ML17228A535: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ACCELERATED DISTRIBUTION DEMONSTPA.TION SYSTEM A REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9404150251 DOC.DATE:~~K NOTARIZED:
{{#Wiki_filter:ACCELERATED DISTRIBUTION DEMONSTPA.TION SYSTEM A
NO FACIL:50-335 St.Lucie Plant, Unit 1, Florida Power&Light Co.50-389 St.Lucie Plant, Unit 2, Florida Power&Light Co.AUTH.NAME AUTHOR AFFILIATION WHITE,C.D.
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
Florida Power&Light Co.SAGER,D.A.
ACCESSION NBR:9404150251             DOC.DATE: ~~K FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power NOTARIZED: NO
Florida Power&Light, Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000335 05000389
                                                                    & Light Co.
DOCKET 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power             & Light Co.       05000389 AUTH. NAME           AUTHOR AFFILIATION WHITE,C.D.           Florida     Power & Light Co.
SAGER,D.A.           Florida     Power & Light, Co.
RECIP.NAME           RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Mont o crating repts for Mar 1994 for St Lucie Units 1&2.W 94041 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE!Monthly Operating Report (per Tech Specs)NOTES RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: ACRS AEOD/DS P/TPAB NRR/DRIL/RPEB RGN2 EXTERNAL: EG&G BRYCE,J.H NSIC COPIES LTTR ENCL 1 1 10 10 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME NORRIS,J AEOD/DOA NRR/JURORS/OEAB E~FILE 01 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 D D R D NOTE TO ALL"RIDS" RECIPIENTS:
Mont       o crating repts for       Mar 1994 for St Lucie Units     1 2.W 94041     ltr.                                                       &
D D PLEASE HELP US TO REDUCE EVASIVE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED'TTR 21 ENCL 21 T A P.O.Box 128, Ft.Pierce, FL 34954-0128 April ll, 1994 L-94-084 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St.Lucie Units 1 and 2 Docket Nos.50-335 and 50-389 Monthl 0 eratin Re ort Attached are the March, 1994, Operating Status and Summary of Operating Experience Reports for St.Lucie Units 1 and 2.Should there be any questions on this information, please contact us~Very truly yours, D.A.er Vice P ident St.Lu'e Plant DAS/CDW/kw cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St.Lucie Plant Attachments DAS/PSL 81097-94-.~@00'~9404i50251'4033i PDR ADOCf(05000335 PDR an FPL Group company)Eg 1, lL N g AVERAGE DAILY UNIT POWER LEVEL DOCKET NO UNIT'ATE COMPLETED BY TELEPHONE 50-335 St.Lucie g1 04/11/94 C.D.White (407)468-4248 MONTH MARCH 1994 DAY 3/01/94 3/02/94 3/03/94 3/04/94 3/05/94 3/06/94 3/07/94 3/08/94 3/09/94 3/10/94 3/11/94 3/12/94 3/13/94 3/14/94 3/15/94 3/16/94 3/17/94 3/18/94 3/19/94 3/20/94 3/21/94 3/22/94 3/23/94 3/24/94 3/25/94 3/26/94 3/27/94 3/28/94 3/29/94 3/30/94 3/31/94 AVERAGE DAILY POWER LEVEL (MWe-Net)834 833 833 834 836 832 786 816 849 849 847 848 848 847 846 845 840 838 832 828 780 805 836 835 832 826 762 378-33-33-33
DISTRIBUTION CODE: IE24D           COPIES RECEIVED:LTR       ENCL       SIZE:
TITLE! Monthly Operating Report (per Tech Specs)
NOTES RECIPIENT               COPIES          RECIPIENT          COPIES              D ID   CODE/NAME           LTTR ENCL      ID CODE/NAME        LTTR ENCL PD2-2 PD                     1    1    NORRIS,J                1    1 D
INTERNAL: ACRS                         10    10    AEOD/DOA                1    1 AEOD/ DS P/TPAB             1    1    NRR/JURORS/OEAB        1    1 NRR/DRIL/RPEB               1    1      E~FILE        01      1    1 RGN2                         1    1 EXTERNAL: EG&G BRYCE,J.H               1     1     NRC PDR NSIC                        1     1 R
D D
D NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE EVASIVE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES       REQUIRED'TTR         21   ENCL   21


