ML17229B096: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 03/31/1999
| issue date = 03/31/1999
| title = Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr
| title = Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr
| author name = ROGERS J A, STALL J A
| author name = Rogers J, Stall J
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORY1.REGULA~YINFORMATION D1STRIBUTI
{{#Wiki_filter:CATEGORY 1                .
.SYSTEM(RIDS)ACCESSI'ON NBR:9904160174 DOC.DATE:
REGULA~     Y INFORMATION D1STRIBUTI           .SYSTEM (RIDS)
99/03/31NOTARIZED:
ACCESSI'ON NBR:9904160174           DOC.DATE: 99/03/31 NOTARIZED: NO                        DOCKET  I FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co.                           05000335 50-,389'St. Lucie Plant, Unit 2, Florida Power S Light Co.                         05000389 AUTH.NAME            AUTHOR AFFILIATION ROGERS,J.A.          Florida    Power Ec Light Co.
NOFACIL:50-335 St.LuciePlant,Unit1,FloridaPower&LightCo.50-,389'St.
STALL,J.A.            Florida    Power Ec Light Co.
LuciePlant,Unit2,FloridaPowerSLightCo.AUTH.NAMEAUTHORAFFILIATION ROGERS,J.A.
RECIP.NAME           RECIPIENT AFFILIATION
FloridaPowerEcLightCo.STALL,J.A.
FloridaPowerEcLightCo.RECIP.NAME RECIPIENT AFFILIATION DOCKETI0500033505000389


==SUBJECT:==
==SUBJECT:==
Monthlyoperating reptsforMar1999forStLucie,Units 18c2.With990408ltr.DISTRIBUTION CODE:IE24DCOPIESRECEIVED:LTR ENCLSIZE:TITLE:MonthlyOperating Report(perTechSpecs)NOTES:ERECIPIENT IDCODE/NAME PD2-3PDCOPIESLTTRENCL1'RECIPIENT IDCODE/NAME GLEAVES,W COPIESLTTRENCL11INTERNAL:
Monthly operating repts        for  Mar 1999    for St Lucie,Units       1 8c 2.With 990408 ltr.
ACRSCENTER011111AEOD/SPD/RRAB OC/DBA/PAD 1111EXTERNAL:
DISTRIBUTION CODE: IE24D          COPIES RECEIVED:LTR           ENCL        SIZE:
LMITCOMARSHALLNRCPDR1111NOAC11DNNOTETOALL"RIDS"RECIPIENTS:
TITLE: Monthly Operating Report (per Tech Specs)
PLEASEHELPUSTOREDUCEWASTE.TOHAVEYOURNAMEORORGANIZATION REMOVEDFROMDISTRIBUTION LISTSORREDUCETHENUMBEROFCOPIESRECEIVEDBYYOUORYOURORGANIZATION, CONTACTTHEDOCUMENTCONTROLDESK(DCD)ONEXTENSION 415-2083TOTALNUMBEROFCOPIESREQUIRED:
E NOTES:
LTTR10ENCL10 FloridaPowersLightCompany,6351 S.OceanDrive,JensenBeach,FL34957Aped.l8,1999L-99-08810CFR50.3610CFR50.4U.S.NuclearRegulatory Commission Attn:DocumentControlDeskWashington, DC20555Re:St.LucieUnits1and2'ocketNos.50-335and50-389Monthl0eratinReortPursuanttoTechnical Specification 6.9.1.6andtheguidanceofGenericLetter97-02,attachedaretheMarch1999Operating DataReports,SummaryofOperating Experience Reports,andUnitShutdowns andPowerReductions forSt.LucieUnits1and2.Pleasecontactusshouldtherebeanyquestions regarding thisinformation.
RECIPIENT            COPIES              RECIPIENT            COPIES ID  CODE/NAME         LTTR' ENCL        ID  CODE/NAME         LTTR ENCL PD2-3 PD                  1              GLEAVES,W                 1      1 INTERNAL: ACRS                        1      1      AEOD/SPD/RRAB             1      1 CENTER    01              1      OC/DBA/PAD               1      1 1
Verytrulyyours,J.A.StallVicePresident St.LuciePlantJAS/sptAttachments cc:RegionalAdministrator, USNRC,RegionIISeniorResidentInspector, USNRC,St.LuciePlant9904160174 97033iPDRADOCK05000335PDRanFPLGroupcompany DOCKETNO50-335UNITNAMEST.LUCIEUNIT1DATE04/05/99COMPLETED BYJ.A.ROGERSTELEPHONE 561/467/7296 REPORTING PERIOD:MARCH19991.DesignElectrical Rating(Mwe-Net) 8302.MaximumDependable Capacity(Mwe-Net) 839MONTH-YTD-CUMULATIVE 3.NumberofHoursReactorCritical4.NumberofHoursGenerator OnLine74474421602160154129.5152493.75.UnitReserveShutdownHours6.NetElectrical Energy(MWH)0.06367170.00.01848192123768730 SUMMARYOFOPERATING EXPERIENCE DOCKETNO.:UNIT:DATE:COMPLETED BY:TELEPHONE:
EXTERNAL: LMITCO MARSHALL            1      1      NOAC                      1      1 NRC PDR                  1      1 D
50-335St.Lucie81Apr.5,1999J.A.ROGERS (561)467-7296REPORTMONTHMarch1999Unit1operatedatessentially fullpowerfortheentiremonthofMarch.Inaccordance withtherequirements ofTechnical Specification 6.9.1.6,therewerenochallenges tothepoweroperatedreliefvalvesorthesafetyvalvesduringthereportperiod.
N NOTE TO ALL "RIDS" RECIPIENTS:
UNITSHUTDOWNS ANDPOWERREDUCTIONS DOCKETNO.:UNIT:DATE:COMPLETED BY'ELEPHONE:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR              10    ENCL    10
50-335St.LucieN1Apr.5,1999J.A.ROGERS (561)467-7296REPORTMONTHMarch1999NumberDateTYPe1Duration(Hours)Reason2MethodofShuttingDownReactor3Cause&Corrective ActiontoPreventRecurrence Unitloperatedatessentially fullpoorerfortheentiremonthofMarch.FForcedSScheduled ReasonA-Equipment FailuretExplain)
 
