ML17227A456: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(7 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 05/31/1992
| issue date = 05/31/1992
| title = Monthly Operating Repts for May 1992 for St Lucie,Units 1 & 2.W/920610 Ltr
| title = Monthly Operating Repts for May 1992 for St Lucie,Units 1 & 2.W/920610 Ltr
| author name = BREEN J J, SAGER D A
| author name = Breen J, Sager D
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 13: Line 13:
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT
| page count = 14
| page count = 14
| revision = 0
}}
}}
=Text=
{{#Wiki_filter:ACCELERATED DISTIUBUTION DEMONSTRATION SYSTEM REGULAY        INFORMATION DZSTRIBUTIOQSYSTEM (RIDE)
ACCESSION NBR:920                                                                          DOCKET
~
FACJ'-L:50-335    St. Lucie Plant, Unit 1, Florida          Power  & Light  Co.      05000335 50-389 St. Lucie Plant, Unit 2, Florida              Power  & Light  Co.      05000389 AUTH . iVAME            AUTHOR AFFILIATION BREENFJ.J.              Florida Power & Light Co.
SAGER,D.A.              Florida Power & Light Co.
RECIP.NAME              RECIPIENT AFFILIATION
==SUBJECT:==
Month            crating repts for      May 1992  for St Lucie,Units      1 &
2      20610    tr.
DISTRIBUTION CODE'E24D COPIES RECEIVED:LTR I                    ENCL    I SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT              COPIES            RECIPIENT          COPIES ID CODE/NAME            LTTR ENCL        ID CODE/NAME      LTTR ENCL PD2-2 LA                      3    3      PD2-2 PD                1    1 NORRIS F J                    1    1 INTERNAL: ACRS                              10    10    AEOD/DOA                1      1 AEOD/DSP/TPAB                1    1      NRR/DLPQ/LPEB10        1      1 NRR/DOEA/OEAB                1    1    REG FIXE~- 01          1      1 RGN2                          1    1 EXTERNAL: EG&G BRYCE,J.H                          1    NRC PDR                1      1 NSIC                                1 NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR                  24  ENCL    24
P.O. Box 12B, Ft. Pierce, FL 34954-0120 June 10, 1992
          %PI L-92-170 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn:    Document Control Desk Washington,          DC  20555 Re:    St. Lucie Units          1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Ik Attached are the May 1992 Operating Status and Summary of Operating Experience Reports for St. Lucie Units 1 and 2.
Should there be any questions on this information, please contact us ~
Ve    truly      yours, D. A.      ger Vice esident St. L ie Plant DAS:JJB:kw cc:  Stewart D. Ebneter, Regional Administrator, Region                          II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant Attachments DAS/PSL 8714-92 9Z06150388 920531 PDR    ADOCK 05000335 R      .                PDR 5OO    Qn  FPL Group company
P, A V
~ PJ  ~ v
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-335 COMPLETED BY  Z.Z. Breen MONTH  MAY  1992 DAY        AVERAGE DAILY POWER LEVEL (MWe<<Net) 5/  1/92                865 5/  2/92                865 5/  3/92                865 5/  4/92                S66 5/  5/92                864 5/  6/92                86S 5/  7/92                S64 5/  8/92                865 5/  9/92                864 5/10/92                  864 5/ll/92                  863 5/12/92                  860 5/13/92                  861 5/14/92                  861 5/15/92                  861 5/16/92                  859 5/17/92                  857 5/18/92                  857 5/19/92                  856 5/28/92                  855 5/Zi/92                  856 5/22/92                  856 5/23/92                  855 5/24/92                  854 5/25/92                  855 5/26/92                  854 5/27/92                  853 5/28/92                  852 S/29/92                  851 5/30/92                  850 5/31/92                  848
