ML17228B526: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:1 7.REGULATO INFORMATION, DISTRIBUTION SYSTEM (RIDS)4 ACCESSION NBR:9606210072 DOC.DATE: 96/05/31 NOTARIZED:
{{#Wiki_filter:7.
NO'ACIL:S0-335 St.Lucie Plant, Unit 1, Florida Power a Light Co.50-389, St.Lucie Plant, Unit 2, Florida Power 6 Light Co.AUTH.NAME" AUTHOR AFFILIATION ROGERS,J.A.
4 REGULATO 1
Florida Power a Light Co.STALL,J.A.
INFORMATION,DISTRIBUTION SYSTEM (RIDS)
: Florida Power S Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000335 05000389
ACCESSION NBR:9606210072           DOC.DATE: 96/05/31     NOTARIZED: NO                     DOCKET St. Lucie Plant, Unit 1, Florida Power a Light Co.         'ACIL:S0-335 05000335 50-389, St. Lucie Plant, Unit 2, Florida Power 6 Light Co.                           05000389 AUTH. NAME     "     AUTHOR AFFILIATION ROGERS,J.A.           Florida Power a Light Co.
STALL,J.A.       :   Florida Power S Light Co.
RECIP.NAME           RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating repts for May 1996 for St Lucie Units 1&2.W/960612 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: RECIPIENT ID CODE/NAME PD2-3 PD COPIES RECIPIENT LTTR ENCL ID CODE/NAME 1 1 WIENS i L.COPIES LTTR ENCL 1 1 INTERNAL: RS RGN2 1 1 1 1 1 1 AEOD/SPD/RRAB NRR/DRPM/PECB 1 1 1 1 EXTERNAL: LITCO BRYCEiJ H NRC PDR 1 1 1 1 NOAC 1 1 NOTE TO ALL"RIDS" RECIP1ENTS:
Monthly operating repts for       May 1996   for St Lucie Units             1 &
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EX'15-2083)
2.W/960612   ltr.
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10 Florida Power 5 Light Company, P.O.Box128, Fort Pierce, FL34854-0128 3Ull 12 1596 L-96-145 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St.Lucie Units 1 and 2 Docket Nos.50-335 and 50-389 Pursuant to Technical Specification 6.9.1.6, attached are the May 1996, Operating Data, Summary of Operating Experience, Average Daily Unit Power Level, and Unit Shutdowns and Power Reductions Reports for St.Lucie Units 1 and 2.Should there be any questions on this information, please contact US~Very truly yours, J.A.Stall, Vice President St.Lucie Plant JAS/SL Attachments cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St.Lucie Plant 96062i0072 96053i PDR ADGCK 05000335I R PDR I, an FPL Group company r
DISTRIBUTION CODE: IE24D       COPIES RECEIVED:LTR         ENCL       SIZE:
E OPERATING DATA REPORT OPERATING STATUS DOCKET NO 50-335 DATE 6/7/96 FPL LICENSING GROUP-JUNO TELEPHONE 407/694/4432 UNIT NAME: ST.LUCIE UNIT 1 REPORTING PERIOD: MAY 1996 LICENSED THERMAL POWER (MWT): 2700 NAMEPLATE RATZNG (GROSS MWE): 850 DESIGN ELECTRICAL RATING (NET MWE): 830 MAXIMUM DEPEMDABLE CAPACITY (GROSS MWE): 872 MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839 IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT i G I VE REASONS 9 POWER LEVEL TO WHI CH RESTRI CTED i I F ANY (NET MWE)1 0 REASONS FOR RESTRICTIONS i IF ANY MONTHLY-YTD-CUMULATIVE 11.HOURS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENERATED (MWH)17.GROSS ELECTRICAL ENERGY GENERATED (MWH)18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAZLABILITY FACTOR 21.CAPACITY FACTOR (USING MDC NET)22.CAPACITY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 744 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3647 2822.5 0.0 2797.0 0.0 7402769 2422760 2293262 76.7 76.7 74.9 75.7 2.2 170447.0 132862.4 0.0 131418.6 0.0 340879558 112411780 106238535 77.1 77.1 74.3 75.1 5.0 24.SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS: 25.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 7/19/96.
TITLE: Monthly Operating Report (per Tech Specs)
DOCKET NO.: UNIT: DATE: COMPLETED BY: TELEPHONE:
NOTES:
50-335 St.Lucie¹1 June 7, 1996 J.A.ROGERS (407)467-7296 REPORT MONTH Unit 1 remained offline for the entire month for Cycle 14 refueling and maintenance.
RECIPIENT          COPIES            RECIPIENT           COPIES ID CODE/NAME         LTTR ENCL         ID CODE/NAME       LTTR ENCL PD2-3 PD                  1   1     WIENS i L.               1             1 INTERNAL:     RS                     1   1     AEOD/SPD/RRAB           1              1 1  1      NRR/DRPM/PECB           1             1 RGN2                      1   1 EXTERNAL: LITCO BRYCEiJ H             1   1     NOAC                    1             1 NRC PDR                    1   1 NOTE TO ALL "RIDS" RECIP1ENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EX'15-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR           10   ENCL   10
 