OPERATING DATA REPORT OPERATING STATUS DOCKET NO 50-335 DATE 4/11/94 COMPLETED BY C.D.WHITE TELEPHONE 407/468/4248 1.UNIT NAME: ST.LUCZE UNIT 1 2.REPORTING PERIOD: MARCH 1994 3.LICENSED THERMAL POWER (MWT): 2700 4.NAMEPLATE RATZNG (GROSS MWE): 850 5.DESIGN ELECTRICAL RATING (NET MWE): 830 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 872 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS:~9.POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)10.REASONS'OR RESTRICTIONS, IF ANY: MONTHLY-YTD-"CUMULATIVE 11.HOURS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LINE~15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENERATED (MWH)17.GROSS ELECTRICAL ENERGY GENERATED (MWH)18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FACTOR 21.CAPACITY FACTOR (USING MDC NET)22.CAPACITY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS UNIT 1 CYCLE 13 REFUELING OUTAGE SCHEDULED 744 666.2 0.0 666.2 0.0 1767558 576910 544286 89.5 89.5 87.2 88.1 10.5 2160 2062.2 0.0 2055.3 0.0 5487758 1801660 1705537 95.2 95.2 94.1 95.1 4.8 FOR OCTOBER 1994.151440.0 117592.2 205.3 116410.2 39.3 301253059 99414950 93963899 76.9 76.9 76.3 75.6 4.0 25.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
T A


UNIT SH&K)OWNS AND POWER REDUCTIONS DOCKET NO.: UNIT NAME: DATE: COMPLETED BY: TELEPHONE:
P.O. Box 128, Ft. Pierce, FL 34954-0128 April ll, 1994                    L-94-084 10 CFR 50.36 U. S.      Nuclear Regulatory Commission Attn:      Document Control Desk Washington, DC 20555 Re:      St. Lucie Units      1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Attached are the March, 1994, Operating Status                          and Summary        of Operating Experience Reports for St. Lucie Units                      1 and      2.
50-335 ST LUCIE UNIT 1 04/11/94 C.D.WHITE (407)468-4248 REPORT MONTH MARCH 1994 No.Date Type Duration (Hours)Reason~Method of Shutting Down Reactor Licensee Event Report System Code'omponent Codes Cause&Corrective Action to Prevent Recurrence 4 03/28/94 77.7 LER 94-03 HA GENERA Unit 1 tripped due to the loss of the main generator field, caused by personal error.F Forced S Scheduled Reason A-Equipment failure (explain)B-Maintenance or Test C-Rcfucling D-Regulatory restriction E-Operator Training d'c License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Sheets Licensee Event Report (LER)File (NUREG4161)
Should there be any questions on          this information, please contact us ~
Exhibit 1-Same Source
Very    truly yours, D. A.            er Vice P          ident St. Lu 'e Plant DAS/CDW/kw cc:      Stewart D. Ebneter, Regional Administrator, Region Senior Resident Inspector, USNRC, St. Lucie Plant II, USNRC Attachments DAS/PSL 81097-94
    -. ~@00'~
9404i50251'4033i PDR      ADOCf(      05000335 PDR
                                                                                    )Eg an FPL Group company
 
1, lL N
g
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO      50-335 UNIT'ATE St. Lucie g1 04/11/94 COMPLETED BY    C. D. White TELEPHONE      (407) 468-4248 MONTH MARCH    1994 DAY      AVERAGE DAILY POWER LEVEL (MWe-Net) 3/01/94                834 3/02/94                833 3/03/94                833 3/04/94                834 3/05/94                836 3/06/94                832 3/07/94                786 3/08/94                816 3/09/94                849 3/10/94                849 3/11/94                847 3/12/94                848 3/13/94                848 3/14/94                847 3/15/94                846 3/16/94                845 3/17/94                840 3/18/94                838 3/19/94                832 3/20/94                828 3/21/94                780 3/22/94                805 3/23/94                836 3/24/94                835 3/25/94                832 3/26/94                826 3/27/94                762 3/28/94                378 3/29/94                -33 3/30/94                -33 3/31/94                -33
 
