ML17240A409: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(8 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML17240A409 | | number = ML17240A409 | ||
| issue date = 08/28/2017 | | issue date = 08/28/2017 | ||
| title = | | title = Notification of NRC Design Bases Assurance Inspection (Teams) (05000582/2017008) and Initial Request for Information | ||
| author name = Farnholtz T | | author name = Farnholtz T | ||
| author affiliation = NRC/RGN-IV/DRS/EB-1 | | author affiliation = NRC/RGN-IV/DRS/EB-1 | ||
| addressee name = Chisum M | | addressee name = Chisum M | ||
| addressee affiliation = Entergy Operations, Inc | | addressee affiliation = Entergy Operations, Inc | ||
| docket = 05000382 | | docket = 05000382 | ||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:UNITED STATES | ||
NUCLEAR REGULATORY COMMISSION | |||
REGION IV | |||
1600 E. LAMAR BLVD | |||
ARLINGTON, TX 76011-4511 | |||
August 28, 2017 | |||
Mr. Michael R. Chisum, Vice President | |||
Entergy Operations, Inc. | |||
17265 River Road | |||
Killona, LA 70057-0751 | |||
SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NOTIFICATION OF NRC | |||
DESIGN BASES ASSURANCE INSPECTION (TEAMS) (05000582/2017008) | |||
AND INITIAL REQUEST FOR INFORMATION | |||
Dear Mr. Chisum: | |||
On October 11, 2017, the NRC will begin a triennial baseline Design Bases Assurance | |||
Inspection at the Waterford Steam Electric Station, Unit 3. A six-person team will perform this | |||
inspection using NRC Inspection Procedure 71111, Attachment 21M, Design Bases Assurance | |||
Inspection (Teams). | |||
The inspection focuses on the maintenance of component design bases and modifications | |||
made to structures, systems, and components. The samples reviewed during this inspection | |||
will be identified during an information gathering visit and during the subsequent in-office | |||
preparation week. In addition, a number of operating experience issues will also be selected for | |||
review. | |||
The inspection will include an information gathering site visit by the team leader, and two weeks | |||
of onsite inspection by the team. The inspection will consist of three NRC inspectors, two | |||
contractors, and one operations examiner. The current inspection schedule is as follows: | |||
Onsite Information Gathering Visit: October 11, 2017 | |||
Preparation Week: October 16-20, 2017 | |||
Onsite Weeks: October 23-27, 2017, and November 13-17, 2017 | |||
The purpose of the information gathering visit is to meet with members of your staff to identify | |||
potential risk-significant components and operator actions. The lead inspector will also request | |||
a tour of the plant with members of your operations staff and probabilistic safety assessment | |||
staff. During the onsite weeks, several days and administration will be needed on the plant- | |||
referenced simulator in order to facilitate the development of operator action-based scenarios. | |||
Additional information and documentation needed to support the inspection will be identified | |||
during the inspection, including interviews with engineering managers, engineers, and | |||
probabilistic safety assessment staff. | |||
M. Chisum 2 | |||
Our experience with these inspections has shown that they are extremely resource intensive, | |||
both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact | |||
on the site and to ensure a productive inspection, we have enclosed a request for information | |||
needed for the inspection. The request has been divided into two groups. The first group lists | |||
information necessary for the information gathering visit and for general preparation. This | |||
information should be available to the regional office no later than October 4, 2017, unless | |||
otherwise stated. If possible, this information should be provided electronically to the lead | |||
inspector. Since the inspection will be concentrated on high risk/low margin components and | |||
modifications, calculations associated with your list of high risk components and modifications | |||
should be available to review during the information gathering visit to assist in our selection of | |||
components based on available design margin. | |||
The second group of documents requested lists information necessary to aid the inspection | |||
team in tracking issues identified as a result of the inspection. It is requested that this | |||
information be provided to the lead inspector as the information is generated during the | |||
inspection. An additional request will be made by the team during the preparation week once | |||
the specific components and modifications have been selected. Additional requests by | |||
inspectors will also be made throughout the onsite weeks for specific documents needed to | |||