Florida Power 5 Light Company, P.O. Box128, Fort Pierce, FL34854-0128 L-96-145 3Ull  12 1596                      10 CFR 50.36 U. S.     Nuclear Regulatory Commission Attn:     Document Control Desk Washington, DC 20555 Re:     St. Lucie Units       1 and 2 Docket Nos. 50-335 and 50-389 Pursuant to Technical Specification 6.9.1.6, attached are the May 1996, Operating Data, Summary of Operating Experience, Average Daily Unit Power Level, and Unit Shutdowns and Power Reductions Reports for St. Lucie Units 1 and 2.
Should there be any questions on                 this information, please contact US ~
Very     truly     yours, J. A. Stall, Vice President St. Lucie Plant JAS/SL Attachments cc:     Stewart D. Ebneter, Regional Administrator, Region                                 II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant 96062i0072 96053i PDR     ADGCK     05000335I R                     PDR   I, an FPL Group company
 
r E
OPERATING DATA REPORT DOCKET NO           50 - 335 DATE                 6/ 7/96 FPL LICENSING GROUP   - JUNO TELEPHONE     407/694/4432 OPERATING STATUS UNIT NAME: ST. LUCIE     UNIT 1 REPORTING PERIOD:     MAY 1996 LICENSED THERMAL POWER (MWT):                 2700 NAMEPLATE RATZNG (GROSS MWE):                 850 DESIGN ELECTRICAL RATING (NET MWE):           830 MAXIMUM DEPEMDABLE CAPACITY (GROSS MWE):       872 MAXIMUM DEPENDABLE CAPACITY (NET MWE):         839 IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST I
REPORT i G VE REASONS 9   POWER LEVEL TO WHICH RESTRI CTED i IF ANY (NET MWE )
10  REASONS FOR RESTRICTIONS i IF ANY MONTHLY   -YTD-       CUMULATIVE
: 11. HOURS IN REPORT PERIOD:                        744      3647        170447.0
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL           0.0      2822.5      132862.4
: 13. REACTOR RESERVE SHUTDOWN HOURS                 0.0      0.0        0.0
: 14. HOURS GENERATOR ON LINE                         0.0      2797.0      131418.6
: 15. UNIT RESERVE SHUTDOWN HOURS                     0.0      0.0        0.0
: 16. GROSS THERMAL ENERGY GENERATED (MWH)           0.0      7402769    340879558
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)         0.0      2422760    112411780
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)           0.0      2293262    106238535
: 19. UNIT SERVICE FACTOR                             0.0      76.7        77. 1
: 20. UNIT AVAZLABILITYFACTOR                        0.0      76.7        77.1
: 21. CAPACITY FACTOR (USING MDC NET)                 0.0      74.9        74.3
: 22. CAPACITY FACTOR (USING DER NET)                 0.0      75.7        75.1
: 23. UNIT FORCED OUTAGE RATE                         0.0       2.2         5.0
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 7/19/96.
 