OPERATING DATA REPORT DOCKET NO          50  335 COMPLETED BY    Ji  J+ 5REEN TELEPHONE    487/468/4248 OPERATING STATUS 1o UNXT NAME: ST+ LUCXE                  UNIT 1 2+ REPORTING PERIOD i      MAY 1992 3i LICENSED THERMAL POWER (MAT)+                  2708 4+ NAMEPLATE RATING (GROSS MHE)f                    850 5o DESIGN ELECTRICAL RATING <NET MME)i              830 6+ MAXIMUM DEPENDABLE CAPACXTY (GROSS MHE)o          872 7, MAXIMUM DEPENDABLE CAPACITY (NET MHE);          839 8, IF CHANGES OCCUR XN CAPACITY RATXNGS (ITEMS NUMBER 3 THROUGH      7)
SINCE LAST REPORTr GIVE REASONS'OHER LEVEL TO WHICH RESTRXCTEDr XF ANY (NET MHE)
'10> REASONS FOR RESTRICTXONSr XF ANY+
MONTHLY    -YTD- CUMULATIVE il. HOURS XN REPORT PERIOD:                          744      3647        135383.0 12+ NUMBER OF HOURS REACTOR HAS CRITICAL              744+0    3647iO      103756i6 13+ REACTOR RESERVE SHUTDOWN HOURS                      OiO        Oie        205i3 14'OURS    GENERATOR ON-LINE                          744iO    3647.8      102842+9 15+ UNIT RESERVE SHUTDOHN HOURS                        8+0        oie          39+3 16+ GROSS THERMAL ENERGY GENERATED <MHH)          2008981    9810557    265537889 17'ROSS ELECTRXCAL ENERGY GENERATED (MHH)            671980    3301350      87634170 18+ NET ELECTRICAL ENERGY GENERATED (MHH)            638867    3139122      8Z822818 19'NXT    SERVICE FACTOR                              180+0      100+0          76iO 20 UNIT AVAILABILITYFACTOR                            100oO      ieeiO          76 i 0 21 o CAPACITY FACTOR (USING MDC NET)                  ie2 3      ie2            75+6 22+ CAPACITY FACTOR (USING DER NET)                  183o5      103'          74 i 7 Z3 UNIT FORCED OUTAGE RATE                              eiO        Owe          4oO 24'HUTDOHNS SCHEDULED OVER NEXT 6 MONTHS 25'F    SHUT DOHN AT END OF REPORT PERIODr ESTXMATED DATE OF STARTUPf
UNIT SHVTDOWNS AND POWER REDUCTIONS DOCKET NO.                      50-335 UNIT NAME                    ST LU IE DATE                            JUN    i0 COMPLETED BY                  J J BREEN TDLHIHDIIH                    LID4468<248 REPORT MONTH MAY                  1    2 No.        Date Type Duration (Hours)
Reason'ethod of Shutting Reactor'icensee Event Report System Code'omponent    Code'ause                & Corrective Action to Down                                                            Prevent Recurrence The average daily power for Unit 1 was 100% for the month of May, 1992.
F Forcal                      Reason                                        Method                              Exhibit G - Instructions for S Scheduled                    A - Equipment failure (explain)                1 - Manual                          Preparation of Data Entry B - Maintenance or Test                        2 - Manual Scram                    Shccts Liccnsec Event Rcport C - Refueling                                  3 - Automatic Scratn                (LER) File (NUREG41 6 1)
D - Regulatory restriction                    4 - Continual E - Operator Training ds License Examination  5 - Load Reduction F - Administrative                            9 - Other (Explain)                  Exhibit I - Same, Source G - Operational Error (Expalin)
H - Other (Explain)
    %C<>> r I
I 4
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO    50'-335 COMPLETED BY  J.J. Breen TELEPHONE  407  '68-4248 REPORT MONTH  MAY  1992 The average  daily power  of Unit 1 was 1004  for the  month  of May, 1992.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.
AVERAGE DAILY UNIT POlifER LEVEL DOCKET NO. 50-389 DATE COMPLETED BY  Z.Z. Breen MONTH  MAY '1992 DAY        AVERAGE DAILY POWER LEVEL (Mwe-Net) 5/  1/92                -3 5/  2/92                -3 5/  3/92                -3 5/  4/92                -3 5/  5/92                -3 5/  6/92                -3 5/  7/92                -3 5/  8/92                -3 5/  9/92                -3 5/10/92                  -3 5/ii/92                  -3 5/12/92                  -3 5/13/92                  -3 5/14/92                  -3 5/15/92                  -3 5/16/92                  -3 5/17/92                  -3 5/18/92                  -3 5/19/92                  -3 5/20/92                  -3 5/21/92                  -3 5/22/92                  -3 5/23/92                  -3 5/24/92                  -3 5/25/92                  -3 5/26/92                  -3 5/27/92                  -3 5/28/92                  -3 5/29/92                  -3 5/30/92 5/31/92
