20/9110/21/9110/22/9110/23/9110/24/9110/25/9110/26/9110/27/9110/28/9110/29/9110/38/9110/31/91856857857858857855856858860860860860860859859868859860868861851858858859757658Ct't664701728798 QF'ERATXNG DATAREI='OliTOPERATXNG STATUSDQCI<ETNO50-38'9DATEgov~sectCOMPLE1'ED BYJ.JBREENTELEPI.IONE 407/468/4248 liUNITNAMEiST.LUCXEUNIT22,RLPORTING PERIOD:OCTOBER19913.LXCENSEDTHERMALPOHER<MMT):27084+NAMEPLATE RATXNG(GROSSMME)+8585,DESIGNELECTRICAL RATING<NETMWE>:8386iMAXIMUMDEPENDABLE CAPACI1'Y (GROSSMHE)l8827+MAXXMUMDEPENDABLE CAF'ACXTY (NETMHE>o$398.IFCHANGESOCCURXNCAPACITYRATXNGS(ITEMSNUMBER3THROUGH7>SINCELASTREPORTGIVEREASONS;POHERLEVELTQWHICHRESTRICTED'F ANY(NETMHE)18+REASONSFORRESTRICTIONS rXFANYlMONTHLY-YTD-CUMUL*TXVE 11,HOURSXNREPORTPERIOD;12.NUMBERQFI-IQURSREACTORHASCRITICAL13'EACTOR RESERVESHUTDQHNHOURS14,HOURSGENERATOR ON-LINE15.UNITRESERVESHUTDOWNHOURS.16'ROSS1'HERMALENERGYGENERATED (MHH)17.GROSSELECTRICAL ENERGYGENERATED (MHH)18.NETELECTRICAL ENERGYGENERATED (MWH)19.UNITSERVXCEFACTOR28+UNITAVAILABILXTY FACTOR21.CAF'ACXTY FACTOR(USINGMDCNET)2P.CAI='ACXTY FACTOR<USXNGDERNET)23iUNXTFORCEDOUTAGERATE24.SHUTDOWNS SCI-IEDULEO OVERNEXT6MONTHS:745745.0,8i8745.00.01941245647950613982188o8180.098'99i38i872967296+88i87296i88i819403258650908061760371000188i8100i9102.00.072169.862156.30'61140.38i8160192331 534060005051814084F784.784i985o825.XFSHUTDOWNATENDOFREPORTPERIOD)ESTIMATED DATEOFSTARTUP+
I AVERAGE  DAILY UNIT    POWER LEVEL DOCKET NO. 50-335 COMPLETED BY
UNITSHUTDOWNS ANDPOWERREDUCTIONS DOCKETNO.UNITNAMEDATECOMPLETED BYTELEPHONE 0-TLIE2NOV15Q81BREEN44-424REPORTMONTHTBERIINo.DateTypeDuration(Hours)Reason'ethod ofShuttingDownReactor'icensee EventReport&#xb9;SystemCode'omponent Code'ause
                                            ~51 J.J. Breen Nl MONTH    OCTOBER    1991 DAY AVERAGE    DAILY POWER LEVEL (MWe-Net) 10/ 1/91          838 10/ 2/91          842 10/ 3/91          747 10/ 4/91          722 10/ 5/91          843 10/ 6/5'1          840 io/ 7/91          839 10/ 8/91            842 18/ 9/5'1          845 10/10/91            845 10/11/91          844 10/12/91          843 10/13/5'1         840 10/14/91          837 io/15/91            838 io/16/91            838 10/17/5'1           839 10/18/91            765 10/15'/91           -25 10/20/91            -17 10/21/5'1           -11 10/22/91            -15 10/23/5'1             -3 10/24/91 18/25/91              -4 10/26/91 18/27/5'1             -3 10/28/91              -2 10/29/91              4 10/30/91 io/31/5'1             -4
&,Corrective ActiontoPreventRecurrence 9110250.0N/AHFXXXXXXUnit2downpowered forwaterboxcleaning.
 