DOCKET NO.:     50-335 UNIT:            St. Lucie ¹1 DATE:            June 7, 1996 COMPLETED BY:  J.A.ROGERS TELEPHONE:      (407) 467-7296 REPORT MONTH Unit 1 remained offline for the entire month for Cycle 14 refueling and maintenance.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: UNIT: DATE COMPLETED BY: TELEPHONE:
50-335 St.Lucie¹1 dune 7, 1996 aT.A.ROGERS (407)467-7296 DAY MONTH AVERAGE DAILY POWER LEVEL (MWe-Net)05/01/96 05/02/96 05/03/96 05/04/96 05/05/96 05/06/96 05/07/96 05/08/96 05/09/96 05/10/96 05/11/96 05/12/96 05/13/96 05/14/96 05/15/96 05/16/96 05/17/96 05/18/96 05/19/96 05/20/96 05/21/96 05/22/96 05/23/96 05/24/96 05/25/96 05/26/96 05/27/96 05/28/96 05/29/96 05/30/96 05/31/96


UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: UNIT NAME: DATE: COMPLETED BY: TELEPHONE:
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.:     50-335 UNIT:             St. Lucie ¹1 DATE             dune 7, 1996 COMPLETED BY:     aT.A.ROGERS TELEPHONE:         (407) 467-7296 MONTH DAY          AVERAGE DAILY POWER LEVEL (MWe-Net) 05/01/96 05/02/96 05/03/96 05/04/96 05/05/96 05/06/96 05/07/96 05/08/96 05/09/96 05/10/96 05/11/96 05/12/96 05/13/96 05/14/96 05/15/96 05/16/96 05/17/96 05/18/96 05/19/96 05/20/96 05/21/96 05/22/96 05/23/96 05/24/96 05/25/96 05/26/96 05/27/96 05/28/96 05/29/96 05/30/96 05/31/96
50-335 ST LUCIE UNIT I June 7, 1996 J.A.ROGERS (407)467-7296 REPORT MONTH hhy~K No.Date Type Duration (Hours)Reason'ethod of Shutting Down Reactor'icensee Event Report¹System Code'omponent Code'ause&Corrective Action to Prevent Recurrence 4/29/96 744 N/A RC VESSEL Unit l offline for Cycle 14 refueling and maintenance.
 
F Forced S Scheduled Reason A-Equipment fai!ure (explain)8-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training g: License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method I-Manual 2-htanual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for preparation of Data Entry Sheets Licensee Event Report (LER)File (NUREG416l) 5 Exhibit I-Same Source 0915sr FPL K.r OPERATING DATA REPORT OPERATING STATUS DOCKET NO 50" 389 DATE 6/7/96 FPL LICENSING GROUP-JUNO TELEPHONE 407/694/4432 1.UNIT NAME: ST.LUCIE UNIT 2 2.REPORTING PERIOD: MAY 1996 3.LICENSED THERMAL POWER (MWT): 2700 4.NAMEPLATE RATING (GROSS MWE): 850 5.DESIGN ELECTRICAL RATING (NET MWE): 830 6.MAXIMUM DEPEMDABLE CAPACITY (GROSS MWE): 882 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)10.REASONS FOR RESTRICTZONS, IF ANY: MONTHLY-YTD-CUMULATIVE 11.HOURS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENERATED (MWH)17.GROSS ELECTRICAL ENERGY GENERATED (MWH)18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FACTOR 21.CAPACITY FACTOR (USING MDC NET)22.CAPACITY FACTOR'(USING DER NET)23.UNIT FORCED OUTAGE RATE 744 744 0.0 744 0.0 1984529 655450 621508 100 100 99.6 100 0.0 3647 3603.9 0.0 3487.4 0.0 9123215 3025530 2861813 95.6 95.6 93.5 94.5 1.7 112344.0 94474.5 0.0 92926.1 0.0 241585937 80086200 75652481 82.7 82.7 80.3 81.1 6.5 24.SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS: 25.ZF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:  
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:                      50-335 UNIT NAME:                      ST LUCIE UNIT I DATE:                            June 7, 1996 COMPLETED BY:                    J.A.ROGERS TELEPHONE:                      (407) 467-7296 REPORT MONTH hhy             ~K No.         Date   Type Duration (Hours)
Reason'ethod of Shutting Reactor'icensee Event Report System Code'omponent   Code'ause                       & Corrective Action to Down                  ¹                                                Prevent Recurrence 4/29/96       744                                             N/A         RC           VESSEL Unit l offline for Cycle   14 refueling and maintenance.
F Forced                         Reason                                          Method                                    Exhibit G - Instructions for S Scheduled                       A - Equipment fai!ure (explain)                 I - Manual                                preparation of Data Entry 8 - Maintenance or Test                         2 - htanual Scram                        Sheets Licensee Event Report C - Refueling                                   3 - Automatic Scram                      (LER) File (NUREG416l)
D - Regulatory restriction                       4 - Continued E - Operator Training g: License Examination     5 - Load Reduction                    5 F - Administrative                               9 - Other (Explain)                       Exhibit I - Same Source G - Operational Error (Explain)
H - Other (Explain) 0915sr FPL
 