OPERATXNG DATA REPORT DOCVET NO          50  389 DATE              gag g g gg2 COMPLETED BY    Ji di BREEN TELEPHONE      407/468/4248 OPERATXNG STATUS 4
1+
2+
3+
5+
6+
7i 8,
UNIT NAMEi  STo LUCXE REPORTING PERIOD i
                                    '50 UNIT 2 MAY 1992 LICENSED THERMAL POWER (MHT) i NAMEPLATE RATING (GROSS MHE)
DESIGN ELECTRICAL RATXNG (NET MHE):
MAXIMUM DEPENDABLE CAPACITY (GROSS MME) i MAXXMUM DEPENDABLE CAPACITY (NET MHE) +
                                                      ~700 830 882 839 IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH        7)
SINCE LAST REPORT r GIVE REASONS i POHER LEVEL TQ HHICH RESTRICTED~ IF ANY (NET MHE) 10'EASONS      FOR RESTRICTIONS'F ANY:
MONTHLY    - YTD-  CUMULATIVE 11+ HOURS    IN REPORT PERIOD i                        744      3647          77280oO 12 o NUMBER OF HOURS REACTOR HAS CRITICAL                OiO    2665+6        66285+9 13i  REACTOR RESERVE SHUTDOHN HOURS                      OiO        OiO            0+0 14 i HOURS GENERATOR ON-LINE                              OiO    2665+6        65269i9 15o UNIT RESERVE SHUTDOHN HOURS                          Oie        OiO            0+0 16,  GROSS  THERMAL ENERGY GENERATED (MHH)                  0  7022240    171134846 17>  GROSS  ELECTRICAL ENERGY GENERATED (MHH)              0  2360550      57086370 18'ET    ELECTRXCAL ENERGY GENERATED (MHH)            -2246    2234640      53997487 19'NIT      SERVICE FACTOR                                OiO        73+1          84+5 20'NIT      AVAILABILITYFACTOR                            OiO        73ei          84o5 Zii  CAPACITY FACTOR (USXNG MDC NET)                    0+0        73iO          84 i 6 22+ CAPACITY FACTOR (USING DER NET)                      OiO        73+8          84' 23'NIT      FORCED OUTAGE RATE                            Oie        OiO            4i9 24'HUTDOWNS SCHEDULED OVER NEXT 6 MONTHS UNIT 2 IS CURRENTLY IN A REFUELING OUTAGE 25'F    SHUT DOHN AT END QF REPORT PERIODS    ESTIMATED DATE OF STARTUPi      6/22/92
0
,j i
UNIT SHUTDOWNS AI'K) POWER REDUCTIONS DDCRRT NO.                ~44 UNIT NAME                  ST LU IE UNIT 2 DATE                        AUD.1 '0:
COMPLETED BY                J J BREEN THLHPHONH                  244      468A248 RHPORT MONTH ~MAY                  4    2 No.          Date  Type'uration    Reasons        Method of          Licensee    System        Component            Cause 8c Corrective (Hours)                    Shutting      Event Report    Code4            Code                  Action to Down                &#xb9;                                          Prevent Recurrence Reactor 920421                                                      N/A          RC          FUELEX      Unit 2 taken offline for refueling.
F Forced                          Reason                                        Method                              Exhibit G - Instructions for S Scheduled                      A - Equipment failure (explain)                1 - Manual                          Preparation of Data Entry B - Maintenance or Test                        2 - Manual Scram                    Shccts Licensee Event Rcport C - Refueling                                  3 - Automatic Scram                (LER) File (NUREG4161)
D - Regulatory restriction                    4 - Continual E - Operator Training ds License Examination  5 - Load Reduction F - Administrative                            9 - Other (Explain)                Exhibit 1 - Same Source G - Operational Error (Expalin)
H - Other (Explain)
REPORT MONTH  MAY
==SUMMARY==
OF OPERATING EXPERIENCE 1992 DOCKET NO.
COMPLETED BY TELEPHONE
                                                  ~50-389
                                                            ~
Z.Z. Breen 407 -'68-4248 Unit 2 was in a refueling outage for the month of May, 1992.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.
0 0      I)
                  ~ '7 I
            'V q~ lt}}