OPERATING DATA REPORT DOCKET NO         50 - 335 DATE                4/11/94 COMPLETED BY    C. D. WHITE TELEPHONE      407/468/4248 OPERATING STATUS
: 1. UNIT NAME: ST. LUCZE        UNIT 1
: 2. REPORTING PERIOD:      MARCH 1994
: 3. LICENSED THERMAL POWER (MWT):                  2700
: 4. NAMEPLATE RATZNG (GROSS MWE):                    850
: 5. DESIGN ELECTRICAL RATING (NET MWE):              830
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):        872
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):          839
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS  NUMBER 3 THROUGH 7)
SINCE LAST REPORT,  GIVE REASONS:  ~
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
: 10. REASONS 'OR RESTRICTIONS, IF ANY:
MONTHLY  - YTD- "CUMULATIVE
: 11. HOURS IN REPORT PERIOD:                        744      2160        151440.0
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL            666.2    2062.2      117592.2
: 13. REACTOR RESERVE SHUTDOWN HOURS                    0.0        0.0        205.3
: 14. HOURS GENERATOR ON-LINE                        666.2    2055.3      116410.2
~
: 15. UNIT RESERVE SHUTDOWN HOURS                      0.0        0.0          39.3
: 16. GROSS THERMAL ENERGY GENERATED (MWH)        1767558    5487758    301253059
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)        576910  1801660      99414950
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)          544286  1705537      93963899
: 19. UNIT SERVICE FACTOR                              89.5      95.2          76.9
: 20. UNIT AVAILABILITYFACTOR                          89.5      95.2          76.9
: 21. CAPACITY FACTOR (USING MDC NET)                  87.2      94.1          76.3
: 22. CAPACITY FACTOR (USING DER NET)                  88.1      95.1          75.6
: 23. UNIT FORCED OUTAGE RATE                          10.5        4.8          4.0
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS UNIT 1 CYCLE 13 REFUELING OUTAGE SCHEDULED FOR OCTOBER  1994.
: 25. IF  SHUT DOWN AT END OF REPORT PERIOD,  ESTIMATED DATE OF STARTUP:
 
UNIT SH&K)OWNS AND POWER REDUCTIONS DOCKET NO.:                  50-335 UNIT NAME:                    ST LUCIE UNIT 1 DATE:                        04/11/94 COMPLETED BY:                C. D. WHITE TELEPHONE:                    (407) 468-4248 REPORT MONTH MARCH 1994 No.         Date   Type Duration   Reason~       Method of           Licensee     System Code'omponent                         Cause   & Corrective (Hours)                    Shutting        Event Report                    Codes                        Action to Down                                                                    Prevent Recurrence Reactor 4       03/28/94       77.7                                       LER 94-03       HA           GENERA   Unit 1 tripped due to the loss of the main generator field, caused by personal error.
F Forced                         Reason                                          Method                                    Exhibit G - Instructions for S Scheduled                     A - Equipment failure (explain)                 1 - Manual                                Preparation of Data Entry B - Maintenance or Test                         2 - Manual Scram                          Sheets Licensee Event Report C - Rcfucling                                   3 - Automatic Scram                      (LER) File (NUREG4161)
D - Regulatory restriction                     4 - Continued E - Operator Training d'c License Examination   5 - Load Reduction F - Administrative                             9 - Other (Explain)                       Exhibit 1 - Same Source G - Operational Error (Explain)
H - Other (Explain)


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO~: UNIT DATE: COMPLETED BY: TELEPHONE:
OF OPERATING EXPERIENCE DOCKET NO ~ : 50-335 UNIT          St. Lucie gi DATE:          04/11/94 COMPLETED BY:  C. D. White TELEPHONE:    (407) 468-4248 REPORT MONTH   MARCH 1994 Unit 1 operated at or above 804 from March 1, 1994 through March 27, 1994. On March 28, 1994 the Unit tripped due to a maintenance error. Details of the Unit trip may be found in LER 94-03. Unit 1 remained off-line through the end of the month.
50-335 St.Lucie gi 04/11/94 C.D.White (407)468-4248 REPORT MONTH MARCH 1994 Unit 1 operated at or above 804 from March 1, 1994 27, 1994.On March 28, 1994 the Unit tripped due to error.Details of the Unit trip may be found in LER remained off-line through the end of the month.through March a maintenance 94-03.Unit 1 In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO>>UNIT: DATE COMPLETED BY TELEPHONE!
 