K .r OPERATING DATA REPORT DOCKET NO         50 " 389 DATE               6/ 7/96 FPL LICENSING GROUP - JUNO TELEPHONE     407/694/4432 OPERATING STATUS
: 1. UNIT NAME: ST. LUCIE   UNIT 2
: 2. REPORTING PERIOD:   MAY 1996
: 3. LICENSED THERMAL POWER (MWT):               2700
: 4. NAMEPLATE RATING (GROSS MWE):                 850
: 5. DESIGN ELECTRICAL RATING (NET MWE):           830
: 6. MAXIMUM DEPEMDABLE CAPACITY (GROSS MWE):     882
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):       839
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
: 10. REASONS FOR RESTRICTZONS, IF ANY:
MONTHLY   -YTD-     CUMULATIVE
: 11. HOURS IN REPORT PERIOD:                        744        3647      112344. 0
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL           744        3603.9    94474.5
: 13. REACTOR RESERVE SHUTDOWN HOURS                 0.0        0.0        0.0
: 14. HOURS GENERATOR ON LINE                       744        3487.4    92926.1
: 15. UNIT RESERVE SHUTDOWN HOURS                   0.0        0.0        0.0
: 16. GROSS THERMAL ENERGY GENERATED (MWH)           1984529    9123215    241585937
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)       655450    3025530    80086200
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)         621508    2861813    75652481
: 19. UNIT SERVICE FACTOR                           100        95.6      82.7
: 20. UNIT AVAILABILITYFACTOR                        100        95.6      82.7
: 21. CAPACITY FACTOR (USING MDC NET)               99.6      93.5      80.3
: 22. CAPACITY FACTOR '(USING DER NET)               100        94. 5      81.1
: 23. UNIT FORCED OUTAGE RATE                       0.0       1.7       6.5
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:
: 25. ZF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
 
DOCKET NO.:    50-389 UNXT:          St. Lucie ¹2 DATE:          June 7, 1996 COMPLETED BY:  J.A.ROGERS TELEPHONE:      (407) 467-7296 REPORT MONTH Unit 2 operated at essentially full power for the entire month.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.
 
  , AVERAGE DAILY UNIT POWER LEVEL DOCKET  NO.:    50-389 UNIT:          St. Lucie N2 DATE:          June 7, 1996 COMPLETED BY:  J.A ROGERS TELEPHONE:      (407) 467-7296 MONTH DAY            AVERAGE DAILY POWER LEVEL (Mwe-Net) 05/01/96                    847 05/02/96                    848 05/03/96                    848 O5/O4/96                    849 05/05/96                    850 05/06/96                    847 05/07/96                    850 05/08/96                    850 05/09/96                    849 05/10/96                    842 05/11/96                    845 05/12/96                    850 05/13/96                    848 05/14/96                    847 05/15/96                    843 05/16/96                    846 05/17/96                    843 05/18/96                    843 05/19/96                    847 05/20/96                    847 05/21/96                    846 05/22/96                    848 05/23/96                    843 05/24/96                    795 05/25/96                    720 05/26/96                    727 05/27/96                    846 05/28/96                    842 05/29/96                    848 05/30/96                    846 05/31/96                    798
 