Latest revision as of 21:23, 29 October 2019

Monthly Operating Repts for May 1992 for St Lucie,Units 1 & 2.W/920610 Ltr
ML17227A456
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 05/31/1992
From: Breen J, Sager D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-92-170, NUDOCS 9206150388
Download: ML17227A456 (14)


Text

ACCELERATED DISTIUBUTION DEMONSTRATION SYSTEM REGULAY INFORMATION DZSTRIBUTIOQSYSTEM (RIDE)

ACCESSION NBR:920 DOCKET

~

FACJ'-L:50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH . iVAME AUTHOR AFFILIATION BREENFJ.J. Florida Power & Light Co.

SAGER,D.A. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Month crating repts for May 1992 for St Lucie,Units 1 &

2 20610 tr.

DISTRIBUTION CODE'E24D COPIES RECEIVED:LTR I ENCL I SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 3 3 PD2-2 PD 1 1 NORRIS F J 1 1 INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 NRR/DLPQ/LPEB10 1 1 NRR/DOEA/OEAB 1 1 REG FIXE~- 01 1 1 RGN2 1 1 EXTERNAL: EG&G BRYCE,J.H 1 NRC PDR 1 1 NSIC 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24

P.O. Box 12B, Ft. Pierce, FL 34954-0120 June 10, 1992

%PI L-92-170 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Ik Attached are the May 1992 Operating Status and Summary of Operating Experience Reports for St. Lucie Units 1 and 2.

Should there be any questions on this information, please contact us ~

Ve truly yours, D. A. ger Vice esident St. L ie Plant DAS:JJB:kw cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant Attachments DAS/PSL 8714-92 9Z06150388 920531 PDR ADOCK 05000335 R . PDR 5OO Qn FPL Group company

P, A V

~ PJ ~ v

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-335 COMPLETED BY Z.Z. Breen MONTH MAY 1992 DAY AVERAGE DAILY POWER LEVEL (MWe<<Net) 5/ 1/92 865 5/ 2/92 865 5/ 3/92 865 5/ 4/92 S66 5/ 5/92 864 5/ 6/92 86S 5/ 7/92 S64 5/ 8/92 865 5/ 9/92 864 5/10/92 864 5/ll/92 863 5/12/92 860 5/13/92 861 5/14/92 861 5/15/92 861 5/16/92 859 5/17/92 857 5/18/92 857 5/19/92 856 5/28/92 855 5/Zi/92 856 5/22/92 856 5/23/92 855 5/24/92 854 5/25/92 855 5/26/92 854 5/27/92 853 5/28/92 852 S/29/92 851 5/30/92 850 5/31/92 848

