ML17332A254: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 07/31/1994
| issue date = 07/31/1994
| title = Monthly Operating Rept for Jul 1994 for DC Cook Nuclear Plant.W/940808 Ltr
| title = Monthly Operating Rept for Jul 1994 for DC Cook Nuclear Plant.W/940808 Ltr
| author name = BLIND A A, JANISSE J D
| author name = Blind A, Janisse J
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| addressee name =  
| addressee name =  
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:ACCELERATED RIDS PROCESSING)
{{#Wiki_filter:ACCELERATED RIDS PROCESSING)
REGULATORY INFORMATION DISTRIBUTXON SYSTEM (RIDS)ACCESSION NBR:9408220059 DOC.DATE: 94/07/31 NOTARIZED:
REGULATORY INFORMATION DISTRIBUTXON SYSTEM (RIDS)
No DOCKET FACIL:50-315 Donald C.Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 AUTH.NAME AUTHOR AFFXLIATION JANXSSE,J.D.
ACCESSION NBR:9408220059                 DOC.DATE: 94/07/31       NOTARIZED: No         DOCKET FACIL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana                       M 05000315 AUTH. NAME             AUTHOR AFFXLIATION JANXSSE,J.D.           Indiana Michigan Power           Co.   (formerly Indiana 6 Michigan Ele P BLXND,A;A.             Indiana Michigan Power           Co.   (formerly Indiana 6 Michigan Ele RECIP.NAME             RECIPIENT AFFILIATION R
Indiana Michigan Power Co.(formerly Indiana 6 Michigan Ele P BLXND,A;A.
Indiana Michigan Power Co.(formerly Indiana 6 Michigan Ele RECIP.NAME RECIPIENT AFFILIATION R  


==SUBJECT:==
==SUBJECT:==
Monthly operating rept for Jul 1994 for DC Cook Nuclear Plant.W/940808 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Spec~s NOTES: 0 RECIPIENT ID CODE/NAME PD3-1 PD INTERNAL: AEOD/DS P/TPAB NRR/DRI L/RPEB RGN3 EXTERNAL EGGG BRYCE I J~H NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME HXCKMAN,J RR/D-S OEAB REG FIGE 01 NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 D 0 C N NOTE To ALL"RIDS" RECIPIENTS:
Monthly operating rept               for Jul 1994   for DC Cook Nuclear Plant.W/940808 ltr.
PLEASE HELP US To REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT.504-2083)To ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS I'OR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10 Indiana Michigan Power Company Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 August 8, 1994 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.20555 Gentlemen:
DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR                       ENCL     SIZE:               0 TITLE: Monthly Operating Report (per Tech Spec~s NOTES:
Pursuant to the requirements of Donald C.Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of July 1994 is submitted.
RECIPIENT                  COPIES            RECIPIENT         COPIES ID CODE/NAME                LTTR ENCL        ID CODE/NAME       LTTR ENCL PD3-1 PD                       1    1      HXCKMAN,J              1    1 INTERNAL: AEOD/DS P/TPAB                     1    1      RR/D- S OEAB          1    1 NRR/DRI L/RPEB                   1    1      REG  FIGE      01    1    1 RGN3                             1    1 EXTERNAL   EGGG BRYCE I J ~ H               1     1     NOAC                   1     1 NRC PDR                          1     1 D
Respectfully,.A.Blind Plant Manager Attachment cr NRC Region III D.R.Hahn R.C.Callen S.Hamming J.G.Keppler INPO Records Center ANI Nuclear Engineering Department E.E.Fitzpatrick R.L.Simms W.G.Smith, Jr.S.J.Brewer D.W.Paul S.H.Steinhart J.L.Leichner J.A.Isom D.G.Turner E.A.Smarrella J.C.Krieger D.F.Krause M.E.Russo prhAQj g~4v~~8(graf 9408220059
0 C
'74073i PDR ADDCK 05000313 R PDR N.R.C.OPERATING DATA REPORT DOCKET NO.50-315 DATE 02/Aug/94 COMPLETED BY JD Janisse TELEPHONE 616-465-5901 OPERATING STATUS l.Unit Name D.C.Cook Unit 1 2.Reporting Period July notes 3.Licensed Thermal Power (MWt)3250 4.Name Plate Rating (Gross MWe)1152 5.Design Electrical Rating (Net HWe)1020 6.Maximum Dependable Capacity (GROSS HWe)1056 7.Maximum Dependable Capacity (Net HWe)1000 8.If Changes Occur in Capacity Ratings (Items no.3 through 7)Since Last Report Give Reasons 9.ower eve o ic estricte.ny et e 10.Reasons For Restrictions.
N NOTE To ALL"RIDS" RECIPIENTS:
If Any: ll.Hours in Reporting Period 12.No.of Hrs.Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator on Line 15.Unit Reserve Shutdown Hours 16.Gross Therm.Energy Gen.(HWH)17.Gross Elect.Energy Gen.(MWH)18.Net Elect.Energy Gen.(MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (HDC Net)22.Unit Capacity Factor (DER Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled over Next Six None is o.r.to ate 744.0 5088.0 744.0 2584.5 0.0 0.0 744.0 2547.1 0.0 0.0 2402696 6903109 765140 2190460 738097 2101539 100.0 50.1 100.0 50.1 99.2 41.3 97.3 , 40.5 0.0 0.0 Months (Type, Date,and UIMl.171648.0 128238.9 463.0 126155.7 321.0 370428884 120213120 115623337 74.4 74.4 67.1 65.3 5.9 Duration):
PLEASE HELP US To REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 504-2083 ) To ELIMINATEYOUR NAME FROM DISTRIBUTIONLISTS I'OR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR                   10   ENCL     10
25.ut own t n o eport erio , stimate ate o tartup: 26.nits in est tatus rior to ommercia INITIAL CRITICALITY INITIAL ELECTRICITY COMHERC IAL OPERATION peration: Forcast Achieved