      ~ ~
tg I
    )


DOCKET NO.: UNXT: DATE: COMPLETED BY: TELEPHONE:
                                                                                                                                                                      ~ J UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:                     50-389               ~       ~
50-389 St.Lucie¹2 June 7, 1996 J.A.ROGERS (407)467-7296 REPORT MONTH Unit 2 operated at essentially full power for the entire month.In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.
UNIT NAME:                       ST LUCIE UNIT 2 DATE:                           June 7, 1996 COMPLETED BY:                   J.A.ROGERS TELEPHONE:                       (407) 467-7296 REPORT MONTH hfay             ~5 No.         Date Type Duration (Hours)
, AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: UNIT: DATE: COMPLETED BY: TELEPHONE:
Reasons       Method of Shutting Reactor'icensee Down Event Report System Code'omponent   Code'ause                   & Corrective Action to Prevent Recurrence Unit 2 operated at full power for the entire month.
50-389 St.Lucie N2 June 7, 1996 J.A ROGERS (407)467-7296 DAY 05/01/96 05/02/96 05/03/96 O5/O4/96 05/05/96 05/06/96 05/07/96 05/08/96 05/09/96 05/10/96 05/11/96 05/12/96 05/13/96 05/14/96 05/15/96 05/16/96 05/17/96 05/18/96 05/19/96 05/20/96 05/21/96 05/22/96 05/23/96 05/24/96 05/25/96 05/26/96 05/27/96 05/28/96 05/29/96 05/30/96 05/31/96 MONTH AVERAGE DAILY POWER LEVEL (Mwe-Net)847 848 848 849 850 847 850 850 849 842 845 850 848 847 843 846 843 843 847 847 846 848 843 795 720 727 846 842 848 846 798
I                             2                                                  3                                    4 F Forced                       Reason                                            Method                                Exhibit G - Instructions for S Scheduled                   A - Equipment failure (explain)                   I - Manual                            Preparation of Data  Entry I) - Maintenance or Test                           2 - Manual Scram                      Sheets Licensee Event Report C - Refueling                                     3 - Automatic Scram                    (LER) File (NUREG41161)
~~tg I)
D - Regulatory restriction                         4 - Continued E - Operator Training g: License Examination       5 - Load Reduction F - Admmistrative                                 9 - Other (Explain)                   Exhibit I - Same Source G - Operational Error (Explain)
~J UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389~~UNIT NAME: ST LUCIE UNIT 2 DATE: June 7, 1996 COMPLETED BY: J.A.ROGERS TELEPHONE:
H - Other (Explain) tslssl FPt.}}
(407)467-7296 REPORT MONTH hfay~5 No.Date Type Duration (Hours)Reasons Method of Shutting Down Reactor'icensee Event Report System Code'omponent Code'ause&Corrective Action to Prevent Recurrence Unit 2 operated at full power for the entire month.I F Forced S Scheduled 2 Reason A-Equipment failure (explain)I)-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training g: License Examination F-Admmistrative G-Operational Error (Explain)H-Other (Explain)3 Method I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)4 Exhibit G-Instructions for Preparation of Data Entry Sheets Licensee Event Report (LER)File (NUREG41161)
Exhibit I-Same Source tslssl FPt.}}

Latest revision as of 22:00, 29 October 2019

Monthly Operating Repts for May 1996 for St Lucie Units 1 & 2.W/960612 Ltr
ML17228B526
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 05/31/1996
From: Rogers J, Stall J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-96-145, NUDOCS 9606210072
Download: ML17228B526 (15)


Text

7.

4 REGULATO 1

INFORMATION,DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9606210072 DOC.DATE: 96/05/31 NOTARIZED: NO DOCKET St. Lucie Plant, Unit 1, Florida Power a Light Co. 'ACIL:S0-335 05000335 50-389, St. Lucie Plant, Unit 2, Florida Power 6 Light Co. 05000389 AUTH. NAME " AUTHOR AFFILIATION ROGERS,J.A. Florida Power a Light Co.