FForcedSScheduled Reasonh-Equipment failure(explain)
OPERATXNG DATA REPORT DOCI(ET NO          50  335 DATE COMPLETED BY SOY Jt J.
B-Maintenance orTestC-Refueling D-Reguhtocy resuicuon E-OperatorTrainingdcIsccascExamination F-hdministrative G-Operational Error(Expalin)
iBREEN 5 Qgf TELEPHONE      407/468/4248 OPERATXNG STATUS
H-Other(Explain)
: 1. UNTT NAMEt    STt LUCXE ,     UNXT 1
Method1-Maaual2-ManualScram3-hutomatic Scram4-Continued 5-LoadRcductioa 9-Other(Explain)
: 2. REPORTING PERXOD f OCTOBER 19'9i 3t  LXCENSED THERMAL POWER (MWT)t                    2700 4t  NAMEPLATE RATXNG (GRQSS MWE)t                    850 5t  DESXGN ELECTRXCAL RATXNG (NET MWE)t              830 bt  MAXXMUM DEPENDABLE CAPACXTY (GROSS MWE)l          872 7,   MAXXMUM DEPENDABLE CAPACXTY (NET MWE):           839 8,   XF CHANGES OCCUR XN CAPhCXTY RATXNGS <XTEMS NUMBER 3 THROUGH        7)
ExlubitG-Iastructioas forPreparation ofDataEntrySheetsLiccnsceEventRcport(LER)File(NUREG4161)
SXNCE LAST REPORTr GXVE REASONSt 9,   POWER LEVFL TO WHXCH RESTRXCTED XF ANY (NET MWE) ie. REASONS FOR RESTRXCTXONS~ XF ANYt MONTHLY    -YTD-   CUMULATXVE
Exhibit1-SameSouccc 8UMMARYOFOPERATING EXPERIENCE DOCKETNO~50-389,UNIT8t.Lucie2DATE'80COMPLETED BYJ.J.BreenTELEPHONE 407468-4248REPORTMONTHOCTOBER1991FromOctober25,1991,toOctober31,1991,Unit2downpowered forwaterboxcleaning.
: 11. HOURS XN REPORT PERXODl                          745        7296        130272.0 12,   NUMBER OF HOURS REACTOI'AS CRXTXCAL              432.4      6882ti        99840.6 13t  REACTOR RESERVE SHUTDOWN HOURS                      0'          et0          205t3 14,   HOURS GENE~ATO~ ON-LXNE                          432.1      6857,5        98961tH
Inaccordance withtherequirements ofTechnical Specification 6.9.1.6,therewerenochallenges tothePORVsorsafetyvalvesduringthereportperiod.}}
: 15. UNXT RESERVE SHUTDOWN HOURS                        0.0        Ot0            39 '
16 ~ GROSS THERMAI.. FNERGY f ENERATED (MWI-I)     1145701    18004458    255246512
: 17. GROSS ELECTRXCAL ENERGY GENERATED (MWH)         375930    5965430      84174070
: 18. NET ELECTRXCAL ENERGY GENERATED <MWH)           353939    5649112      79541854 19t  UNXT SERVXCE FACTOR                                58t0        94t0            76t0 20,   UNXT AVAXLhBXLXTYFACTOR                            58 '        94t0            7bt0
: 21. CAPACXTY FACTOR (USXNG MDC NET)                   56.6        92t3            75t5 22    CAPACXTY FACTOR (USXNG DER NET)                   57 t 2      93t3            74th 23t  UNXT FORCED OUTAGE RATE                            0.0          t2            4.1
: 24. SHUTDOWNS SCI-IEDULED OVER NEXT 6 MONTHS SHUTDOWN FOR REFUELXNG QN    10/18/9it 25t  XF SHUT DOWN AT END OF REPORT PERXQD~ ESTXMATED DATE OF STARTUPl        12/19/91
 
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO, UNIT NAME                        TL        IE NIT 1 DATE                                SQV    i 5 Qe>
COMPLETED BY                        J    BREEN TELEPHONE                      4        4 -424 REPORT MONTH 0 T BER I                            I Date  Type Duration (Hours)
Reason'ethod of Shutting Reactor'icensee Event Report System Code'omponent     Code'ause                   Ec Corrective Action to Down                  tnt                                          Prevent Recurrence 24        911018      312.54                                              N/A        RC            FUELEX  Unit 1 downpowered on October 18, 1991 for refueling.
F Forced                        Reason                                            Method                                Extubit G - instructions for S Schcdukd                      h - Equipmcnt failure (explain)                   1  Manual                            preparation of Data Entry B - Maiiatcnanee or Test                          2- Manual Scram                        Sheets Licensee Event Report C - Refueling                                     3 - hutomatic Scram                    (LER) File (NUREG41161)
D - Regulatory restrictio                         4 - Continued E - Operator Training gt Uccnse Exsnunation      5 - Load Reduction F - hdmhtistradve                                 9 - Other (Explain)                    Exhil>it 1 - Same Source G - Operational Error (Expalin)
H - Other (Explain)
 
