{{#Wiki_filter:CATEGORY j.REGULAT Y INFORMATION DISTRIBUTIO YSTEM (RIDS)l ACCESSION NBR:9811170290 DOC.DATE: 98/10/31 NOTARIZED:
{{#Wiki_filter:CATEGORY j.
NO DOCKET I FACIL:50-315 Donald C.Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 AUTH:~~22kE
REGULAT   Y INFORMATION DISTRIBUTIO         YSTEM (RIDS) l ACCESSION NBR:9811170290           DOC.DATE:   98/10/31     NOTARIZED: NO               DOCKET       I FACIL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana                     M 05000315 AUTH:~~22kE .         AUTHOR'AFFILIATION MINOR,J.W.         ,   American Electric Power Co.,       Inc.
.AUTHOR'AFFILIATION MINOR,J.W.
CENTER,J.'F.           American Electric Power Co.,       Inc.
, American Electric Power Co., Inc.CENTER,J.'F.
COOPER,D.E.             American Electric Power Co.,       Inc.
American Electric Power Co., Inc.COOPER,D.E.
RECIP.NAME             RECIPIENT AFFILIATION
American Electric Power Co., Inc.RECIP.NAME RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating rept for Oct 1998 for DC Cook Nuclear Plant, Unit 1.With 981105 ltr.A DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: E RECIPIENT ID CODE/NAME PD3-3 PD INTERNAL: AEOD/SPD/RRAB OC/DBA/PAD EXTERNAL: LITCO BRYCE,J H NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME STANG,J-EIGEKTZM RGN3 NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 D'N NOTE TO ALL"RIDS" RECIPIENTS:
Monthly operating rept for Oct 1998 for             DC Cook   Nuclear Plant, Unit 1.With 981105         ltr.                                                     A DISTRIBUTION CODE: IE24D         COPIES RECEIVED:LTR           ENCL       SIZE:
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS'R REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9 American Electric Po~Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.20555 November 5, 1998 Gentlemen, Pursuant to the requirements of Donald C.Cook Nuclear Plant Unit 1 Technical SpeciTication 6.9.1.8, the attached Monthly Operating Report for the month of October 1998 is submitted.
TITLE: Monthly Operating Report (per Tech Specs)
Sincer ly, ooper Plant Manager Ijc Attachment NRC Region III INPO Records Center ANI Nuclear Engineering Department D.R.Hahn S.Hamming B.Lewis R.P.Powers J.R.Sampson B.L.Bartlett P.A.Barrett J.B.Kingseed D.W.Paul D.L.Noble W.H.Schalk D.G.Turner G.John D.P.Lynch R.G.Pickard G.T.Gaffney 98iii70290 98i03i PDR ADOCK 05000Si5 R PDR  
E NOTES:
~I I 1'I 1 DOCKET NO.DATE COMPLETED BY TELEPHONE 50-315 November 5, 1998 JW Minor 616-465-5901 D.C OPERATING STATUS 1.Unit Name 2.Reporting Period 3.Licensed Thermal Power (MWt)4.Name Plate Rating (Gross MWe)5.Design Electrical Rating (Net MWe)6.Maximum Dependable Capacity (GROSS MWe)7.Maximum Dependable Capacity (Net MWe)Cook Unit1 Oct-98 3250 1152 1020 1056 1000 Notes: 8.If Changes Occur in Capacity Ratings (Items no.3 through 7)Since Last Report Give Reasons: 9.Power Level To Which Restricted, If Any (Net Mwe): 10.Reasons For Restrictions, If Any: 11.Hours in Reporting Period 12.No.of Hrs.Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator on Line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Gen.(MWH)17.Gross Electrical Energy Gen.(MWH)18.Net Electrical Energy Gen.(MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (MDC Net)22.Unit Capacity Factor (DER Net)23.Unit Forced Outage Rate This Month 744.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Year-to-Date 7296.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Cumulative 208920.0 151285.3 463.0 148821.1 321.0 440194814.0 143013940.0 137597640.0 71.9 71.9 65.6 64.0 1 1.5 24.Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):
RECIPIENT          COPIES              RECIPIENT           COPIES ID  CODE/NAME        LTTR ENCL          ID CODE/NAME         LTTR ENCL PD3-3 PD                 1      1      STANG,J                  1      1 INTERNAL: AEOD/SPD/RRAB               1      1        -  EIGEKTZM            1      1 OC/DBA/PAD               1      1      RGN3                      1      1 EXTERNAL: LITCO BRYCE,J H             1     1       NOAC                      1     1 NRC PDR                  1     1 D
None 25.If Shut Down At End of Report Period, Estimated Date of Startup: To be Determined.
                                                                                                          'N NOTE TO ALL "RIDS" RECIPIENTS:
26.Units in Test Status (Prior to Commercial Operation):
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS'R REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR                 9   ENCL     9
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Forecast Achieved DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE 50-315 D.C.Cook Unit1 November 5, 1998 JW Minor 616-465-5901 AVERAGE DAILY POWER LEVEL (MWe-Net)October 1998 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 10/1/98 10/2/98 10/3/98 10/4/98 10/5/98 10/6/98 10/7/98 10/8/98 10/9/98 10/10/98 10/11/98 10/12/98 10/13/98 10/14/98 10/15/98 10/16/98 10/17/98 10/18/98 10/1 9/98 10/20/98 10/21/98 10/22/98 10/23/98 10/24/98 10/25/98 10/26/98 10/27/98 10/28/98 10/29/98 10/30/98 10/31/98 DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-315 D.C.Cook Unit 1 November 5, 1998 JF Center 616-697-5098 1 of1 MONTHLY OPERATING ACTIVITIES
 