B-Maintenance orTestC-Refueling D-Regulatory Restriction E-OperatorTrainingaLicenseExamination F-Administrative G-Operational Error(Explain)
Florida Powers Light Company,6351 S. Ocean Drive, Jensen Beach, FL 34957 Aped.l 8, 1999 L-99-088 10 CFR 50.36 10 CFR 50.4 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re:     St. Lucie Units 1 and 2
H-Other(Explain) 3Method1-Manual2-ManualScram3-Automatic Scram4-Continued 5-LoadReduction 9-Other<Explain) 091587IPL DOCKETNO50-389UNITNAMEST.LUCIEUNIT2DATE04/05/99COMPLETED BYJ.A.ROGERSTELEPHONE 561/467/7296 REPORTING PERIOD:MARCH19991.DesignElectrical Rating(Mwe-Net) 8302.MaximumDependable Capacity(Mwe-Net) 839MONTH-YTD-CUMULATIVE 3.NumberofHoursReactorCritical4.NumberofHoursGenerator OnLine5.UnitReserveShutdownHours6.NetElectrical Energy(MWH)7447440.0637047216021600.01844583117459.7115810.70.094850427 SUMMARYOFOPERATING EXPERIENCE DOCKETNO.:UNIT:DATE:COMPLETED BY:TELEPHONE:
        'ocket    Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Pursuant to Technical Specification 6.9.1.6 and the guidance of Generic Letter 97-02, attached are the March 1999 Operating Data Reports, Summary of Operating Experience Reports, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.
50-389St.Lucie&#xb9;2Apr.5,1999S.A.ROGERS (561)467-7296REPORTMONTHMarch1999Unit2operatedatessentially fullpowerfortheentiremonthofMarch.Inaccordance withtherequirements ofTechnical Specification 6.9.1.6,therewerenochallenges tothepoweroperatedreliefvalvesorthesafetyvalvesduringthereportperiod.
Please contact us should there be any questions regarding this information.
UNITSHUTDOWNS ANDPOWERREDUCTIONS DOCKETNO.:UNIT:DATE:COMPLETED BY:TELEPHONE 50-389St.LuciaN2Apr.5,1999J.A.ROGERS (561)467-7296REPORTMONTHMarch1999NumberDateType1Duration(Hours)Reason2MethodofShuttingDownReactor3CausetxCorrective ActiontoPreventRecurrence Unit2operatedatessentially fullpoemfortheentiremonthofMarch.1FForcedSScheduled 2ReasonA-Equipment FailuretExplain)
Very truly yours, J. A. Stall Vice President St. Lucie Plant JAS/spt Attachments cc:     Regional Administrator, USNRC, Region II Senior Resident Inspector, USNRC, St. Lucie Plant 9904160174 97033i PDR    ADOCK 05000335 PDR an FPL Group company
B-Maintenance orTestC-Refueling D-Regulatory Restriction E-OperatorTrainingrLicenseExamination F-Administrative G-Operational ErrortExplain)
 
