ML17326A051: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:REGULAT dY INFORMATION DISTRIBUTIO                SYSTEM (RIDS)
              -N                                                                            DOCKET  ¹ FACIL:50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana                      M  05000316
  ) AU~~H.NAME            AUTHOR AFFILIATION PRATT,M.M.            Indiana Michigan Power Co.
BAKKEN,A.C            Indiana Michigan Power Co.
RECIP.NAME            RECIPIENT AFFILIATION
 
==SUBJECT:==
Monthly operatin '                June    1999  for  DC  Cook Nuclear Plant, Unit .With 990709        ltr.
DISTRIBUTION CODE: IE24D        COPIES RECEIVED:LTR              ENCL      SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT            COPIES                  I REC 5'.I ENT          COPIES ID CODE/NAME          LTTR EiVCL        ID  CODE/NAME          LTTR ENCL STANG,J                  1    1                                                          0 INTERNA . FILE CENTE                  1    1        OC/DBA/PAD                1    1 S/DRXA OE              1    1        RGN3                      1    1 EXTERNAL: LMITCO MARSHALL              1    1        NOAC                      1    .1 NRC PDR                  1    1 D
0 C
M
                                                                                                      'E N
NOTE TO ALL  "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE.*TO HAVE YOUR, NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATIONS CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR                8  ENCL        8
 
0 rrl 4806 616 465 5901 FI ENEMAS NICNlCQN PQWM July 9, 1999 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Document Control Manager:
Pursuant to the requirements of Donald C; Cook Nuclear Piant Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for June 1999 is submitted.
Sincerely, A. Christopher Bakken, III Site Vice President ACB/bwo Attachment c:            NRC Region III NRC Project Manager NRR NRC Resident Inspector ANI Nuclear Engineering Department INPO Records Center G. P.      Arer t G. T.      Gaffney Canton D. R.      Hahn Department of Health S.          Hamming Department of Labor G.          John B.          Lewis McGraw-Hill Companies D. H.      Malin T. P.      Noonan D. W. Paul Lancaster J. E.      Pollock R. P.      Powers Regulatory Licensing Manager M. W. Rencheck W. H. Schalk D. G. Turner V907'200aie 990630 F PDR    ADQCK            050003i6
  .~t rf,SL f/'EP:
Arrrerica's Erregl Parlrrer
 
                                      .R.C. OPERATING DATA REPORT
                                          ~ ~
DOCKET NO.            50 - 316 DATE                  July 1, 1999 COMPLETED BY          M. M. Pratt TELEPHONE              616-465-5901 OPERATING STATUS                                                      Notes:
: 1. Unit Name                                    D. C. Cook Unit 2
: 2. Reporting Period                                      Jun-99
: 3. Licensed Thermal Power (MWt)                          3411
: 4. Name Plate Rating (Gross MWe)                          1133
: 5. Design Electrical Rating (Net MWe)                    1090
: 6. Maximum Dependable Capacity (GROSS MWe)                1100
: 7. Maximum Dependable Capacity (Net MWe)                  1060
: 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
: 9. Power Level to Which Restricted, If Any (Net MWe):
: 10. Reasons For Restrictions, If Any:
This Month            Year-to-Date                Cumulative
: 11. Hours in Reporting Period                      720.0                  4344.0                        188424.0
: 12. No. of Hrs. Reactor Was Critical                0.0                      0.0                        121771.0
: 13. Reactor Reserve Shutdown Hours                  0.0                      0.0                              0.0
: 14. Hours Generator on Line                          0.0                      0.0                        118153.4
: 15. Unit Reserve Shutdown Hours                      0.0                      0.0                              0.0
: 16. Gross Thermal Energy Gen. (MWH)                  0.0                      0.0                    366007650.4
: 17. Gross Electrical Energy Gen. (MWH)              0.0                      0.0                    118584640.0
: 18. Net Electrical Energy Gen. (MWH)                0.0                      0.0                    114257779 0
: 19. Unit Service Factor                              0.0                      0.0                            63.5
: 20. Unit Availability Factor                        0.0                      0.0                            63.5
: 21. Unit Capacity Factor (MDC Net)                  0.0                      0.0 57.8'6.3
: 22. Unit Capacity Factor (DER Net)                  0.0                      0.0
: 23. Unit Forced Outage Rate                        100.0                    100.0                          21.7
: 24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):
None
: 25. If Shut Down At End of Report Period, Estimated Date of Startup:
April 2000
: 26. Units in Test Status (Prior to Commercial Operation):
Forecast                Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION
 
