ML17241A333: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 04/30/1999 | | issue date = 04/30/1999 | ||
| title = Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr | | title = Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr | ||
| author name = | | author name = Rogers J, Stall J | ||
| author affiliation = FLORIDA POWER & LIGHT CO. | | author affiliation = FLORIDA POWER & LIGHT CO. | ||
| addressee name = | | addressee name = | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:CATFQORY 1~i REGULA Y INFORMATION DISTRIBUTI | {{#Wiki_filter:CATFQORY 1 | ||
---SYSTEM (RIDS))ACCESSION NBR:9905240208 DOC.DATE: 99/04/30 NOTARIZED: | ~i REGULA Y INFORMATION DISTRIBUTI ---SYSTEM (RIDS) | ||
NO FACIL:50-335 St.Lucie Plant, Unit 1, Florida Power&.Light Co.,50-389 St.Lucie Plant, Unit 2, Florida Power&Light Co.AUTH.NAME AUTHOR AFFILIATION | ) | ||
ACCESSION NBR:9905240208 DOC.DATE: 99/04/30 NOTARIZED: NO DOCKET FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power &. Light Co. 05000335 | |||
Florida Power&Light Co.STALL,J.A. | ,50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION. | ||
Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILXATION | ROGERS,J.A. Florida Power & Light Co. | ||
STALL,J.A. Florida Power & Light Co. | |||
RECIP.NAME RECIPIENT AFFILXATION | |||
==SUBJECT:== | ==SUBJECT:== | ||
Monthly operating rept for Apr 1999 for St Lucie,Units 1&2.With 990517 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: RECIPIENT, ID CODE/NAME LPD2-2 PD | Monthly operating rept for Apr 1999 for St Lucie,Units 1 & | ||
PLEASE HELP US TO REDUCE WASTE.'TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 41S-2083 TOTAL NUMBER.OF COPIES REQUIRED: LTTR 10 ENCL'0 PPlL May 17, 1999 L-99-113 10 CFR 50.36 10 CFR 50.4 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St.Lucie Units 1 and 2 Docket Nos.50-335 and 50-389 Monthl 0 eratin Re ort Pursuant to Technical Specification 6.9.1.6 and the guidance of Generic Letter 97-02, attached are the April 1999 Operating Data Reports, Summary of Operating Experience Reports, and Unit Shutdowns and Power Reductions for St.Lucie Units 1 and 2.Please contact us should there be any questions regarding this information. | 2.With 990517 ltr. | ||
Very truly yours, J.A.Stall Vice President St.Lucie Plant JAS/spt Attachments | DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: | ||
~~)v'~cc: Regional Administrator, USNRC, Region II Senior Resident Inspector, USNRC, St.Lucie Plant 9905240208 990430 PDR ADOCK 05000335 R POR an FPL Group company DOCKET NO 50-335 UNIT NAME ST.LUCIE UNIT 1 DATE 05/05/99 COMPLETED BY J.A.ROGERS TELEPHONE 561/467/7296 REPORTING PERIOD: APRIL 1999 1.Design Electrical Rating (Mwe-Net)830 2.Maximum Dependable Capacity (Mwe-Net)839 MONTH-YTD-CUMULATIVE 3.Number of Hours Reactor Critical 4.Number of Hours Generator On Line 5.Unit Reserve Shutdown Hours | TITLE: Monthly Operating Report (per Tech Specs) | ||
NOTES: | |||
RECIPIENT, COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL LPD2-2 PD 1 1 GLEAVES,W 1 1 INTERNAL: ACRS 1 1 AEOD/SPD/RRAB 1 1 LE CENTER Ol 1 1 OC/DBA/PAD 1 1 1 1 EXTERNAL: LMITCO MARSHALL 1 1 NOAC 1 1 NRC PDR 1 1 D | |||
'E NOTE TO ALL "RIDS" RECIPIENTS: | |||
PLEASE HELP US TO REDUCE WASTE.'TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 41S-2083 TOTAL NUMBER. OF COPIES REQUIRED: LTTR 10 ENCL'0 | |||