50-389 St.Lucie g2 04/11/94 C.D.White (407)468-4248 DAY MONTH MARCH 1994 AVERAGE DAILY POWER LEVEL (MWe-Net)3/01/94.3/02/94 3/03/94 3/04/94 3/05/94 3/06/94'3/07/94 3/08/94 3/09/94 3/10/94 3/11/94 3/12/94'3/13/94 3/14/94 3/15/94 3/16/94 3/17/94 3/18/94 3/19/94 3/20/94 3/21/94 3/22/94 3/23/94 3/24/94 3/25/94 3/26/94 3/27/94 3/28/94 3/29/94 3/30/94 3/31/94-3-3-3-3-3-3<<3-3-3-3-3-3-3-3-3-3-4-3-4-4-3-3-3-3-3-4-4-4-4-7-11 OPERATING DATA REPORT OPERATING STATUS DOCKET NO 50-389 DATE 4/11/94 COMPLETED BY C.D.WHITE TELEPHONE 407/468/4248 1.UNIT NAME: ST.LUCIE UNIT 2 2.REPORTING PERIOD: MARCH 1994 3.LICENSED THERMAL POWER (MWT):~2700 4.NAMEPLATE RATING (GROSS MWE): 850 5.DESIGN ELECTRICAL RATING (NET MWE): 830 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 882 7.MAXIMUM DEPENDABLE CAPACZTY (NET MWE): 839 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)10 REASONS FOR RESTRICTIONS g IF ANY MONTHLY-YTD-CUMULATIVE 11.HOURS ZN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14: HOURS GENERATOR ON-LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENERATED (MWH)17.GROSS ELECTRICAL ENERGY GENERATED (MWH)18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FACTOR 21.CAPACITY FACTOR (USING MDC NET)22.CAPACITY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS UNIT 2 WAS SHUT DOWN FOR CYCLE 8 REFUELING.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO>>     50-389 UNIT:          St. Lucie g2 DATE          04/11/94 COMPLETED BY  C. D. White TELEPHONE!    (407) 468-4248 MONTH MARCH   1994 DAY      AVERAGE DAILY POWER LEVEL (MWe-Net) 3/01/94.             -3 3/02/94               -3 3/03/94               -3 3/04/94               -3 3/05/94               -3 3/06/94               -3
744 0.0 0.0 0.0 0.0 0 0-2727 0.0 0.0 0.0 0.0 0.0 2160 1056.1 0.0 1056.1 0.0 2808227 910690 856231 48.9 48.9 47.2 47.8 0.0 93337.0 78219.7 0.0 76951.4 0.0 199769152 66420240 62757402 82.4 82.4 81.1 81.5 7'25.ZF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
  '3/07/94               <<3 3/08/94               -3 3/09/94               -3 3/10/94               -3 3/11/94               -3 3/12/94               -3
UNIT SHVI'DOWNS A2'6)POWER REDUCTIONS DOCKET NO.: UNIT NAME: DATE: COMPLETED BY: TELEPHONE:
  '3/13/94               -3 3/14/94               -3 3/15/94               -3 3/16/94               -3 3/17/94               -4 3/18/94               -3 3/19/94               -4 3/20/94               -4 3/21/94               -3 3/22/94               -3 3/23/94               -3 3/24/94               -3 3/25/94               -3 3/26/94               -4 3/27/94               -4 3/28/94               -4 3/29/94               -4 3/30/94               -7 3/31/94             -11
50-389 ST LUCIE UNIT 2 04/11/94 C.D.WHITE (407)468-4248 REPORT MONTH MARCH 1 4 No.Date Type Duration (Hours)Reason Method of Shutting Down Reactor Licensee Event Report System Code4 Component Codes Cause&Corrective Action to Prevent Recurrence Unit 2 was off-line for Cycle 8 refueling.
 