OPERATING DATA REPORT DOCKET NO 50 335 COMPLETED BY Ji J+ 5REEN TELEPHONE 487/468/4248 OPERATING STATUS 1o UNXT NAME: ST+ LUCXE UNIT 1 2+ REPORTING PERIOD i MAY 1992 3i LICENSED THERMAL POWER (MAT)+ 2708 4+ NAMEPLATE RATING (GROSS MHE)f 850 5o DESIGN ELECTRICAL RATING <NET MME)i 830 6+ MAXIMUM DEPENDABLE CAPACXTY (GROSS MHE)o 872 7, MAXIMUM DEPENDABLE CAPACITY (NET MHE); 839 8, IF CHANGES OCCUR XN CAPACITY RATXNGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORTr GIVE REASONS'OHER LEVEL TO WHICH RESTRXCTEDr XF ANY (NET MHE)

'10> REASONS FOR RESTRICTXONSr XF ANY+

MONTHLY -YTD- CUMULATIVE il. HOURS XN REPORT PERIOD: 744 3647 135383.0 12+ NUMBER OF HOURS REACTOR HAS CRITICAL 744+0 3647iO 103756i6 13+ REACTOR RESERVE SHUTDOWN HOURS OiO Oie 205i3 14'OURS GENERATOR ON-LINE 744iO 3647.8 102842+9 15+ UNIT RESERVE SHUTDOHN HOURS 8+0 oie 39+3 16+ GROSS THERMAL ENERGY GENERATED <MHH) 2008981 9810557 265537889 17'ROSS ELECTRXCAL ENERGY GENERATED (MHH) 671980 3301350 87634170 18+ NET ELECTRICAL ENERGY GENERATED (MHH) 638867 3139122 8Z822818 19'NXT SERVICE FACTOR 180+0 100+0 76iO 20 UNIT AVAILABILITYFACTOR 100oO ieeiO 76 i 0 21 o CAPACITY FACTOR (USING MDC NET) ie2 3 ie2 75+6 22+ CAPACITY FACTOR (USING DER NET) 183o5 103' 74 i 7 Z3 UNIT FORCED OUTAGE RATE eiO Owe 4oO 24'HUTDOHNS SCHEDULED OVER NEXT 6 MONTHS 25'F SHUT DOHN AT END OF REPORT PERIODr ESTXMATED DATE OF STARTUPf

UNIT SHVTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-335 UNIT NAME ST LU IE DATE JUN i0 COMPLETED BY J J BREEN TDLHIHDIIH LID4468<248 REPORT MONTH MAY 1 2 No. Date Type Duration (Hours)

Reason'ethod of Shutting Reactor'icensee Event Report System Code'omponent Code'ause & Corrective Action to Down Prevent Recurrence The average daily power for Unit 1 was 100% for the month of May, 1992.

F Forcal Reason Method Exhibit G - Instructions for S Scheduled A - Equipment failure (explain) 1 - Manual Preparation of Data Entry B - Maintenance or Test 2 - Manual Scram Shccts Liccnsec Event Rcport C - Refueling 3 - Automatic Scratn (LER) File (NUREG41 6 1)

D - Regulatory restriction 4 - Continual E - Operator Training ds License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain) Exhibit I - Same, Source G - Operational Error (Expalin)

H - Other (Explain)

%C<>> r I

I 4

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO 50'-335 COMPLETED BY J.J. Breen TELEPHONE 407 '68-4248 REPORT MONTH MAY 1992 The average daily power of Unit 1 was 1004 for the month of May, 1992.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.

AVERAGE DAILY UNIT POlifER LEVEL DOCKET NO. 50-389 DATE COMPLETED BY Z.Z. Breen MONTH MAY '1992 DAY AVERAGE DAILY POWER LEVEL (Mwe-Net) 5/ 1/92 -3 5/ 2/92 -3 5/ 3/92 -3 5/ 4/92 -3 5/ 5/92 -3 5/ 6/92 -3 5/ 7/92 -3 5/ 8/92 -3 5/ 9/92 -3 5/10/92 -3 5/ii/92 -3 5/12/92 -3 5/13/92 -3 5/14/92 -3 5/15/92 -3 5/16/92 -3 5/17/92 -3 5/18/92 -3 5/19/92 -3 5/20/92 -3 5/21/92 -3 5/22/92 -3 5/23/92 -3 5/24/92 -3 5/25/92 -3 5/26/92 -3 5/27/92 -3 5/28/92 -3 5/29/92 -3 5/30/92 5/31/92