-October 1998 HIGHLIGHTS The unit entered this reporting period in Mode 5 at 0%RTP.The unit exited this reporting period in Mode 5 at 0%RTP.There were no challenges to the pressurizer safety valves or power operated relief valves.Gross electrical generation for the month of October was 0 MWh.DETAILS 10/01/98 The Reactor was shutdown 09/08/97 to resolve design basis questions discovered during the NRC Architect and Engineering (AE)Inspection.
American Electric Po~
'll times are in Eastern Standard Time (EST).
Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 November 5, 1998 Gentlemen, Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 Technical SpeciTication 6.9.1.8, the attached Monthly Operating Report for the month of October 1998 is submitted.
DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-315 D.C.Cook Unit 1 November 5, 1998 JF Center.616-697-5098 1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS
Sincer ly, ooper Plant Manager Ijc Attachment NRC Region III INPO Records Center ANI Nuclear Engineering Department D.R. Hahn S. Hamming B. Lewis R.P. Powers J.R. Sampson B.L. Bartlett P.A. Barrett J.B. Kingseed D.W. Paul D.L. Noble W.H. Schalk D.G. Turner G. John D.P. Lynch R.G. Pickard G.T. Gaffney 98iii70290 98i03i 05000Si5 PDR   ADOCK R                         PDR
-October 1998 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT NO.DATE TYPE" HOURS REASON2 REACTOR3 REPORT NO.CODE4 CODE5 CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE 333 090897 F 720.0 97-010 97-011 97-012 97-013 97-014 97-016 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A The unit was shutdown to resolve design basis questions discovered during the NRC Architect and Engineering (AE)Inspection.
 
1 TYPE: F: Forced S: Scheduled 2 REASON: A: Equipment Failure (Explain)B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)H: Other (Explain)3 METHOD: 1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain)4 SYSTEM: Exhibit G-Instructions for preparation of data entry sheets for Licensee Event Report (LER)File (NUREG 0161)5 COMPONENT:
      ~ I I
Exhibit I: Same Source aQ El}}
1'I 1
 
DOCKET NO.             50- 315 DATE                  November 5, 1998 COMPLETED BY          JW Minor TELEPHONE              616-465-5901 OPERATING STATUS                                                     Notes:
: 1. Unit Name                                   D. C Cook Unit1
: 2. Reporting Period                                     Oct-98
: 3. Licensed Thermal Power (MWt)                         3250
: 4. Name Plate Rating (Gross MWe)                         1152
: 5. Design Electrical Rating (Net MWe)                   1020
: 6. Maximum Dependable Capacity (GROSS MWe)               1056
: 7. Maximum Dependable Capacity (Net MWe)                 1000
: 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
: 9. Power Level To Which Restricted, If Any (Net Mwe):
: 10. Reasons For Restrictions, If Any:
This Month              Year-to-Date              Cumulative
: 11. Hours in Reporting Period                     744.0                  7296.0                  208920.0
: 12. No. of Hrs. Reactor Was Critical                 0.0                      0.0                  151285.3
: 13. Reactor Reserve Shutdown Hours                   0.0                      0.0                    463.0
: 14. Hours Generator on Line                         0.0                      0.0                  148821.1
: 15. Unit Reserve Shutdown Hours                     0.0                      0.0                    321.0
: 16. Gross Thermal Energy Gen. (MWH)                 0.0                      0.0                440194814.0
: 17. Gross Electrical Energy Gen. (MWH)               0.0                      0.0                143013940.0
: 18. Net Electrical Energy Gen. (MWH)                 0.0                      0.0                137597640.0
: 19. Unit Service Factor                             0.0                      0.0                      71.9
: 20. Unit Availability Factor                         0.0                      0.0                      71.9
: 21. Unit Capacity Factor (MDC Net)                   0.0                      0.0                      65.6
: 22. Unit Capacity Factor (DER Net)                   0.0                     0.0                     64.0
: 23. Unit Forced Outage Rate                        100.0                     100.0                     1 1.5
: 24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):
None
: 25. If Shut Down At End of Report Period, Estimated Date of Startup:
To be Determined.
: 26. Units in Test Status (Prior to Commercial Operation):
Forecast                Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
 