complete the review. It is important that all of these documents are up-to-date and complete in | |||
order to minimize the number of additional documents requested during the preparation and/or | |||
onsite portions of the inspection. In order to facilitate the inspection, we request that a contact | |||
individual be assigned to each inspector to ensure information requests, questions, and | |||
concerns are addressed in a timely manner. | |||
The lead inspector for this inspection is Gerond George. We understand that our licensing | |||
engineer contact for this inspection is Ms. M. Zamber. If there are any questions about the | |||
inspection or the requested materials, please contact the lead inspector by telephone at | |||
817-200-1562 or by e-mail at Gerond.George@nrc.gov. | |||
This letter does not contain new or amended information collection requirements subject | |||
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information | |||
collection requirements were approved by the Office of Management and Budget, control | |||
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to | |||
respond to, a request for information or an information collection requirement unless the | |||
requesting document displays a currently valid Office of Management and Budget control | |||
number. | |||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be | |||
made available electronically for public inspection in the NRC Public Document Room or from | |||
the Publicly Available Records (PARS) component of NRCs document system (ADAMS). | |||
M. Chisum 3 | |||
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the | |||
Public Electronic Reading Room). | |||
Sincerely, | |||
/RA/ | |||
Thomas R. Farnholtz, Chief | |||
Engineering Branch 1 | |||
Division of Reactor Safety | |||
Docket No. 50-382 | |||
License No. NPF-38 | |||
Enclosure: | |||
Design Bases Assurance Inspection (Teams) | |||
Request for Information | |||
Electronic Distribution for | |||
Waterford Steam Electric Station, Unit 3 | |||
The | ML17240A409 | ||
SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: | |||
By: GGeorge Yes No Publicly Available Sensitive NRC-002 | |||
OFFICE SRI:EB1 C:EB1 | |||
NAME GGeorge TFarnholtz | |||
SIGNATURE /RA/ /RA/ | |||
DATE 8/24/17 8/28/17 | |||
Initial Request for Information | |||
Design Bases Assurance Inspection (Teams) | |||
Waterford Steam Electric Station, Unit 3 | |||
Inspection Report: 05000382/2017008 | |||
Information Gathering Dates: October 11, 2017 | |||
Inspection Dates: October 23-27, 2017, and November 13-17, 2017 | |||
Inspection Procedure: IP 71111, Attachment 21M, Design Bases Assurance | |||
Inspection (Teams) | |||
Lead Inspector: Gerond George, Senior Reactor Inspector | |||
I. Information requested prior to information gathering visit (by October 4, 2017). | |||
The following information (Section I of this enclosure) should be sent to the Region IV | |||
office in hard copy or electronic format (Certrec IMS preferred), to the attention of | |||
Gerond George by October 4, 2017, to facilitate the reduction in the items to be selected | |||
for a final list during the information gathering visit. The specific items selected from the | |||
lists shall be available and ready for review on the day indicated in this request. Please | |||
provide requested documentation electronically in pdf files, Excel, or other searchable | |||
formats, if possible. The information should contain descriptive names and be indexed | |||
and hyperlinked to facilitate ease of use. Information in lists should contain enough | |||
information to be easily understood by someone who has knowledge of pressurized | |||
water reactor technology. If requested documents are large and only hard copy formats | |||
are available, please inform the inspector and provide subject documentation during the | |||
first day of the onsite inspection. | |||
1. An Excel spreadsheet of equipment basic events (with definitions), including | |||
importance measures sorted by risk achievement worth and Fussell-Vesely from | |||
your internal events probabilistic risk assessment. Include basic events with risk | |||
achievement worth value of 1.3 or greater. | |||
2. A list of the top 50 cut-sets from your PRA. | |||
3. Copies of probabilistic risk assessment system notebooks and the latest | |||
probabilistic risk assessment summary document. | |||
4. An Excel spreadsheet of probabilistic risk assessment human action basic events or | |||
risk ranking of operator actions from your site-specific PSA sorted by risk | |||
achievement worth and Fussell-Vesely. Provide copies of your human reliability | |||
worksheets for these items. | |||
5. If you have an external events or fire PSA model, provide the information requested | |||