AVERAGE DAILY POWER LEVEL (MWe-Net)MONTH DOCKET NO.50-315 UNIT ONE DATE 02/Aug/94 COMPLETED BY JD Janisse TELEPHONE 616-465-5901 July DAY 94/07/01 94/07/02 94/07/03 94/07/04 94/07/05 94/07/06 94/07/07 94/07/08 94/07/09 94/07/10 94/07/11 94/07/12 94/07/13 94/07/14 94/07/15 94/07/16 AVERAGE DAILY POWER LEVEL 996 999 999 995 994 988 985 985 1004 1002 1002 999 1001 1003 1004 1000 DAY 94/07/17 94/07/18 94/07/19 94/07/20 94/07/21 94/07/22 94/07/23 94/07/24 94/07/25" 94/07/26 94/07/27 94/07/28 94/07/29 94/07/30 94/07/31 AVERAGE DAILY POWER LEVEL 995 1002 1002 990 991 988 915 988 983 985 988 996 996 993 987
Indiana Michigan Power Company Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 August 8, 1994 U.S. Nuclear Regulatory Commission ATTN:        Document    Control Desk Washington, D.C.            20555 Gentlemen:
Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of July 1994 is submitted.
Respectfully,
        .A. Blind Plant Manager Attachment cr      NRC    Region D.R. Hahn III R.C. Callen S.        Hamming J.G. Keppler INPO Records      Center ANI Nuclear Engineering Department E.E. Fitzpatrick R.L. Simms W.G. Smith, Jr.
S.J. Brewer D.W. Paul S.H. Steinhart J.L. Leichner J.A. Isom D.G. Turner E.A. Smarrella J.C. Krieger D.F. Krause M.E. Russo prhAQj g~4v~~
8(graf 9408220059 '74073i PDR  ADDCK 05000313 R                        PDR