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO+ 50-335
                                                    ~IIBV  3 COMPLETED BY J.J. Breen REPORT MONTH  OCTOBER  1991 On October 18, 1991, Unit 1 was manually downpowered for refueling.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.
 
AVERAGE DAILY UNIT POWER LEVEL MONTH    OCTOBER DOCKET NO.
COMPLETED BY 1991
                                      ~50-389
                                      ~0)
J.J.
                                              ~~
Breen DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 10/ 1/91        856 10/ 2/91        857 10/ 3/91        857 18/ 4/91        858 10/ 5/91        857 10/ 6/91        855 18/ 7/91        856 10/ 8/91        858 io/ 9/91        860 10/10/91        860 10/11/91        860 10/12/91        860 10/13/91        860 10/14/91        859 10/15/91        859 10/16/91        868 10/17/91        859 10/18/91          860 10/19/91          868 10/20/91          861 10/21/91          851 10/22/91          858 10/23/91          858 10/24/91          859 10/25/91          757 10/26/91          658 10/27/91          Ct't 10/28/91          664 10/29/91          701 10/38/91          728 10/31/91          798
 
QF'ERATXNG DATA REI='Oli T DQCI<ET NO            50  38'9 DATE                  gov ~sect COMPLE1'ED BY      J. J  BREEN TELEPI.IONE       407/468/4248 OPERATXNG STATUS li 2,
UNIT NAMEi    ST. LUCXE RLPORTING PERIOD:
UNIT 2 OCTOBER 1991
: 3. LXCENSED THERMAL POHER <MMT):                       2708 4+ NAMEPLATE RATXNG (GROSS MME)+                           858 5, DESIGN ELECTRICAL RATING <NET MWE>:                     838 6i MAXIMUM DEPENDABLE CAPACI1'Y (GROSS MHE)l              882 7+ MAXXMUM DEPENDABLE CAF'ACXTY (NET MHE>o                 $ 39
: 8. IF CHANGES OCCUR XN CAPACITY RATXNGS (ITEMS NUMBER 3 THROUGH 7>
SINCE LAST REPORT GIVE REASONS; POHER LEVEL TQ WHICH RESTRICTED'F ANY (NET MHE) 18+ REASONS FOR RESTRICTIONS r XF ANY l MONTHLY        -YTD- CUMUL*TXVE 11,   HOURS XN REPORT PERIOD;                               745          7296            72169.8
: 12. NUMBER QF I-IQURS REACTOR HAS CRITICAL                745.0        7296+8          62156.3 13'EACTOR RESERVE SHUTDQHN HOURS                              ,
8i8        8i8              0' 14, HOURS GENERATOR ON-LINE                                745.0        7296 i 8        61140.3
: 15. UNIT RESERVE SHUTDOWN HOURS.                                0.0        8i8              8i8 16'ROSS 1'HERMAL ENERGY GENERATED (MHH)               1941245        19403258        160192331
: 17. GROSS ELECTRICAL ENERGY GENERATED (MHH)               647950        6509080        53406000
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)                 613982        6176037        50518140
: 19. UNIT SERVXCE FACTOR                                    188o8        100 0            84 7 F
28+ UNIT A VAILABILXTYFACTOR                                180.0        188i8            84.7
: 21. CAF'ACXTY FACTOR (USING MDC NET)                         98'          100 i 9          84i9 2P. CAI='ACXTY FACTOR <USXNG DER NET)                       99i3        102.0            85o8 23i UNXT FORCED OUTAGE RATE                                    8i8        0.0
: 24. SHUTDOWNS SCI-IEDULEO OVER NEXT 6 MONTHS :
: 25. XF SHUT DOWN AT END OF REPORT PERIOD) ESTIMATED DATE OF STARTUP+
 