H-OthertExplain)
DOCKET NO              50 - 335 UNIT NAME              ST. LUCIE UNIT 1 DATE                    04/05/99 COMPLETED BY            J. A. ROGERS TELEPHONE              561/467/7296 REPORTING PERIOD:               MARCH 1999
Method1-Manual2-ManualScram3-Automatic Scram4-Continued 5-LoadReduction 9-Other(Explain) 091581EFL}}
: 1. Design Electrical Rating (Mwe-Net)     830
: 2. Maximum Dependable Capacity (Mwe-Net)   839 MONTH  -YTD-   CUMULATIVE
: 3. Number  of Hours Reactor Critical      744    2160      154129.5
: 4. Number  of Hours  Generator On Line    744    2160      152493.7
: 5. Unit Reserve Shutdown Hours              0.0    0.0      0.0
: 6. Net Electrical Energy   (MWH)           636717  1848192  123768730
 
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.:           50-335 UNIT:                 St. Lucie 81 DATE:                 Apr. 5, 1999 COMPLETED BY:         J.A.ROGERS TELEPHONE:            (561) 467-7296 REPORT MONTH March 1999 Unit 1 operated at essentially full power for the entire month of March.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.
 
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET      NO.:               50-335 UNIT:                           St. Lucie N1 DATE:                           Apr. 5, 1999 COMPLETED                      J.A.ROGERS BY'ELEPHONE:
(561) 467-7296 REPORT MONTH March 1999 Number        Date TYPe  Duration      Reason    Method  of                      Cause      & Corrective 1      (Hours)         2      Shutting                                Action to Down                          Prevent Recurrence Reactor3 Unit l operated at essentially full poorer for the entire month of March.
3 F Forced            Reason                                                Method
                          -                                                    1 - Manual S Scheduled          A
                          - MaintenanceFailure Equipment         tExplain) 2 - Manual Scram B
C - Refueling or Test                                  3 - Automatic Scram D - Regulatory Restriction                               - Continued E - Operator Training a License  Examination 4
5 - Load Reduction F - Administrative                                     9 - Other <Explain)
G - Operational Error (Explain)
H - Other (Explain) 091587 IPL
 
DOCKET NO              50 - 389 UNIT NAME              ST. LUCIE UNIT 2 DATE                    04/05/99 COMPLETED BY            J. A. ROGERS TELEPHONE              561/467/7296 REPORTING PERIOD:               MARCH 1999
: 1. Design Electrical Rating (Mwe-Net)     830
: 2. Maximum Dependable Capacity (Mwe-Net)   839 MONTH  -YTD-   CUMULATIVE
: 3. Number  of Hours Reactor Critical        744  2160      117459.7
: 4. Number  of Hours  Generator On Line      744  2160      115810.7
: 5. Unit Reserve Shutdown Hours              0.0  0.0      0.0
: 6. Net Electrical Energy (MWH)              637047 1844583  94850427
 
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.:         50-389 UNIT:                 St. Lucie &#xb9;2 DATE:                Apr. 5, 1999 COMPLETED BY:        S.A.ROGERS TELEPHONE:            (561) 467-7296 REPORT MONTH March 1999 Unit 2 operated at essentially full power for the entire month of March.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.
 
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET    NO.:             50-389 UNIT:                       St. Lucia N2 DATE:                       Apr. 5, 1999 COMPLETED BY:               J.A.ROGERS TELEPHONE                  (561) 467-7296 REPORT MONTH March 1999 Number        Date Type                Reason    Method  of                      Cause      tx Corrective 1  Duration          2      Shutting                                Action to (Hours)                     Down                          Prevent Recurrence Reactor3 Unit 2 operated at essentially full poem for the entire month of March.
1                    2 F Forced            Reason                                                Method
                            -                                                    1 - Manual S Scheduled          A
                            - MaintenanceFailure Equipment         tExplain) 2 - Manual Scram B
C - Refueling or Test                                  3 - Automatic Scram D - Regulatory Restriction                               - Continued E - Operator Training r License  Examination 4
5 - Load Reduction F - Administrative                                     9  Other (Explain)
G - Operational Error tExplain)
H - Other tExplain) 091581 EFL}}

Latest revision as of 21:44, 29 October 2019

Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr
ML17229B096
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 03/31/1999
From: Rogers J, Stall J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-02, GL-97-2, L-99-088, L-99-88, NUDOCS 9904160174
Download: ML17229B096 (8)


Text

CATEGORY 1 .