PPlL May 17, 1999 L-99-113 10 CFR 50.36 10 CFR 50.4 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Pursuant to Technical Specification 6.9.1.6 and the guidance of Generic Letter 97-02, attached are the April 1999 Operating Data Reports, Summary of Operating Experience Reports, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2. | |||
Please contact us should there be any questions regarding this information. | |||
Very truly yours, J. A. Stall Vice President St. Lucie Plant JAS/spt Attachments ~~) v'~ | |||
cc: Regional Administrator, USNRC, Region II Senior Resident Inspector, USNRC, St. Lucie Plant 9905240208 990430 PDR ADOCK 05000335 R POR an FPL Group company | |||
DOCKET NO 50 - 335 UNIT NAME ST. LUCIE UNIT 1 DATE 05/05/99 COMPLETED BY J. A. ROGERS TELEPHONE 561/467/7296 REPORTING PERIOD: APRIL 1999 | |||
: 1. Design Electrical Rating (Mwe-Net) 830 | |||
: 2. Maximum Dependable Capacity (Mwe-Net) 839 MONTH -YTD- CUMULATIVE | |||
: 3. Number of Hours Reactor Critical 719 2879 154848.5 | |||
: 4. Number of Hours Generator On Line 719 2879 153212.7 | |||
: 5. Unit Reserve Shutdown Hours 0.0 0.0 0.0 | |||
: 6. Net Electrical Energy (MWH) 613694 2461886 124382424 | |||
==SUMMARY== | ==SUMMARY== | ||
OF OPERATING EXPERIENCE DOCKET NO.: 50-335 UNIT: St.Lucie¹1 DATE<: May 5, 1999 COMPLETE<D BY: J.A.ROGERS TELEPHONE: | OF OPERATING EXPERIENCE DOCKET NO.: 50-335 UNIT: St. Lucie ¹1 DATE<: May 5, 1999 COMPLETE<D BY: J. A. ROGERS TELEPHONE: (561) 467-7296 REPORT MONTH April 1999 Unit 1 operated at essentially full power for the entire month of April. | ||
(561)467-7296 REPORT MONTH April 1999 Unit 1 operated at essentially full power for the entire month of April.In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period. | In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period. | ||
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: | |||
50-335 St.Lucie I1 May 5, 1999 1T.A.ROGERS (561)467-7296 REPORT MONTH~Aril 1999 Number Date Typel Duration | UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT: St. Lucie I1 DATE May 5, 1999 COMPLETED BY: 1T.A.ROGERS TELEPHONE: (561) 467-7296 REPORT MONTH ~Aril 1999 Number Date Typel Duration Reason2 Method of Cause a Corrective (Hours) Shutting Action to Down Reactor Prevent Recurrence 3 | ||
Unit 1 operated at essentially full power for the entire month of April. | |||
1 3 F Forced Reason Method S Scheduled A - Equipment Failure (Explain) 1 - Manual B - Haintenance or Test 2 - Manual Scram C - Refueling 3 Automatic Scram D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain) | |||
G - Operational Error (Explain) | |||
H - Other (Explain) 091589 PPL | |||
DOCKET NO 50 - 389 UNIT NAME ST. LUCIE UNIT 2 DATE 05/05/99 COMPLETED BY J. A. ROGERS TELEPHONE 561/467/7296 REPORTING PERIOD: APRIL 1999 | |||
: 1. Design Electrical Rating (Mwe-Net) 830 | |||
: 2. Maximum Dependable Capacity (Mwe-Net) 839 MONTH -YTD- CUMULATIVE | |||
: 3. Number of Hours Reactor Critical 719 2879 118178.7 | |||
: 4. Number of Hours Generator On Line 719 2879 116529.7 | |||
: 5. Unit Reserve Shutdown Hours 0.0 0.0 0.0 | |||
: 6. Net Electrical Energy (MWH) 560248 2404831 95410675 | |||
==SUMMARY== | ==SUMMARY== | ||
OF OPERATING EXPERIENCE DOCKI<'T NO.: | OF OPERATING EXPERIENCE DOCKI<'T NO.: 50-389 UNIT: St. Lucie ¹2 DATE<: May 5, 1999 COMPLETED BY: J. A. ROGERS TELEPHONE: (561) 467-7296 REPORT MONTH ~Aril 1999 Unit 2 operated at essentially full power through April 5. On April 6, the unit downpowered to approximately 28% power due to a leak on the suction line ECCS low pressure piping. Power was increased to approximately 50% during repairs. The unit remained at 50% through April 10 and increased power to 95% by end of the day. Details of this event may be found in LER 1999-003. | ||