OPERATXNG DATA REPORT DOCVET NO 50 389 DATE gag g g gg2 COMPLETED BY Ji di BREEN TELEPHONE 407/468/4248 OPERATXNG STATUS 4

1+

2+

3+

5+

6+

7i 8,

UNIT NAMEi STo LUCXE REPORTING PERIOD i

'50 UNIT 2 MAY 1992 LICENSED THERMAL POWER (MHT) i NAMEPLATE RATING (GROSS MHE)

DESIGN ELECTRICAL RATXNG (NET MHE):

MAXIMUM DEPENDABLE CAPACITY (GROSS MME) i MAXXMUM DEPENDABLE CAPACITY (NET MHE) +

~700 830 882 839 IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT r GIVE REASONS i POHER LEVEL TQ HHICH RESTRICTED~ IF ANY (NET MHE) 10'EASONS FOR RESTRICTIONS'F ANY:

MONTHLY - YTD- CUMULATIVE 11+ HOURS IN REPORT PERIOD i 744 3647 77280oO 12 o NUMBER OF HOURS REACTOR HAS CRITICAL OiO 2665+6 66285+9 13i REACTOR RESERVE SHUTDOHN HOURS OiO OiO 0+0 14 i HOURS GENERATOR ON-LINE OiO 2665+6 65269i9 15o UNIT RESERVE SHUTDOHN HOURS Oie OiO 0+0 16, GROSS THERMAL ENERGY GENERATED (MHH) 0 7022240 171134846 17> GROSS ELECTRICAL ENERGY GENERATED (MHH) 0 2360550 57086370 18'ET ELECTRXCAL ENERGY GENERATED (MHH) -2246 2234640 53997487 19'NIT SERVICE FACTOR OiO 73+1 84+5 20'NIT AVAILABILITYFACTOR OiO 73ei 84o5 Zii CAPACITY FACTOR (USXNG MDC NET) 0+0 73iO 84 i 6 22+ CAPACITY FACTOR (USING DER NET) OiO 73+8 84' 23'NIT FORCED OUTAGE RATE Oie OiO 4i9 24'HUTDOWNS SCHEDULED OVER NEXT 6 MONTHS UNIT 2 IS CURRENTLY IN A REFUELING OUTAGE 25'F SHUT DOHN AT END QF REPORT PERIODS ESTIMATED DATE OF STARTUPi 6/22/92

0

,j i

UNIT SHUTDOWNS AI'K) POWER REDUCTIONS DDCRRT NO. ~44 UNIT NAME ST LU IE UNIT 2 DATE AUD.1 '0:

COMPLETED BY J J BREEN THLHPHONH 244 468A248 RHPORT MONTH ~MAY 4 2 No. Date Type'uration Reasons Method of Licensee System Component Cause 8c Corrective (Hours) Shutting Event Report Code4 Code Action to Down ¹ Prevent Recurrence Reactor 920421 N/A RC FUELEX Unit 2 taken offline for refueling.

F Forced Reason Method Exhibit G - Instructions for S Scheduled A - Equipment failure (explain) 1 - Manual Preparation of Data Entry B - Maintenance or Test 2 - Manual Scram Shccts Licensee Event Rcport C - Refueling 3 - Automatic Scram (LER) File (NUREG4161)

D - Regulatory restriction 4 - Continual E - Operator Training ds License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain) Exhibit 1 - Same Source G - Operational Error (Expalin)

H - Other (Explain)

REPORT MONTH MAY

SUMMARY

OF OPERATING EXPERIENCE 1992 DOCKET NO.

COMPLETED BY TELEPHONE

~50-389

~

Z.Z. Breen 407 -'68-4248 Unit 2 was in a refueling outage for the month of May, 1992.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.

0 0 I)

~ '7 I

'V q~ lt