F Forced S Scheduled Reason A-Equipment failure (explain)B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training dt, License Examination F-Adininistrativc G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for preparation of Data Entry Shccts Liccnsce Event Report (LER)File (NUREG4161)
OPERATING DATA REPORT DOCKET NO           50 - 389 DATE                 4/11/94 COMPLETED BY   C. D. WHITE TELEPHONE     407/468/4248 OPERATING STATUS
Exhl>it 1-Same Source
: 1. UNIT NAME: ST. LUCIE         UNIT 2
: 2. REPORTING PERIOD:       MARCH 1994
: 3. LICENSED THERMAL POWER   (MWT):               ~ 2700
: 4. NAMEPLATE RATING   (GROSS MWE):                   850
: 5. DESIGN ELECTRICAL RATING (NET MWE):                 830
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):           882
: 7. MAXIMUM DEPENDABLE CAPACZTY (NET MWE):             839
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS     NUMBER 3 THROUGH 7)
SINCE LAST REPORT,   GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED,   IF ANY (NET MWE) 10   REASONS FOR RESTRICTIONS g IF ANY MONTHLY   -YTD-   CUMULATIVE
: 11. HOURS ZN REPORT PERIOD:                            744      2160          93337.0
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL                 0.0    1056. 1      78219. 7
: 13. REACTOR RESERVE SHUTDOWN HOURS                       0.0        0.0          0.0 14: HOURS GENERATOR ON-LINE                             0.0    1056.1        76951.4
: 15. UNIT RESERVE SHUTDOWN HOURS                         0.0        0.0          0.0
: 16. GROSS THERMAL ENERGY GENERATED (MWH)                   0  2808227    199769152
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)               0    910690      66420240
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)             -2727    856231      62757402
: 19. UNIT SERVICE FACTOR                                 0.0      48.9          82.4
: 20. UNIT AVAILABILITYFACTOR                              0.0      48.9          82.4
: 21. CAPACITY FACTOR (USING MDC NET)                     0.0      47.2          81.1
: 22. CAPACITY FACTOR (USING DER NET)                     0.0      47.8          81.5
: 23. UNIT FORCED OUTAGE RATE                             0.0        0.0          7 '
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS UNIT 2 WAS SHUT DOWN FOR CYCLE 8 REFUELING.
: 25. ZF SHUT DOWN AT END OF REPORT PERIOD,   ESTIMATED DATE OF STARTUP:
 
UNIT SHVI'DOWNS A2'6) POWER REDUCTIONS DOCKET NO.:                   50-389 UNIT NAME:                   ST LUCIE UNIT 2 DATE:                        04/11/94 COMPLETED BY: C. D. WHITE TELEPHONE:                    (407) 468-4248 REPORT MONTH MARCH                       1   4 No.         Date Type Duration   Reason         Method of           Licensee     System       Component               Cause   & Corrective (Hours)                    Shutting        Event Report    Code4            Codes                      Action to Down                                                                  Prevent Recurrence Reactor Unit 2 was off-line for Cycle     8 refueling.
F Forced                       Reason                                          Method                                  Exhibit G - Instructions for S Scheduled                   A - Equipment failure (explain)                 1 - Manual                              preparation of Data Entry B - Maintenance or Test                         2 - Manual Scram                        Shccts Liccnsce Event Report C - Refueling                                   3 - Automatic Scram                      (LER) File (NUREG4161)
D - Regulatory restriction                     4 - Continued E - Operator Training dt, License Examination   5 - Load Reduction F - Adininistrativc                             9 - Other (Explain)                     Exhl>it 1 - Same Source G - Operational Error (Explain)
H - Other (Explain)


==SUMMARY==
==SUMMARY==
OP OPERATING EXPERIENCE DOCKET NO+UNIT DATE COMPLETED BYo TELEPHONE:
OP OPERATING EXPERIENCE DOCKET NO+     50-389 UNIT          St. Lucie g2 DATE            04/11/94 COMPLETED BYo  C. D. White TELEPHONE:      (407) 468-4248 REPORT MONTH   MARCH   1994 Unit 2 was shut down for its Cycle 8 refueling outage, during the month   of March, 1994.
50-389 St.Lucie g2 04/11/94 C.D.White (407)468-4248 REPORT MONTH MARCH 1994 Unit 2 was shut down for its Cycle 8 refueling outage, during the month of March, 1994.In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.}}
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.}}

Latest revision as of 21:11, 29 October 2019

Monthly Operating Repts for Mar 1994 for St Lucie Units 1 & 2.W/940411 Ltr
ML17228A535
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 03/31/1994
From: Sager D, Charlotte White
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-94-084, L-94-84, NUDOCS 9404150251
Download: ML17228A535 (14)


Text

ACCELERATED DISTRIBUTION DEMONSTPA.TION SYSTEM A

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9404150251 DOC.DATE: ~~K FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power NOTARIZED: NO

& Light Co.

DOCKET 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION WHITE,C.D. Florida Power & Light Co.