50-389 St.Lucie¹2 May 5, 1999 J.A.ROGERS (561)467-7296 REPORT MONTH~Aril 1999 Unit 2 operated at essentially full power through April 5.On April 6, the unit downpowered to approximately 28%power due to a leak on the suction line ECCS low pressure piping.Power was increased to approximately 50%during repairs.The unit remained at 50%through April 10 and increased power to 95%by end of the day.Details of this event may be found in LER 1999-003.Unit 2 remained at essentially full power for the remainder of the month.In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period. | Unit 2 remained at essentially full power for the remainder of the month. | ||
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: | In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period. | ||
50-389 St.Lucie I2 May 5, 1999 iT.A.ROGERS (561)467-7296 | |||
~ | |||
~ | |||
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT: St. Lucie I2 DATE: May 5, 1999 COMPLETED BY: iT.A.ROGERS TELEPHONE: (561) 467-7296 Targe REPORT MONTH ~Aril 1999 Number Date Reason Method of Cause (c Corrective 1 Duration 2 Shutting Action to (Hours) Down Prevent Recurrence Reactor3 4/6/99 0.0 Unit 2 downpowered to approximately 28% due to a leak on suction line ECCS low pressure piping. | |||
Unit 2 power increased to and held at 50% power per management decision to repair a leak on suction line ECCS 4/6/99 0.0 low pressure piping. | |||
F Forced Reason Method S Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 Continued | |||
- Training - Load Reduction E | |||
F - Operator Administrative | |||
& License Examination 5 9 - Other (Explain) | |||
G - Operational Error (Explain) | |||
H - Other (Explain) 091589 PPZ,}} |
Latest revision as of 21:24, 29 October 2019
ML17241A333 | |
Person / Time | |
---|---|
Site: | Saint Lucie ![]() |
Issue date: | 04/30/1999 |
From: | Rogers J, Stall J FLORIDA POWER & LIGHT CO. |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
GL-97-02, GL-97-2, L-99-113, NUDOCS 9905240208 | |
Download: ML17241A333 (8) | |
Text
CATFQORY 1
~i REGULA Y INFORMATION DISTRIBUTI ---SYSTEM (RIDS)
)
ACCESSION NBR:9905240208 DOC.DATE: 99/04/30 NOTARIZED: NO DOCKET FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power &. Light Co. 05000335
,50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION.
ROGERS,J.A. Florida Power & Light Co.
STALL,J.A. Florida Power & Light Co.
RECIP.NAME RECIPIENT AFFILXATION
SUBJECT:
Monthly operating rept for Apr 1999 for St Lucie,Units 1 &
2.With 990517 ltr.
DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT, COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL LPD2-2 PD 1 1 GLEAVES,W 1 1 INTERNAL: ACRS 1 1 AEOD/SPD/RRAB 1 1 LE CENTER Ol 1 1 OC/DBA/PAD 1 1 1 1 EXTERNAL: LMITCO MARSHALL 1 1 NOAC 1 1 NRC PDR 1 1 D
'E NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE.'TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 41S-2083 TOTAL NUMBER. OF COPIES REQUIRED: LTTR 10 ENCL'0
PPlL May 17, 1999 L-99-113 10 CFR 50.36 10 CFR 50.4 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Pursuant to Technical Specification 6.9.1.6 and the guidance of Generic Letter 97-02, attached are the April 1999 Operating Data Reports, Summary of Operating Experience Reports, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.
Please contact us should there be any questions regarding this information.