DOCKET UNIT NAME: COMPLETED BY: TELEPHONE:
N.R.C. OPERATING DATA REPORT DOCKET NO.        50-315 DATE 02/Aug/94 COMPLETED BY JD Janisse TELEPHONE 616-465-5901 OPERATING STATUS
DATE PAGE: 50-315 D.C.Cook Unit 1 D.L.Bublick (616)465-5901 August 4, 1994 Page 1 of 1 MONTHLY OPERATING ACTIVITIES
: l. Unit Name                  D. C. Cook  Unit  1
-JULY 1994 HIGHLIGHTS The unit entered this reporting period in Mode 1 at 99%RTP.The unit exited this reporting period in Mode 1 at 100%RTP.There were no challenges to the pressurizer safety valves or power operated relief valves.Gross Electrical generation for the month of July was 765140 MWH.DETAILS 7-22-94 7-23-94 2200 0300 1015 1640 Commenced reactor power reduction to 854 RTP for main turbine valve testing.Reactor power stabilized at 85~o RTP.Commenced power increase to 100%RTP.Reactor power stabilized at 1004 RTP.
: 2. Reporting Period                                  July notes
A UNZT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: JULY 1994 UNIT NAME: DATE: COMPLETED BY: TELEPHONE:
: 3. Licensed Thermal Power (MWt)                    3250
Page 1 of 1 D.C COOK UNIT 1 August 4, 1994~D.L.Bublic'k (616)465-5901 DURATZON NO DATE TYPES'OURS METHOD OF SHUTTING DOWN REASON~REACTOR~LICENSEE EVENT REPORT NO.SYSTEM CODE COMPONENT CODEs CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE None There were no unit shutdowns or~significant power reductions fron~100%RTP this month.1 F S Forced Scheduled 2 Reason: A: Equipment Failure (Explain)B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)H: Other (Explain)3 Method: 1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain)Exhibit G-Instructions for preparation of data entry sheets for Licensee Event Report (LER)File (NUREG 1061)5 Exhibit Z: Same Source}}
: 4. Name Plate Rating (Gross MWe)                  1152
: 5. Design Electrical Rating (Net HWe)              1020
: 6. Maximum Dependable Capacity (GROSS HWe) 1056
: 7. Maximum Dependable Capacity (Net HWe)          1000
: 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
: 9. ower eve      o    ic estricte .        ny    et    e
: 10. Reasons For Restrictions.      If  Any:
is    o. r. to    ate    UIMl.
ll. Hours    in Reporting Period                  744.0          5088.0    171648.0
: 12. No. of Hrs. Reactor Was Critical            744.0          2584.5    128238.9
: 13. Reactor Reserve Shutdown Hours                  0.0            0.0      463.0
: 14. Hours Generator on Line                      744.0          2547.1    126155.7
: 15. Unit Reserve Shutdown Hours                    0.0            0.0      321.0
: 16. Gross Therm. Energy Gen. (HWH)            2402696          6903109  370428884
: 17. Gross Elect. Energy Gen. (MWH)              765140        2190460  120213120
: 18. Net Elect. Energy Gen. (MWH)                738097        2101539  115623337
: 19. Unit  Service Factor                        100.0            50.1        74.4
: 20. Unit  Availability Factor                    100.0            50.1        74.4
: 21. Unit  Capacity Factor (HDC Net)              99.2            41.3        67.1
: 22. Unit  Capacity Factor (DER Net)              97.3    ,
40.5        65.3
: 23. Unit  Forced Outage Rate                      0.0            0.0          5.9
: 24. Shutdowns Scheduled over Next Six Months (Type, Date,and Duration):
None
: 25.        ut  own  t  n  o  eport  erio  ,  stimate      ate  o tartup:
: 26. nits in est      tatus  rior to  ommercia      peration    :
Forcast    Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMHERC IAL OPERATION
 
AVERAGE DAILY POWER LEVEL  (MWe-Net)
DOCKET NO.        50-315 UNIT                  ONE DATE         02/Aug/94 COMPLETED BY JD Janisse TELEPHONE  616-465-5901 MONTH          July AVERAGE DAILY                        AVERAGE DAILY DAY      POWER LEVEL            DAY          POWER LEVEL 94/07/01        996            94/07/17              995 94/07/02        999            94/07/18            1002 94/07/03        999            94/07/19            1002 94/07/04        995            94/07/20              990 94/07/05        994            94/07/21              991 94/07/06        988            94/07/22              988 94/07/07        985            94/07/23              915 94/07/08        985            94/07/24  "
988 94/07/09        1004            94/07/25              983 94/07/10        1002            94/07/26              985 94/07/11        1002            94/07/27              988 94/07/12        999            94/07/28              996 94/07/13        1001            94/07/29              996 94/07/14        1003            94/07/30              993 94/07/15        1004            94/07/31              987 94/07/16        1000
 
DOCKET            50-315 UNIT NAME:        D.C. Cook   Unit 1 COMPLETED BY:    D. L. Bublick TELEPHONE:        (616) 465-5901 DATE              August 4, 1994 PAGE:            Page 1 of 1 MONTHLY OPERATING ACTIVITIES   JULY 1994 HIGHLIGHTS The unit entered this reporting period in Mode 1 at 99% RTP.
The unit exited this reporting period in Mode 1 at 100% RTP.
There were no challenges to the pressurizer safety valves or     power operated relief valves.
Gross Electrical generation for the month of July   was 765140   MWH.
DETAILS 7-22-94       2200     Commenced reactor power reduction to 854   RTP   for main turbine valve testing.
7-23-94      0300      Reactor power stabilized at 85~o RTP.
1015      Commenced power increase to 100% RTP.
1640    Reactor power stabilized at 1004 RTP.
 