SAGER,D.A. Florida Power & Light, Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Mont o crating repts for Mar 1994 for St Lucie Units 1 2.W 94041 ltr. &

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE! Monthly Operating Report (per Tech Specs)

NOTES RECIPIENT COPIES RECIPIENT COPIES D ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 PD 1 1 NORRIS,J 1 1 D

INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/ DS P/TPAB 1 1 NRR/JURORS/OEAB 1 1 NRR/DRIL/RPEB 1 1 E~FILE 01 1 1 RGN2 1 1 EXTERNAL: EG&G BRYCE,J.H 1 1 NRC PDR NSIC 1 1 R

D D

D NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE EVASIVE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED'TTR 21 ENCL 21

T A

P.O. Box 128, Ft. Pierce, FL 34954-0128 April ll, 1994 L-94-084 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Attached are the March, 1994, Operating Status and Summary of Operating Experience Reports for St. Lucie Units 1 and 2.

Should there be any questions on this information, please contact us ~

Very truly yours, D. A. er Vice P ident St. Lu 'e Plant DAS/CDW/kw cc: Stewart D. Ebneter, Regional Administrator, Region Senior Resident Inspector, USNRC, St. Lucie Plant II, USNRC Attachments DAS/PSL 81097-94

-. ~@00'~

9404i50251'4033i PDR ADOCf( 05000335 PDR

)Eg an FPL Group company

1, lL N

g

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-335 UNIT'ATE St. Lucie g1 04/11/94 COMPLETED BY C. D. White TELEPHONE (407) 468-4248 MONTH MARCH 1994 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 3/01/94 834 3/02/94 833 3/03/94 833 3/04/94 834 3/05/94 836 3/06/94 832 3/07/94 786 3/08/94 816 3/09/94 849 3/10/94 849 3/11/94 847 3/12/94 848 3/13/94 848 3/14/94 847 3/15/94 846 3/16/94 845 3/17/94 840 3/18/94 838 3/19/94 832 3/20/94 828 3/21/94 780 3/22/94 805 3/23/94 836 3/24/94 835 3/25/94 832 3/26/94 826 3/27/94 762 3/28/94 378 3/29/94 -33 3/30/94 -33 3/31/94 -33

OPERATING DATA REPORT DOCKET NO 50 - 335 DATE 4/11/94 COMPLETED BY C. D. WHITE TELEPHONE 407/468/4248 OPERATING STATUS

1. UNIT NAME: ST. LUCZE UNIT 1
2. REPORTING PERIOD: MARCH 1994
3. LICENSED THERMAL POWER (MWT): 2700
4. NAMEPLATE RATZNG (GROSS MWE): 850
5. DESIGN ELECTRICAL RATING (NET MWE): 830
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 872
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS: ~

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS 'OR RESTRICTIONS, IF ANY:

MONTHLY - YTD- "CUMULATIVE

11. HOURS IN REPORT PERIOD: 744 2160 151440.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 666.2 2062.2 117592.2
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 205.3
14. HOURS GENERATOR ON-LINE 666.2 2055.3 116410.2

~

15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 39.3
16. GROSS THERMAL ENERGY GENERATED (MWH) 1767558 5487758 301253059
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 576910 1801660 99414950
18. NET ELECTRICAL ENERGY GENERATED (MWH) 544286 1705537 93963899
19. UNIT SERVICE FACTOR 89.5 95.2 76.9
20. UNIT AVAILABILITYFACTOR 89.5 95.2 76.9
21. CAPACITY FACTOR (USING MDC NET) 87.2 94.1 76.3
22. CAPACITY FACTOR (USING DER NET) 88.1 95.1 75.6
23. UNIT FORCED OUTAGE RATE 10.5 4.8 4.0
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS UNIT 1 CYCLE 13 REFUELING OUTAGE SCHEDULED FOR OCTOBER 1994.
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

UNIT SH&K)OWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT NAME: ST LUCIE UNIT 1 DATE: 04/11/94 COMPLETED BY: C. D. WHITE TELEPHONE: (407) 468-4248 REPORT MONTH MARCH 1994 No. Date Type Duration Reason~ Method of Licensee System Code'omponent Cause & Corrective (Hours) Shutting Event Report Codes Action to Down Prevent Recurrence Reactor 4 03/28/94 77.7 LER 94-03 HA GENERA Unit 1 tripped due to the loss of the main generator field, caused by personal error.