Very truly yours, J. A. Stall Vice President St. Lucie Plant JAS/spt Attachments ~~) v'~
cc: Regional Administrator, USNRC, Region II Senior Resident Inspector, USNRC, St. Lucie Plant 9905240208 990430 PDR ADOCK 05000335 R POR an FPL Group company
DOCKET NO 50 - 335 UNIT NAME ST. LUCIE UNIT 1 DATE 05/05/99 COMPLETED BY J. A. ROGERS TELEPHONE 561/467/7296 REPORTING PERIOD: APRIL 1999
- 1. Design Electrical Rating (Mwe-Net) 830
- 2. Maximum Dependable Capacity (Mwe-Net) 839 MONTH -YTD- CUMULATIVE
- 3. Number of Hours Reactor Critical 719 2879 154848.5
- 4. Number of Hours Generator On Line 719 2879 153212.7
- 5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 6. Net Electrical Energy (MWH) 613694 2461886 124382424
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.: 50-335 UNIT: St. Lucie ¹1 DATE<: May 5, 1999 COMPLETE<D BY: J. A. ROGERS TELEPHONE: (561) 467-7296 REPORT MONTH April 1999 Unit 1 operated at essentially full power for the entire month of April.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT: St. Lucie I1 DATE May 5, 1999 COMPLETED BY: 1T.A.ROGERS TELEPHONE: (561) 467-7296 REPORT MONTH ~Aril 1999 Number Date Typel Duration Reason2 Method of Cause a Corrective (Hours) Shutting Action to Down Reactor Prevent Recurrence 3
Unit 1 operated at essentially full power for the entire month of April.
1 3 F Forced Reason Method S Scheduled A - Equipment Failure (Explain) 1 - Manual B - Haintenance or Test 2 - Manual Scram C - Refueling 3 Automatic Scram D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)
G - Operational Error (Explain)
H - Other (Explain) 091589 PPL
DOCKET NO 50 - 389 UNIT NAME ST. LUCIE UNIT 2 DATE 05/05/99 COMPLETED BY J. A. ROGERS TELEPHONE 561/467/7296 REPORTING PERIOD: APRIL 1999
- 1. Design Electrical Rating (Mwe-Net) 830
- 2. Maximum Dependable Capacity (Mwe-Net) 839 MONTH -YTD- CUMULATIVE
- 3. Number of Hours Reactor Critical 719 2879 118178.7
- 4. Number of Hours Generator On Line 719 2879 116529.7
- 5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 6. Net Electrical Energy (MWH) 560248 2404831 95410675
SUMMARY
OF OPERATING EXPERIENCE DOCKI<'T NO.: 50-389 UNIT: St. Lucie ¹2 DATE<: May 5, 1999 COMPLETED BY: J. A. ROGERS TELEPHONE: (561) 467-7296 REPORT MONTH ~Aril 1999 Unit 2 operated at essentially full power through April 5. On April 6, the unit downpowered to approximately 28% power due to a leak on the suction line ECCS low pressure piping. Power was increased to approximately 50% during repairs. The unit remained at 50% through April 10 and increased power to 95% by end of the day. Details of this event may be found in LER 1999-003.
Unit 2 remained at essentially full power for the remainder of the month.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.
~
~
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT: St. Lucie I2 DATE: May 5, 1999 COMPLETED BY: iT.A.ROGERS TELEPHONE: (561) 467-7296 Targe REPORT MONTH ~Aril 1999 Number Date Reason Method of Cause (c Corrective 1 Duration 2 Shutting Action to (Hours) Down Prevent Recurrence Reactor3 4/6/99 0.0 Unit 2 downpowered to approximately 28% due to a leak on suction line ECCS low pressure piping.
Unit 2 power increased to and held at 50% power per management decision to repair a leak on suction line ECCS 4/6/99 0.0 low pressure piping.
F Forced Reason Method S Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 Continued
- Training - Load Reduction E
F - Operator Administrative
& License Examination 5 9 - Other (Explain)
G - Operational Error (Explain)
H - Other (Explain) 091589 PPZ,