in items 1-4 for external events and fire. | |||
Enclosure | |||
6. A list of high large early release frequency impact events and associated | |||
components. | |||
7. Structures, systems, and components in the Maintenance Rule (a)(1) category. | |||
8. A list of high risk maintenance rule systems/components and functions; based on | |||
engineering or expert panel judgment. | |||
9. Site top 10 issues list, if available. | |||
10. Any pre-existing list of components and associated calculations with low design | |||
margins. | |||
11. A list of operating experience evaluations for the last 3 years. | |||
12. A list of all time-critical operator actions in procedures. | |||
13. A list of current operator work arounds/burdens. | |||
14. Procedures used to accomplish operator actions associated with the basic events | |||
credited in your PRA. | |||
15. Lists of permanent and temporary modifications performed in the past 5 years to | |||
structures, systems, and components sorted by component identified in Item 1. | |||
16. List of root cause evaluations associated with component failures or design issues | |||
initiated/completed in the last 5 years. | |||
17. A list of any common-cause failures of components in the last 3 years. | |||
18. A copy of any internal/external self-assessments and associated corrective action | |||
documents generated in preparation for this inspection. | |||
19. A copy of engineering/operations-related audits completed in the last 2 years. | |||
20. Electronic copies of the Technical Specifications, Technical Specifications Bases, | |||
and the Final Safety Analysis Report, as updated. | |||
21. A copy of the Individual Plant Examination of External Events, if available | |||
electronically. | |||
22. One-line drawings of emergency core cooling system, ultimate heat sink, emergency | |||
feedwater, safety-related electrical systems. | |||
23. A list of licensee contacts for the inspection team with phone numbers. | |||
24. A copy of the current management and engineering organizational charts. | |||
2 | |||
II. Information requested to be provided for preparation week and throughout the | |||
inspection (by October 16, 2017, if possible) | |||
1. Electronic copies of the design bases documents for selected components and | |||
modifications. | |||
2. Electronic copies of the system health notebooks for selected components and | |||
modifications. | |||
3. A list of the design calculations that provide the design margin information for | |||
selected components. (Calculations for selected components should be available | |||
during the information gathering visit.) | |||
4. Calculations and drawings associated with selected components. | |||
5. Modification documentation associated with modifications selected from Item I.15, | |||
this includes: | |||
a. Post-modification testing, including performance characteristics affected, | |||
assumptions, and acceptance criteria associated with modifications | |||
selected. | |||
b. Updated maintenance and surveillance procedures associated with | |||
modifications. | |||
c. Updated operation procedures and training plans associated with the | |||
modifications. | |||
6. Copies of any corrective action documents generated as a result of the teams | |||
questions or queries during this inspection. | |||
7. Copies of the list of questions submitted by the team members and the | |||
status/resolution of the information requested (provide daily during the inspection to | |||
each team member). | |||
Inspector Contact Information: | |||
Gerond A. George | |||
Senior Reactor Inspector | |||
817-200-1562 | |||
Gerond.George@nrc.gov | |||
Mailing Address: | |||
U.S. NRC, Region IV | |||
Attn: Gerond George | |||
1600 East Lamar Blvd. | |||
Arlington, TX 76011-4511 | |||
3 | |||
}} | }} |
Latest revision as of 20:26, 29 October 2019
ML17240A409 | |
Person / Time | |
---|---|
Site: | Waterford |
Issue date: | 08/28/2017 |
From: | Thomas Farnholtz Region 4 Engineering Branch 1 |
To: | Chisum M Entergy Operations |
References | |
IR 2017008 | |
Download: ML17240A409 (7) | |
See also: IR 05000582/2017008
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E. LAMAR BLVD
ARLINGTON, TX 76011-4511
August 28, 2017
Mr. Michael R. Chisum, Vice President
Entergy Operations, Inc.
17265 River Road
Killona, LA 70057-0751
SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NOTIFICATION OF NRC
DESIGN BASES ASSURANCE INSPECTION (TEAMS) (05000582/2017008)
AND INITIAL REQUEST FOR INFORMATION
Dear Mr. Chisum:
On October 11, 2017, the NRC will begin a triennial baseline Design Bases Assurance
Inspection at the Waterford Steam Electric Station, Unit 3. A six-person team will perform this
inspection using NRC Inspection Procedure 71111, Attachment 21M, Design Bases Assurance
Inspection (Teams).