F Forced Reason Method Exhibit G - Instructions for S Scheduled A - Equipment failure (explain) 1 - Manual Preparation of Data Entry B - Maintenance or Test 2 - Manual Scram Sheets Licensee Event Report C - Rcfucling 3 - Automatic Scram (LER) File (NUREG4161)

D - Regulatory restriction 4 - Continued E - Operator Training d'c License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain) Exhibit 1 - Same Source G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO ~ : 50-335 UNIT St. Lucie gi DATE: 04/11/94 COMPLETED BY: C. D. White TELEPHONE: (407) 468-4248 REPORT MONTH MARCH 1994 Unit 1 operated at or above 804 from March 1, 1994 through March 27, 1994. On March 28, 1994 the Unit tripped due to a maintenance error. Details of the Unit trip may be found in LER 94-03. Unit 1 remained off-line through the end of the month.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO>> 50-389 UNIT: St. Lucie g2 DATE 04/11/94 COMPLETED BY C. D. White TELEPHONE! (407) 468-4248 MONTH MARCH 1994 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 3/01/94. -3 3/02/94 -3 3/03/94 -3 3/04/94 -3 3/05/94 -3 3/06/94 -3

'3/07/94 <<3 3/08/94 -3 3/09/94 -3 3/10/94 -3 3/11/94 -3 3/12/94 -3

'3/13/94 -3 3/14/94 -3 3/15/94 -3 3/16/94 -3 3/17/94 -4 3/18/94 -3 3/19/94 -4 3/20/94 -4 3/21/94 -3 3/22/94 -3 3/23/94 -3 3/24/94 -3 3/25/94 -3 3/26/94 -4 3/27/94 -4 3/28/94 -4 3/29/94 -4 3/30/94 -7 3/31/94 -11

OPERATING DATA REPORT DOCKET NO 50 - 389 DATE 4/11/94 COMPLETED BY C. D. WHITE TELEPHONE 407/468/4248 OPERATING STATUS

1. UNIT NAME: ST. LUCIE UNIT 2
2. REPORTING PERIOD: MARCH 1994
3. LICENSED THERMAL POWER (MWT): ~ 2700
4. NAMEPLATE RATING (GROSS MWE): 850
5. DESIGN ELECTRICAL RATING (NET MWE): 830
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 882
7. MAXIMUM DEPENDABLE CAPACZTY (NET MWE): 839
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) 10 REASONS FOR RESTRICTIONS g IF ANY MONTHLY -YTD- CUMULATIVE
11. HOURS ZN REPORT PERIOD: 744 2160 93337.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 1056. 1 78219. 7
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 14: HOURS GENERATOR ON-LINE 0.0 1056.1 76951.4
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 0 2808227 199769152
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 910690 66420240
18. NET ELECTRICAL ENERGY GENERATED (MWH) -2727 856231 62757402
19. UNIT SERVICE FACTOR 0.0 48.9 82.4
20. UNIT AVAILABILITYFACTOR 0.0 48.9 82.4
21. CAPACITY FACTOR (USING MDC NET) 0.0 47.2 81.1
22. CAPACITY FACTOR (USING DER NET) 0.0 47.8 81.5
23. UNIT FORCED OUTAGE RATE 0.0 0.0 7 '
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS UNIT 2 WAS SHUT DOWN FOR CYCLE 8 REFUELING.
25. ZF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

UNIT SHVI'DOWNS A2'6) POWER REDUCTIONS DOCKET NO.: 50-389 UNIT NAME: ST LUCIE UNIT 2 DATE: 04/11/94 COMPLETED BY: C. D. WHITE TELEPHONE: (407) 468-4248 REPORT MONTH MARCH 1 4 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective (Hours) Shutting Event Report Code4 Codes Action to Down Prevent Recurrence Reactor Unit 2 was off-line for Cycle 8 refueling.

F Forced Reason Method Exhibit G - Instructions for S Scheduled A - Equipment failure (explain) 1 - Manual preparation of Data Entry B - Maintenance or Test 2 - Manual Scram Shccts Liccnsce Event Report C - Refueling 3 - Automatic Scram (LER) File (NUREG4161)

D - Regulatory restriction 4 - Continued E - Operator Training dt, License Examination 5 - Load Reduction F - Adininistrativc 9 - Other (Explain) Exhl>it 1 - Same Source G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

OP OPERATING EXPERIENCE DOCKET NO+ 50-389 UNIT St. Lucie g2 DATE 04/11/94 COMPLETED BYo C. D. White TELEPHONE: (407) 468-4248 REPORT MONTH MARCH 1994 Unit 2 was shut down for its Cycle 8 refueling outage, during the month of March, 1994.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.