DOCKET NO. 50 - 316 UNIT NAME      D.C. Cook Unit 2 DATE          July 1, 1999 COMPLETED BY  M. M. Pratt TELEPHONE      616-465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)
June 1999 DAY  AVERAGE DAILY                        DAY    AVERAGE DAILY POWER LEVEL                                POWER LEVEL 6/1/99                                    6/17/99 6/2/99                                    6/18/99 6/3/99                                    6/19/99 6/4/99                                    6/20/99 6/5/99                                    6/21/99 6/6/99                                    6/22/99 6/7/99                                    6/23/99 6/8/99                                    6/24/99 6/9/99                                    6/25/99 6/10/99                                    6/26/99 6/11/99                                    6/27/99 6/12/99                                    6/28/99 6/13/99                                    6/29/99 6/14/99                                    6/30/99 6/15/99 6/16/99
 
DOCKET NO.            50- 316 UNIT NAME              D.C. Cook Unit 2 DATE                  July 6, 1999 COMPLETED BY          S. A. Richardson TELEPHONE              616-465-5901 PAGE                    1 of1 MONTHLYOPERATING ACTIVITIES - June 1999 HIGHLIGHTS The unit entered this reporting period in Mode 5 at 0% RTP.
The unit exited this reporting period in Mode 5 at 0% RTP.
There were no challenges to the pressurizer safety valves or power operated relief valves.
Gross electrical generation for the month of June was 0 MWh.
DETAILS 06/01/99              The Reactor remains shutdown since 09/08/97 to resolve design basis questions identified during the NRC Architect and Engineering (AE) Inspection and subsequent Expanded System Readiness Reviews (ESRR).
All time entries are Eastern Standard Time (EST).
 
DOCKET NO.              50- 316 UNIT NAME              D.C. Cook Unit 2 DATE                    July 6, 1999 COMPLETED BY            S. A. Richardson TELEPHONE              616-465-5901 PAGE                    1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS June 1999, METHOD OF SHUTTING      LICENSEE DURATION                    DOWN          EVENT        SYSTEM    COMPONENT                CAUSE AND CORRECTIVE ACTION NO.      DATE  TYPE1    HOURS          REASON2    REACTOR3      REPORT NO. CODE4      CODE5                        TO PREVENT RECURRENCE 335    010798  F      720.0                                    NIA          NIA        NIA                The unit remained shutdown to resolve design basis questions discovered during the NRC Architect and Engineering (AE)
Inspection.
1 TYPE:              2 REASON:                              3 METHOD:                4 SYSTEM:                                    5 COMPONENT:
F: Forced            A: Equipment Failure (Explain)        1: Manual                Exhibit G - Instructions                    Exhibit I: Same Source S: Scheduled        B: Maintenance or Test                2: Manual Scram          for preparation of data C: Refueling                          3: Automatic Scram        entry sheets for Licensee D: Regulatory Restriction              4: Other (Explain)        Ev'ent Report (LER) File E: Operator Training and                                        (NUREG 0161)
License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain)
 
0 ~ ~
      ~ ~}}

Latest revision as of 06:33, 29 October 2019

Monthly Operating Rept for June 1999 for DC Cook Nuclear Plant,Unit 2.With 990709 Ltr
ML17326A051
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 06/30/1999
From: Bakken A, Pratt M
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9907200216
Download: ML17326A051 (8)


Text

REGULAT dY INFORMATION DISTRIBUTIO SYSTEM (RIDS)

-N DOCKET ¹ FACIL:50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana M 05000316

) AU~~H.NAME AUTHOR AFFILIATION PRATT,M.M. Indiana Michigan Power Co.

BAKKEN,A.C Indiana Michigan Power Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operatin ' June 1999 for DC Cook Nuclear Plant, Unit .With 990709 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES I REC 5'.I ENT COPIES ID CODE/NAME LTTR EiVCL ID CODE/NAME LTTR ENCL STANG,J 1 1 0 INTERNA . FILE CENTE 1 1 OC/DBA/PAD 1 1 S/DRXA OE 1 1 RGN3 1 1 EXTERNAL: LMITCO MARSHALL 1 1 NOAC 1 .1 NRC PDR 1 1 D

0 C

M

'E N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.*TO HAVE YOUR, NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATIONS CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 8 ENCL 8

0 rrl 4806 616 465 5901 FI ENEMAS NICNlCQN PQWM July 9, 1999 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Document Control Manager:

Pursuant to the requirements of Donald C; Cook Nuclear Piant Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for June 1999 is submitted.