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.                         0-UNIT NAME                        TL        IE    2 DATE                              NOV    15  Q81 COMPLETED BY                            BREEN TELEPHONE                        4      4  -424 REPORT MONTH                        T BER I        I No.         Date  Type Duration (Hours)
Reason'ethod of Shutting Reactor'icensee Event Report System Code'omponent   Code'ause                 &, Corrective Action to Down                    &#xb9;                                          Prevent Recurrence 911025        0.0                                                N/A        HF          XXXXXX  Unit 2 downpowered for waterbox cleaning.
F Forced                          Reason                                            Method                              Exlubit G - Iastructioas for S Scheduled                      h - Equipment failure (explain)                   1 - Maaual                          Preparation of Data Entry B - Maintenance or Test                            2 - Manual Scram                    Sheets Liccnsce Event Rcport C - Refueling                                     3 - hutomatic Scram                  (LER) File (NUREG4161)
D - Reguhtocy resuicuon                           4 - Continued E - Operator Training dc Isccasc Examination      5 - Load Rcductioa F - hdministrative                                 9 - Other (Explain)                  Exhibit 1 - Same Souccc G - Operational Error (Expalin)
H - Other (Explain)
 
8UMMARY OF OPERATING EXPERIENCE DOCKET NO ~   50-389
                                                ,UNIT  8t.' Lucie 2 DATE          8 0 COMPLETED BY  J.J. Breen TELEPHONE    407  468-4248 REPORT MONTH  OCTOBER  1991 From October 25, 1991, to October 31, 1991, Unit  2  downpowered  for waterbox cleaning.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.}}

Latest revision as of 21:42, 29 October 2019

Monthly Operating Repts for Oct 1991 for St Lucie Units 1 & 2.W/911113 Ltr
ML17223B313
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 10/31/1991
From: Breen J, Sager D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-91-308, NUDOCS 9111190050
Download: ML17223B313 (11)


Text

ACCELERATED DISTRIBUTION DEMONSTPATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR: 9111190050 DOC. DATE: 91/10/31 NOTARIZED: NO DOCKET FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION BREEN,J.J. Florida Power & Light Co.

SAGER,D.A. Florida Power & Light Co. R RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Oct 1991 for St Lucie Units 1 D 2.W/911113 ltr. &

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs) g ENCL Q SIZE:

NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD2-2 LA 3 3 PD2-2 PD 1 1 NORRIS,J 1 1 D INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB "1 NRR/DLPQ/LPEB10 NRR/DOEA/OEAB 1 1

1 EG-=-EME -- M'1 1 1

1 1

RGN2 1 1 EXTERNAL: EG&G BRYCE,J.H 1 1 NRC PDR 1 1 NSIC 1 1 R

D A

D D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LINIS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24

P.O. Box 128, Ft. Pierce, FL 34854-0128 NOV i 5 199l L-91-308 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Gentlemen:

Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Attached are the October 1991 Operating Status and Summary of Operating Experience Reports for St. Lucie Units 1 and 2.

Should you have any questions about. this information please contact us ~

Very truly yours, Vice President St. Lucie Plant DAS.JJB kw cc: Stewart D. Ebneter, Regional Administrator, Region Senior Resident Inspector, USNRC, St. Lucie Plant II, USNRC Attachments DAS/PSL $ 564-91 91iii90050 9ii03i PDR ADOCK 05000335 R PDR an FpL Group company

~~

I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-335 COMPLETED BY

~51 J.J. Breen Nl MONTH OCTOBER 1991 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 10/ 1/91 838 10/ 2/91 842 10/ 3/91 747 10/ 4/91 722 10/ 5/91 843 10/ 6/5'1 840 io/ 7/91 839 10/ 8/91 842 18/ 9/5'1 845 10/10/91 845 10/11/91 844 10/12/91 843 10/13/5'1 840 10/14/91 837 io/15/91 838 io/16/91 838 10/17/5'1 839 10/18/91 765 10/15'/91 -25 10/20/91 -17 10/21/5'1 -11 10/22/91 -15 10/23/5'1 -3 10/24/91 18/25/91 -4 10/26/91 18/27/5'1 -3 10/28/91 -2 10/29/91 4 10/30/91 io/31/5'1 -4

OPERATXNG DATA REPORT DOCI(ET NO 50 335 DATE COMPLETED BY SOY Jt J.