A UNZT SHUTDOWNS AND POWER REDUCTIONS                               UNIT NAME:       D. C COOK UNIT 1 DATE:            August 4, 1994   ~
REPORT MONTH: JULY  1994                                      COMPLETED BY:    D. L. Bublic'k TELEPHONE:      (616) 465-5901 Page 1 of  1 METHOD OF SHUTTING    LICENSEE DURATZON             DOWN        EVENT      SYSTEM COMPONENT    CAUSE AND CORRECTIVE ACTION NO   DATE   TYPES'OURS         REASON~   REACTOR~   REPORT NO. CODE   CODEs         TO PREVENT RECURRENCE None                                                                                 There were no unit shutdowns or significant power reductions fron~
100% RTP this month.
                                                                                                                          ~
1             2                                  3                                                5 F Forced     Reason:                             Method:            Exhibit G - Instructions      Exhibit Z:  Same S  Scheduled  A: Equipment Failure (Explain)     1: Manual          for preparation of data                    Source B: Maintenance or Test             2: Manual Scram    entry sheets for Licensee C: Refueling                       3: Automatic Scram Event Report (LER) File D: Regulatory Restriction         4: Other (Explain) (NUREG 1061)
E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain)}}

Latest revision as of 13:44, 22 October 2019

Monthly Operating Rept for Jul 1994 for DC Cook Nuclear Plant.W/940808 Ltr
ML17332A254
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 07/31/1994
From: Blind A, Janisse J
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9408220059
Download: ML17332A254 (9)


Text

ACCELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTXON SYSTEM (RIDS)

ACCESSION NBR:9408220059 DOC.DATE: 94/07/31 NOTARIZED: No DOCKET FACIL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 AUTH. NAME AUTHOR AFFXLIATION JANXSSE,J.D. Indiana Michigan Power Co. (formerly Indiana 6 Michigan Ele P BLXND,A;A. Indiana Michigan Power Co. (formerly Indiana 6 Michigan Ele RECIP.NAME RECIPIENT AFFILIATION R

SUBJECT:

Monthly operating rept for Jul 1994 for DC Cook Nuclear Plant.W/940808 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: 0 TITLE: Monthly Operating Report (per Tech Spec~s NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD3-1 PD 1 1 HXCKMAN,J 1 1 INTERNAL: AEOD/DS P/TPAB 1 1 RR/D- S OEAB 1 1 NRR/DRI L/RPEB 1 1 REG FIGE 01 1 1 RGN3 1 1 EXTERNAL EGGG BRYCE I J ~ H 1 1 NOAC 1 1 NRC PDR 1 1 D

0 C

N NOTE To ALL"RIDS" RECIPIENTS:

PLEASE HELP US To REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 504-2083 ) To ELIMINATEYOUR NAME FROM DISTRIBUTIONLISTS I'OR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

Indiana Michigan Power Company Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 August 8, 1994 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of July 1994 is submitted.

Respectfully,

.A. Blind Plant Manager Attachment cr NRC Region D.R. Hahn III R.C. Callen S. Hamming J.G. Keppler INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick R.L. Simms W.G. Smith, Jr.