The inspection focuses on the maintenance of component design bases and modifications
made to structures, systems, and components. The samples reviewed during this inspection
will be identified during an information gathering visit and during the subsequent in-office
preparation week. In addition, a number of operating experience issues will also be selected for
review.
The inspection will include an information gathering site visit by the team leader, and two weeks
of onsite inspection by the team. The inspection will consist of three NRC inspectors, two
contractors, and one operations examiner. The current inspection schedule is as follows:
Onsite Information Gathering Visit: October 11, 2017
Preparation Week: October 16-20, 2017
Onsite Weeks: October 23-27, 2017, and November 13-17, 2017
The purpose of the information gathering visit is to meet with members of your staff to identify
potential risk-significant components and operator actions. The lead inspector will also request
a tour of the plant with members of your operations staff and probabilistic safety assessment
staff. During the onsite weeks, several days and administration will be needed on the plant-
referenced simulator in order to facilitate the development of operator action-based scenarios.
Additional information and documentation needed to support the inspection will be identified
during the inspection, including interviews with engineering managers, engineers, and
probabilistic safety assessment staff.
M. Chisum 2
Our experience with these inspections has shown that they are extremely resource intensive,
both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact
on the site and to ensure a productive inspection, we have enclosed a request for information
needed for the inspection. The request has been divided into two groups. The first group lists
information necessary for the information gathering visit and for general preparation. This
information should be available to the regional office no later than October 4, 2017, unless
otherwise stated. If possible, this information should be provided electronically to the lead
inspector. Since the inspection will be concentrated on high risk/low margin components and
modifications, calculations associated with your list of high risk components and modifications
should be available to review during the information gathering visit to assist in our selection of
components based on available design margin.
The second group of documents requested lists information necessary to aid the inspection
team in tracking issues identified as a result of the inspection. It is requested that this
information be provided to the lead inspector as the information is generated during the
inspection. An additional request will be made by the team during the preparation week once
the specific components and modifications have been selected. Additional requests by
inspectors will also be made throughout the onsite weeks for specific documents needed to
complete the review. It is important that all of these documents are up-to-date and complete in
order to minimize the number of additional documents requested during the preparation and/or
onsite portions of the inspection. In order to facilitate the inspection, we request that a contact
individual be assigned to each inspector to ensure information requests, questions, and
concerns are addressed in a timely manner.
The lead inspector for this inspection is Gerond George. We understand that our licensing
engineer contact for this inspection is Ms. M. Zamber. If there are any questions about the
inspection or the requested materials, please contact the lead inspector by telephone at
817-200-1562 or by e-mail at Gerond.George@nrc.gov.
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, control
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
made available electronically for public inspection in the NRC Public Document Room or from
the Publicly Available Records (PARS) component of NRCs document system (ADAMS).
M. Chisum 3
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the
Public Electronic Reading Room).
Sincerely,
/RA/
Thomas R. Farnholtz, Chief
Engineering Branch 1
Division of Reactor Safety
Docket No. 50-382
License No. NPF-38
Enclosure:
Design Bases Assurance Inspection (Teams)
Request for Information
Electronic Distribution for
Waterford Steam Electric Station, Unit 3
SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:
By: GGeorge Yes No Publicly Available Sensitive NRC-002
OFFICE SRI:EB1 C:EB1
NAME GGeorge TFarnholtz
SIGNATURE /RA/ /RA/
DATE 8/24/17 8/28/17
Initial Request for Information
Design Bases Assurance Inspection (Teams)
Waterford Steam Electric Station, Unit 3
Inspection Report: 05000382/2017008
Information Gathering Dates: October 11, 2017
Inspection Dates: October 23-27, 2017, and November 13-17, 2017
Inspection Procedure: IP 71111, Attachment 21M, Design Bases Assurance
Inspection (Teams)