iBREEN 5 Qgf TELEPHONE 407/468/4248 OPERATXNG STATUS

1. UNTT NAMEt STt LUCXE , UNXT 1
2. REPORTING PERXOD f OCTOBER 19'9i 3t LXCENSED THERMAL POWER (MWT)t 2700 4t NAMEPLATE RATXNG (GRQSS MWE)t 850 5t DESXGN ELECTRXCAL RATXNG (NET MWE)t 830 bt MAXXMUM DEPENDABLE CAPACXTY (GROSS MWE)l 872 7, MAXXMUM DEPENDABLE CAPACXTY (NET MWE): 839 8, XF CHANGES OCCUR XN CAPhCXTY RATXNGS <XTEMS NUMBER 3 THROUGH 7)

SXNCE LAST REPORTr GXVE REASONSt 9, POWER LEVFL TO WHXCH RESTRXCTED XF ANY (NET MWE) ie. REASONS FOR RESTRXCTXONS~ XF ANYt MONTHLY -YTD- CUMULATXVE

11. HOURS XN REPORT PERXODl 745 7296 130272.0 12, NUMBER OF HOURS REACTOI'AS CRXTXCAL 432.4 6882ti 99840.6 13t REACTOR RESERVE SHUTDOWN HOURS 0' et0 205t3 14, HOURS GENE~ATO~ ON-LXNE 432.1 6857,5 98961tH
15. UNXT RESERVE SHUTDOWN HOURS 0.0 Ot0 39 '

16 ~ GROSS THERMAI.. FNERGY f ENERATED (MWI-I) 1145701 18004458 255246512

17. GROSS ELECTRXCAL ENERGY GENERATED (MWH) 375930 5965430 84174070
18. NET ELECTRXCAL ENERGY GENERATED <MWH) 353939 5649112 79541854 19t UNXT SERVXCE FACTOR 58t0 94t0 76t0 20, UNXT AVAXLhBXLXTYFACTOR 58 ' 94t0 7bt0
21. CAPACXTY FACTOR (USXNG MDC NET) 56.6 92t3 75t5 22 CAPACXTY FACTOR (USXNG DER NET) 57 t 2 93t3 74th 23t UNXT FORCED OUTAGE RATE 0.0 t2 4.1
24. SHUTDOWNS SCI-IEDULED OVER NEXT 6 MONTHS SHUTDOWN FOR REFUELXNG QN 10/18/9it 25t XF SHUT DOWN AT END OF REPORT PERXQD~ ESTXMATED DATE OF STARTUPl 12/19/91

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO, UNIT NAME TL IE NIT 1 DATE SQV i 5 Qe>

COMPLETED BY J BREEN TELEPHONE 4 4 -424 REPORT MONTH 0 T BER I I Date Type Duration (Hours)

Reason'ethod of Shutting Reactor'icensee Event Report System Code'omponent Code'ause Ec Corrective Action to Down tnt Prevent Recurrence 24 911018 312.54 N/A RC FUELEX Unit 1 downpowered on October 18, 1991 for refueling.

F Forced Reason Method Extubit G - instructions for S Schcdukd h - Equipmcnt failure (explain) 1 Manual preparation of Data Entry B - Maiiatcnanee or Test 2- Manual Scram Sheets Licensee Event Report C - Refueling 3 - hutomatic Scram (LER) File (NUREG41161)

D - Regulatory restrictio 4 - Continued E - Operator Training gt Uccnse Exsnunation 5 - Load Reduction F - hdmhtistradve 9 - Other (Explain) Exhil>it 1 - Same Source G - Operational Error (Expalin)

H - Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO+ 50-335

~IIBV 3 COMPLETED BY J.J. Breen REPORT MONTH OCTOBER 1991 On October 18, 1991, Unit 1 was manually downpowered for refueling.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.

AVERAGE DAILY UNIT POWER LEVEL MONTH OCTOBER DOCKET NO.

COMPLETED BY 1991

~50-389

~0)

J.J.