STALL,J.A.  : Florida Power S Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for May 1996 for St Lucie Units 1 &

2.W/960612 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 PD 1 1 WIENS i L. 1 1 INTERNAL: RS 1 1 AEOD/SPD/RRAB 1 1 1 1 NRR/DRPM/PECB 1 1 RGN2 1 1 EXTERNAL: LITCO BRYCEiJ H 1 1 NOAC 1 1 NRC PDR 1 1 NOTE TO ALL "RIDS" RECIP1ENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EX'15-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

Florida Power 5 Light Company, P.O. Box128, Fort Pierce, FL34854-0128 L-96-145 3Ull 12 1596 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Pursuant to Technical Specification 6.9.1.6, attached are the May 1996, Operating Data, Summary of Operating Experience, Average Daily Unit Power Level, and Unit Shutdowns and Power Reductions Reports for St. Lucie Units 1 and 2.

Should there be any questions on this information, please contact US ~

Very truly yours, J. A. Stall, Vice President St. Lucie Plant JAS/SL Attachments cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant 96062i0072 96053i PDR ADGCK 05000335I R PDR I, an FPL Group company

r E

OPERATING DATA REPORT DOCKET NO 50 - 335 DATE 6/ 7/96 FPL LICENSING GROUP - JUNO TELEPHONE 407/694/4432 OPERATING STATUS UNIT NAME: ST. LUCIE UNIT 1 REPORTING PERIOD: MAY 1996 LICENSED THERMAL POWER (MWT): 2700 NAMEPLATE RATZNG (GROSS MWE): 850 DESIGN ELECTRICAL RATING (NET MWE): 830 MAXIMUM DEPEMDABLE CAPACITY (GROSS MWE): 872 MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839 IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST I

REPORT i G VE REASONS 9 POWER LEVEL TO WHICH RESTRI CTED i IF ANY (NET MWE )

10 REASONS FOR RESTRICTIONS i IF ANY MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 744 3647 170447.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 2822.5 132862.4
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON LINE 0.0 2797.0 131418.6
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 0.0 7402769 340879558
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0.0 2422760 112411780
18. NET ELECTRICAL ENERGY GENERATED (MWH) 0.0 2293262 106238535
19. UNIT SERVICE FACTOR 0.0 76.7 77. 1
20. UNIT AVAZLABILITYFACTOR 0.0 76.7 77.1
21. CAPACITY FACTOR (USING MDC NET) 0.0 74.9 74.3
22. CAPACITY FACTOR (USING DER NET) 0.0 75.7 75.1
23. UNIT FORCED OUTAGE RATE 0.0 2.2 5.0
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 7/19/96.

DOCKET NO.: 50-335 UNIT: St. Lucie ¹1 DATE: June 7, 1996 COMPLETED BY: J.A.ROGERS TELEPHONE: (407) 467-7296 REPORT MONTH Unit 1 remained offline for the entire month for Cycle 14 refueling and maintenance.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-335 UNIT: St. Lucie ¹1 DATE dune 7, 1996 COMPLETED BY: aT.A.ROGERS TELEPHONE: (407) 467-7296 MONTH DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 05/01/96 05/02/96 05/03/96 05/04/96 05/05/96 05/06/96 05/07/96 05/08/96 05/09/96 05/10/96 05/11/96 05/12/96 05/13/96 05/14/96 05/15/96 05/16/96 05/17/96 05/18/96 05/19/96 05/20/96 05/21/96 05/22/96 05/23/96 05/24/96 05/25/96 05/26/96 05/27/96 05/28/96 05/29/96 05/30/96 05/31/96

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT NAME: ST LUCIE UNIT I DATE: June 7, 1996 COMPLETED BY: J.A.ROGERS TELEPHONE: (407) 467-7296 REPORT MONTH hhy ~K No. Date Type Duration (Hours)

Reason'ethod of Shutting Reactor'icensee Event Report System Code'omponent Code'ause & Corrective Action to Down ¹ Prevent Recurrence 4/29/96 744 N/A RC VESSEL Unit l offline for Cycle 14 refueling and maintenance.