Lead Inspector: Gerond George, Senior Reactor Inspector
I. Information requested prior to information gathering visit (by October 4, 2017).
The following information (Section I of this enclosure) should be sent to the Region IV
office in hard copy or electronic format (Certrec IMS preferred), to the attention of
Gerond George by October 4, 2017, to facilitate the reduction in the items to be selected
for a final list during the information gathering visit. The specific items selected from the
lists shall be available and ready for review on the day indicated in this request. Please
provide requested documentation electronically in pdf files, Excel, or other searchable
formats, if possible. The information should contain descriptive names and be indexed
and hyperlinked to facilitate ease of use. Information in lists should contain enough
information to be easily understood by someone who has knowledge of pressurized
water reactor technology. If requested documents are large and only hard copy formats
are available, please inform the inspector and provide subject documentation during the
first day of the onsite inspection.
1. An Excel spreadsheet of equipment basic events (with definitions), including
importance measures sorted by risk achievement worth and Fussell-Vesely from
your internal events probabilistic risk assessment. Include basic events with risk
achievement worth value of 1.3 or greater.
2. A list of the top 50 cut-sets from your PRA.
3. Copies of probabilistic risk assessment system notebooks and the latest
probabilistic risk assessment summary document.
4. An Excel spreadsheet of probabilistic risk assessment human action basic events or
risk ranking of operator actions from your site-specific PSA sorted by risk
achievement worth and Fussell-Vesely. Provide copies of your human reliability
worksheets for these items.
5. If you have an external events or fire PSA model, provide the information requested
in items 1-4 for external events and fire.
Enclosure
6. A list of high large early release frequency impact events and associated
components.
7. Structures, systems, and components in the Maintenance Rule (a)(1) category.
8. A list of high risk maintenance rule systems/components and functions; based on
engineering or expert panel judgment.
9. Site top 10 issues list, if available.
10. Any pre-existing list of components and associated calculations with low design
margins.
11. A list of operating experience evaluations for the last 3 years.
12. A list of all time-critical operator actions in procedures.
13. A list of current operator work arounds/burdens.
14. Procedures used to accomplish operator actions associated with the basic events
credited in your PRA.
15. Lists of permanent and temporary modifications performed in the past 5 years to
structures, systems, and components sorted by component identified in Item 1.
16. List of root cause evaluations associated with component failures or design issues
initiated/completed in the last 5 years.
17. A list of any common-cause failures of components in the last 3 years.
18. A copy of any internal/external self-assessments and associated corrective action
documents generated in preparation for this inspection.
19. A copy of engineering/operations-related audits completed in the last 2 years.
20. Electronic copies of the Technical Specifications, Technical Specifications Bases,
and the Final Safety Analysis Report, as updated.
21. A copy of the Individual Plant Examination of External Events, if available
electronically.
22. One-line drawings of emergency core cooling system, ultimate heat sink, emergency
feedwater, safety-related electrical systems.
23. A list of licensee contacts for the inspection team with phone numbers.
24. A copy of the current management and engineering organizational charts.
2
II. Information requested to be provided for preparation week and throughout the
inspection (by October 16, 2017, if possible)
1. Electronic copies of the design bases documents for selected components and
modifications.
2. Electronic copies of the system health notebooks for selected components and
modifications.
3. A list of the design calculations that provide the design margin information for
selected components. (Calculations for selected components should be available
during the information gathering visit.)
4. Calculations and drawings associated with selected components.
5. Modification documentation associated with modifications selected from Item I.15,
this includes:
a. Post-modification testing, including performance characteristics affected,
assumptions, and acceptance criteria associated with modifications
selected.
b. Updated maintenance and surveillance procedures associated with
modifications.
c. Updated operation procedures and training plans associated with the
modifications.
6. Copies of any corrective action documents generated as a result of the teams
questions or queries during this inspection.
7. Copies of the list of questions submitted by the team members and the
status/resolution of the information requested (provide daily during the inspection to
each team member).
Inspector Contact Information:
Gerond A. George
Senior Reactor Inspector
817-200-1562
Gerond.George@nrc.gov
Mailing Address:
U.S. NRC, Region IV
Attn: Gerond George
1600 East Lamar Blvd.
Arlington, TX 76011-4511
3