REGULA~ Y INFORMATION D1STRIBUTI .SYSTEM (RIDS)

ACCESSI'ON NBR:9904160174 DOC.DATE: 99/03/31 NOTARIZED: NO DOCKET I FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 50-,389'St. Lucie Plant, Unit 2, Florida Power S Light Co. 05000389 AUTH.NAME AUTHOR AFFILIATION ROGERS,J.A. Florida Power Ec Light Co.

STALL,J.A. Florida Power Ec Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Mar 1999 for St Lucie,Units 1 8c 2.With 990408 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

E NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR' ENCL ID CODE/NAME LTTR ENCL PD2-3 PD 1 GLEAVES,W 1 1 INTERNAL: ACRS 1 1 AEOD/SPD/RRAB 1 1 CENTER 01 1 OC/DBA/PAD 1 1 1

EXTERNAL: LMITCO MARSHALL 1 1 NOAC 1 1 NRC PDR 1 1 D

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

Florida Powers Light Company,6351 S. Ocean Drive, Jensen Beach, FL 34957 Aped.l 8, 1999 L-99-088 10 CFR 50.36 10 CFR 50.4 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2

'ocket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Pursuant to Technical Specification 6.9.1.6 and the guidance of Generic Letter 97-02, attached are the March 1999 Operating Data Reports, Summary of Operating Experience Reports, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.

Please contact us should there be any questions regarding this information.

Very truly yours, J. A. Stall Vice President St. Lucie Plant JAS/spt Attachments cc: Regional Administrator, USNRC, Region II Senior Resident Inspector, USNRC, St. Lucie Plant 9904160174 97033i PDR ADOCK 05000335 PDR an FPL Group company

DOCKET NO 50 - 335 UNIT NAME ST. LUCIE UNIT 1 DATE 04/05/99 COMPLETED BY J. A. ROGERS TELEPHONE 561/467/7296 REPORTING PERIOD: MARCH 1999

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net) 839 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Critical 744 2160 154129.5
4. Number of Hours Generator On Line 744 2160 152493.7
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy (MWH) 636717 1848192 123768730

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-335 UNIT: St. Lucie 81 DATE: Apr. 5, 1999 COMPLETED BY: J.A.ROGERS TELEPHONE: (561) 467-7296 REPORT MONTH March 1999 Unit 1 operated at essentially full power for the entire month of March.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT: St. Lucie N1 DATE: Apr. 5, 1999 COMPLETED J.A.ROGERS BY'ELEPHONE:

(561) 467-7296 REPORT MONTH March 1999 Number Date TYPe Duration Reason Method of Cause & Corrective 1 (Hours) 2 Shutting Action to Down Prevent Recurrence Reactor3 Unit l operated at essentially full poorer for the entire month of March.

3 F Forced Reason Method

- 1 - Manual S Scheduled A

- MaintenanceFailure Equipment tExplain) 2 - Manual Scram B

C - Refueling or Test 3 - Automatic Scram D - Regulatory Restriction - Continued E - Operator Training a License Examination 4

5 - Load Reduction F - Administrative 9 - Other <Explain)

G - Operational Error (Explain)

H - Other (Explain) 091587 IPL

DOCKET NO 50 - 389 UNIT NAME ST. LUCIE UNIT 2 DATE 04/05/99 COMPLETED BY J. A. ROGERS TELEPHONE 561/467/7296 REPORTING PERIOD: MARCH 1999

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net) 839 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Critical 744 2160 117459.7
4. Number of Hours Generator On Line 744 2160 115810.7
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy (MWH) 637047 1844583 94850427

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-389 UNIT: St. Lucie ¹2 DATE: Apr. 5, 1999 COMPLETED BY: S.A.ROGERS TELEPHONE: (561) 467-7296 REPORT MONTH March 1999 Unit 2 operated at essentially full power for the entire month of March.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT: St. Lucia N2 DATE: Apr. 5, 1999 COMPLETED BY: J.A.ROGERS TELEPHONE (561) 467-7296 REPORT MONTH March 1999 Number Date Type Reason Method of Cause tx Corrective 1 Duration 2 Shutting Action to (Hours) Down Prevent Recurrence Reactor3 Unit 2 operated at essentially full poem for the entire month of March.

1 2 F Forced Reason Method

- 1 - Manual S Scheduled A

- MaintenanceFailure Equipment tExplain) 2 - Manual Scram B

C - Refueling or Test 3 - Automatic Scram D - Regulatory Restriction - Continued E - Operator Training r License Examination 4

5 - Load Reduction F - Administrative 9 Other (Explain)

G - Operational Error tExplain)

H - Other tExplain) 091581 EFL