~~

Breen DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 10/ 1/91 856 10/ 2/91 857 10/ 3/91 857 18/ 4/91 858 10/ 5/91 857 10/ 6/91 855 18/ 7/91 856 10/ 8/91 858 io/ 9/91 860 10/10/91 860 10/11/91 860 10/12/91 860 10/13/91 860 10/14/91 859 10/15/91 859 10/16/91 868 10/17/91 859 10/18/91 860 10/19/91 868 10/20/91 861 10/21/91 851 10/22/91 858 10/23/91 858 10/24/91 859 10/25/91 757 10/26/91 658 10/27/91 Ct't 10/28/91 664 10/29/91 701 10/38/91 728 10/31/91 798

QF'ERATXNG DATA REI='Oli T DQCI<ET NO 50 38'9 DATE gov ~sect COMPLE1'ED BY J. J BREEN TELEPI.IONE 407/468/4248 OPERATXNG STATUS li 2,

UNIT NAMEi ST. LUCXE RLPORTING PERIOD:

UNIT 2 OCTOBER 1991

3. LXCENSED THERMAL POHER <MMT): 2708 4+ NAMEPLATE RATXNG (GROSS MME)+ 858 5, DESIGN ELECTRICAL RATING <NET MWE>: 838 6i MAXIMUM DEPENDABLE CAPACI1'Y (GROSS MHE)l 882 7+ MAXXMUM DEPENDABLE CAF'ACXTY (NET MHE>o $ 39
8. IF CHANGES OCCUR XN CAPACITY RATXNGS (ITEMS NUMBER 3 THROUGH 7>

SINCE LAST REPORT GIVE REASONS; POHER LEVEL TQ WHICH RESTRICTED'F ANY (NET MHE) 18+ REASONS FOR RESTRICTIONS r XF ANY l MONTHLY -YTD- CUMUL*TXVE 11, HOURS XN REPORT PERIOD; 745 7296 72169.8

12. NUMBER QF I-IQURS REACTOR HAS CRITICAL 745.0 7296+8 62156.3 13'EACTOR RESERVE SHUTDQHN HOURS ,

8i8 8i8 0' 14, HOURS GENERATOR ON-LINE 745.0 7296 i 8 61140.3

15. UNIT RESERVE SHUTDOWN HOURS. 0.0 8i8 8i8 16'ROSS 1'HERMAL ENERGY GENERATED (MHH) 1941245 19403258 160192331
17. GROSS ELECTRICAL ENERGY GENERATED (MHH) 647950 6509080 53406000
18. NET ELECTRICAL ENERGY GENERATED (MWH) 613982 6176037 50518140
19. UNIT SERVXCE FACTOR 188o8 100 0 84 7 F

28+ UNIT A VAILABILXTYFACTOR 180.0 188i8 84.7

21. CAF'ACXTY FACTOR (USING MDC NET) 98' 100 i 9 84i9 2P. CAI='ACXTY FACTOR <USXNG DER NET) 99i3 102.0 85o8 23i UNXT FORCED OUTAGE RATE 8i8 0.0
24. SHUTDOWNS SCI-IEDULEO OVER NEXT 6 MONTHS :
25. XF SHUT DOWN AT END OF REPORT PERIOD) ESTIMATED DATE OF STARTUP+

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 0-UNIT NAME TL IE 2 DATE NOV 15 Q81 COMPLETED BY BREEN TELEPHONE 4 4 -424 REPORT MONTH T BER I I No. Date Type Duration (Hours)

Reason'ethod of Shutting Reactor'icensee Event Report System Code'omponent Code'ause &, Corrective Action to Down ¹ Prevent Recurrence 911025 0.0 N/A HF XXXXXX Unit 2 downpowered for waterbox cleaning.

F Forced Reason Method Exlubit G - Iastructioas for S Scheduled h - Equipment failure (explain) 1 - Maaual Preparation of Data Entry B - Maintenance or Test 2 - Manual Scram Sheets Liccnsce Event Rcport C - Refueling 3 - hutomatic Scram (LER) File (NUREG4161)

D - Reguhtocy resuicuon 4 - Continued E - Operator Training dc Isccasc Examination 5 - Load Rcductioa F - hdministrative 9 - Other (Explain) Exhibit 1 - Same Souccc G - Operational Error (Expalin)

H - Other (Explain)

8UMMARY OF OPERATING EXPERIENCE DOCKET NO ~ 50-389

,UNIT 8t.' Lucie 2 DATE 8 0 COMPLETED BY J.J. Breen TELEPHONE 407 468-4248 REPORT MONTH OCTOBER 1991 From October 25, 1991, to October 31, 1991, Unit 2 downpowered for waterbox cleaning.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.