Sincerely, A. Christopher Bakken, III Site Vice President ACB/bwo Attachment c: NRC Region III NRC Project Manager NRR NRC Resident Inspector ANI Nuclear Engineering Department INPO Records Center G. P. Arer t G. T. Gaffney Canton D. R. Hahn Department of Health S. Hamming Department of Labor G. John B. Lewis McGraw-Hill Companies D. H. Malin T. P. Noonan D. W. Paul Lancaster J. E. Pollock R. P. Powers Regulatory Licensing Manager M. W. Rencheck W. H. Schalk D. G. Turner V907'200aie 990630 F PDR ADQCK 050003i6

.~t rf,SL f/'EP:

Arrrerica's Erregl Parlrrer

.R.C. OPERATING DATA REPORT

~ ~

DOCKET NO. 50 - 316 DATE July 1, 1999 COMPLETED BY M. M. Pratt TELEPHONE 616-465-5901 OPERATING STATUS Notes:

1. Unit Name D. C. Cook Unit 2
2. Reporting Period Jun-99
3. Licensed Thermal Power (MWt) 3411
4. Name Plate Rating (Gross MWe) 1133
5. Design Electrical Rating (Net MWe) 1090
6. Maximum Dependable Capacity (GROSS MWe) 1100
7. Maximum Dependable Capacity (Net MWe) 1060
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Year-to-Date Cumulative

11. Hours in Reporting Period 720.0 4344.0 188424.0
12. No. of Hrs. Reactor Was Critical 0.0 0.0 121771.0
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator on Line 0.0 0.0 118153.4
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Gen. (MWH) 0.0 0.0 366007650.4
17. Gross Electrical Energy Gen. (MWH) 0.0 0.0 118584640.0
18. Net Electrical Energy Gen. (MWH) 0.0 0.0 114257779 0
19. Unit Service Factor 0.0 0.0 63.5
20. Unit Availability Factor 0.0 0.0 63.5
21. Unit Capacity Factor (MDC Net) 0.0 0.0 57.8'6.3
22. Unit Capacity Factor (DER Net) 0.0 0.0
23. Unit Forced Outage Rate 100.0 100.0 21.7
24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):

None

25. If Shut Down At End of Report Period, Estimated Date of Startup:

April 2000

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION

DOCKET NO. 50 - 316 UNIT NAME D.C. Cook Unit 2 DATE July 1, 1999 COMPLETED BY M. M. Pratt TELEPHONE 616-465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)

June 1999 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER LEVEL POWER LEVEL 6/1/99 6/17/99 6/2/99 6/18/99 6/3/99 6/19/99 6/4/99 6/20/99 6/5/99 6/21/99 6/6/99 6/22/99 6/7/99 6/23/99 6/8/99 6/24/99 6/9/99 6/25/99 6/10/99 6/26/99 6/11/99 6/27/99 6/12/99 6/28/99 6/13/99 6/29/99 6/14/99 6/30/99 6/15/99 6/16/99

DOCKET NO. 50- 316 UNIT NAME D.C. Cook Unit 2 DATE July 6, 1999 COMPLETED BY S. A. Richardson TELEPHONE 616-465-5901 PAGE 1 of1 MONTHLYOPERATING ACTIVITIES - June 1999 HIGHLIGHTS The unit entered this reporting period in Mode 5 at 0% RTP.

The unit exited this reporting period in Mode 5 at 0% RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross electrical generation for the month of June was 0 MWh.

DETAILS 06/01/99 The Reactor remains shutdown since 09/08/97 to resolve design basis questions identified during the NRC Architect and Engineering (AE) Inspection and subsequent Expanded System Readiness Reviews (ESRR).

All time entries are Eastern Standard Time (EST).

DOCKET NO. 50- 316 UNIT NAME D.C. Cook Unit 2 DATE July 6, 1999 COMPLETED BY S. A. Richardson TELEPHONE 616-465-5901 PAGE 1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS June 1999, METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE1 HOURS REASON2 REACTOR3 REPORT NO. CODE4 CODE5 TO PREVENT RECURRENCE 335 010798 F 720.0 NIA NIA NIA The unit remained shutdown to resolve design basis questions discovered during the NRC Architect and Engineering (AE)

Inspection.

1 TYPE: 2 REASON: 3 METHOD: 4 SYSTEM: 5 COMPONENT:

F: Forced A: Equipment Failure (Explain) 1: Manual Exhibit G - Instructions Exhibit I: Same Source S: Scheduled B: Maintenance or Test 2: Manual Scram for preparation of data C: Refueling 3: Automatic Scram entry sheets for Licensee D: Regulatory Restriction 4: Other (Explain) Ev'ent Report (LER) File E: Operator Training and (NUREG 0161)

License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)

0 ~ ~

~ ~