S.J. Brewer D.W. Paul S.H. Steinhart J.L. Leichner J.A. Isom D.G. Turner E.A. Smarrella J.C. Krieger D.F. Krause M.E. Russo prhAQj g~4v~~

8(graf 9408220059 '74073i PDR ADDCK 05000313 R PDR

N.R.C. OPERATING DATA REPORT DOCKET NO. 50-315 DATE 02/Aug/94 COMPLETED BY JD Janisse TELEPHONE 616-465-5901 OPERATING STATUS

l. Unit Name D. C. Cook Unit 1
2. Reporting Period July notes
3. Licensed Thermal Power (MWt) 3250
4. Name Plate Rating (Gross MWe) 1152
5. Design Electrical Rating (Net HWe) 1020
6. Maximum Dependable Capacity (GROSS HWe) 1056
7. Maximum Dependable Capacity (Net HWe) 1000
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
9. ower eve o ic estricte . ny et e
10. Reasons For Restrictions. If Any:

is o. r. to ate UIMl.

ll. Hours in Reporting Period 744.0 5088.0 171648.0

12. No. of Hrs. Reactor Was Critical 744.0 2584.5 128238.9
13. Reactor Reserve Shutdown Hours 0.0 0.0 463.0
14. Hours Generator on Line 744.0 2547.1 126155.7
15. Unit Reserve Shutdown Hours 0.0 0.0 321.0
16. Gross Therm. Energy Gen. (HWH) 2402696 6903109 370428884
17. Gross Elect. Energy Gen. (MWH) 765140 2190460 120213120
18. Net Elect. Energy Gen. (MWH) 738097 2101539 115623337
19. Unit Service Factor 100.0 50.1 74.4
20. Unit Availability Factor 100.0 50.1 74.4
21. Unit Capacity Factor (HDC Net) 99.2 41.3 67.1
22. Unit Capacity Factor (DER Net) 97.3 ,

40.5 65.3

23. Unit Forced Outage Rate 0.0 0.0 5.9
24. Shutdowns Scheduled over Next Six Months (Type, Date,and Duration):

None

25. ut own t n o eport erio , stimate ate o tartup:
26. nits in est tatus rior to ommercia peration  :

Forcast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMHERC IAL OPERATION

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO. 50-315 UNIT ONE DATE 02/Aug/94 COMPLETED BY JD Janisse TELEPHONE 616-465-5901 MONTH July AVERAGE DAILY AVERAGE DAILY DAY POWER LEVEL DAY POWER LEVEL 94/07/01 996 94/07/17 995 94/07/02 999 94/07/18 1002 94/07/03 999 94/07/19 1002 94/07/04 995 94/07/20 990 94/07/05 994 94/07/21 991 94/07/06 988 94/07/22 988 94/07/07 985 94/07/23 915 94/07/08 985 94/07/24 "

988 94/07/09 1004 94/07/25 983 94/07/10 1002 94/07/26 985 94/07/11 1002 94/07/27 988 94/07/12 999 94/07/28 996 94/07/13 1001 94/07/29 996 94/07/14 1003 94/07/30 993 94/07/15 1004 94/07/31 987 94/07/16 1000

DOCKET 50-315 UNIT NAME: D.C. Cook Unit 1 COMPLETED BY: D. L. Bublick TELEPHONE: (616) 465-5901 DATE August 4, 1994 PAGE: Page 1 of 1 MONTHLY OPERATING ACTIVITIES JULY 1994 HIGHLIGHTS The unit entered this reporting period in Mode 1 at 99% RTP.

The unit exited this reporting period in Mode 1 at 100% RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross Electrical generation for the month of July was 765140 MWH.

DETAILS 7-22-94 2200 Commenced reactor power reduction to 854 RTP for main turbine valve testing.

7-23-94 0300 Reactor power stabilized at 85~o RTP.

1015 Commenced power increase to 100% RTP.

1640 Reactor power stabilized at 1004 RTP.

A UNZT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME: D. C COOK UNIT 1 DATE: August 4, 1994 ~

REPORT MONTH: JULY 1994 COMPLETED BY: D. L. Bublic'k TELEPHONE: (616) 465-5901 Page 1 of 1 METHOD OF SHUTTING LICENSEE DURATZON DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO DATE TYPES'OURS REASON~ REACTOR~ REPORT NO. CODE CODEs TO PREVENT RECURRENCE None There were no unit shutdowns or significant power reductions fron~

100% RTP this month.

~

1 2 3 5 F Forced Reason: Method: Exhibit G - Instructions Exhibit Z: Same S Scheduled A: Equipment Failure (Explain) 1: Manual for preparation of data Source B: Maintenance or Test 2: Manual Scram entry sheets for Licensee C: Refueling 3: Automatic Scram Event Report (LER) File D: Regulatory Restriction 4: Other (Explain) (NUREG 1061)

E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)