F Forced Reason Method Exhibit G - Instructions for S Scheduled A - Equipment fai!ure (explain) I - Manual preparation of Data Entry 8 - Maintenance or Test 2 - htanual Scram Sheets Licensee Event Report C - Refueling 3 - Automatic Scram (LER) File (NUREG416l)

D - Regulatory restriction 4 - Continued E - Operator Training g: License Examination 5 - Load Reduction 5 F - Administrative 9 - Other (Explain) Exhibit I - Same Source G - Operational Error (Explain)

H - Other (Explain) 0915sr FPL

K .r OPERATING DATA REPORT DOCKET NO 50 " 389 DATE 6/ 7/96 FPL LICENSING GROUP - JUNO TELEPHONE 407/694/4432 OPERATING STATUS

1. UNIT NAME: ST. LUCIE UNIT 2
2. REPORTING PERIOD: MAY 1996
3. LICENSED THERMAL POWER (MWT): 2700
4. NAMEPLATE RATING (GROSS MWE): 850
5. DESIGN ELECTRICAL RATING (NET MWE): 830
6. MAXIMUM DEPEMDABLE CAPACITY (GROSS MWE): 882
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTZONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 744 3647 112344. 0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744 3603.9 94474.5
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON LINE 744 3487.4 92926.1
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1984529 9123215 241585937
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 655450 3025530 80086200
18. NET ELECTRICAL ENERGY GENERATED (MWH) 621508 2861813 75652481
19. UNIT SERVICE FACTOR 100 95.6 82.7
20. UNIT AVAILABILITYFACTOR 100 95.6 82.7
21. CAPACITY FACTOR (USING MDC NET) 99.6 93.5 80.3
22. CAPACITY FACTOR '(USING DER NET) 100 94. 5 81.1
23. UNIT FORCED OUTAGE RATE 0.0 1.7 6.5
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:
25. ZF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

DOCKET NO.: 50-389 UNXT: St. Lucie ¹2 DATE: June 7, 1996 COMPLETED BY: J.A.ROGERS TELEPHONE: (407) 467-7296 REPORT MONTH Unit 2 operated at essentially full power for the entire month.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

, AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-389 UNIT: St. Lucie N2 DATE: June 7, 1996 COMPLETED BY: J.A ROGERS TELEPHONE: (407) 467-7296 MONTH DAY AVERAGE DAILY POWER LEVEL (Mwe-Net) 05/01/96 847 05/02/96 848 05/03/96 848 O5/O4/96 849 05/05/96 850 05/06/96 847 05/07/96 850 05/08/96 850 05/09/96 849 05/10/96 842 05/11/96 845 05/12/96 850 05/13/96 848 05/14/96 847 05/15/96 843 05/16/96 846 05/17/96 843 05/18/96 843 05/19/96 847 05/20/96 847 05/21/96 846 05/22/96 848 05/23/96 843 05/24/96 795 05/25/96 720 05/26/96 727 05/27/96 846 05/28/96 842 05/29/96 848 05/30/96 846 05/31/96 798

~ ~

tg I

)

~ J UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 ~ ~

UNIT NAME: ST LUCIE UNIT 2 DATE: June 7, 1996 COMPLETED BY: J.A.ROGERS TELEPHONE: (407) 467-7296 REPORT MONTH hfay ~5 No. Date Type Duration (Hours)

Reasons Method of Shutting Reactor'icensee Down Event Report System Code'omponent Code'ause & Corrective Action to Prevent Recurrence Unit 2 operated at full power for the entire month.

I 2 3 4 F Forced Reason Method Exhibit G - Instructions for S Scheduled A - Equipment failure (explain) I - Manual Preparation of Data Entry I) - Maintenance or Test 2 - Manual Scram Sheets Licensee Event Report C - Refueling 3 - Automatic Scram (LER) File (NUREG41161)

D - Regulatory restriction 4 - Continued E - Operator Training g: License Examination 5 - Load Reduction F - Admmistrative 9 - Other (Explain) Exhibit I - Same Source G - Operational Error (Explain)

H - Other (Explain) tslssl FPt.