DOCKET NO. 50- 315 UNIT NAME      D.C. Cook Unit1 DATE          November 5, 1998 COMPLETED BY  JW Minor TELEPHONE      616-465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)
October 1998 DAY    AVERAGE DAILY                        DAY    AVERAGE DAILY POWER LEVEL                                  POWER LEVEL 10/1/98                                    10/17/98 10/2/98                                    10/18/98 10/3/98                                    10/1 9/98 10/4/98                                    10/20/98 10/5/98                                    10/21/98 10/6/98                                    10/22/98 10/7/98                                    10/23/98 10/8/98                                    10/24/98 10/9/98                                    10/25/98 10/10/98                                    10/26/98 10/11/98                                    10/27/98 10/12/98                                    10/28/98 10/13/98                                    10/29/98 10/14/98                                    10/30/98 10/15/98                                    10/31/98 10/16/98
 
DOCKET NO.              50-315 UNIT NAME              D.C. Cook Unit 1 DATE                    November 5, 1998 COMPLETED BY          JF Center TELEPHONE              616-697-5098 PAGE                    1 of1 MONTHLYOPERATING ACTIVITIES - October 1998 HIGHLIGHTS The unit entered this reporting period in Mode 5 at 0% RTP.
The unit exited this reporting period in Mode 5 at 0% RTP.
There were no challenges to the pressurizer safety valves or power operated relief valves.
Gross electrical generation for the month of October was 0 MWh.
DETAILS 10/01/98                             The Reactor was shutdown 09/08/97 to resolve design basis questions discovered during the NRC Architect and Engineering (AE) Inspection.
'll  times are in Eastern Standard Time (EST).
 
DOCKET NO.             50- 315 UNIT NAME               D.C. Cook Unit 1 DATE                    November 5, 1998 COMPLETED BY            JF Center.
TELEPHONE                616-697-5098 PAGE                    1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS - October 1998 METHOD OF SHUTTING      LICENSEE DURATION                    DOWN          EVENT        SYSTEM    COMPONENT                CAUSE AND CORRECTIVE ACTION NO. DATE  TYPE"    HOURS          REASON2    REACTOR3      REPORT NO. CODE4      CODE5                        TO PREVENT RECURRENCE 333    090897  F      720.0                                     97-010      N/A        N/A                The unit was shutdown to resolve design 97-011      N/A        N/A                basis questions discovered during the NRC 97-012      N/A        N/A                Architect and Engineering (AE) Inspection.
97-013      N/A        N/A 97-014      N/A        N/A 97-016      N/A        N/A 1 TYPE:            2 REASON:                              3 METHOD:                4 SYSTEM:                                    5 COMPONENT:
F: Forced          A: Equipment Failure (Explain)          1: Manual                Exhibit G - Instructions                    Exhibit I: Same Source S: Scheduled        B: Maintenance or Test                2: Manual Scram          for preparation of data C: Refueling                          3: Automatic Scram        entry sheets for Licensee D: Regulatory Restriction              4: Other (Explain)        Event Report (LER) File E: Operator Training and                                        (NUREG 0161)
License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain)
 
aQ El}}

Latest revision as of 11:59, 22 October 2019

Monthly Operating Rept for Oct 1998 for DC Cook Nuclear Plant,Unit 1.With 981105 Ltr
ML17335A333
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 10/31/1998
From: Center J, Cooper D, Minor J
AMERICAN ELECTRIC POWER CO., INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9811170290
Download: ML17335A333 (8)


Text

CATEGORY j.

REGULAT Y INFORMATION DISTRIBUTIO YSTEM (RIDS) l ACCESSION NBR:9811170290 DOC.DATE: 98/10/31 NOTARIZED: NO DOCKET I FACIL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 AUTH:~~22kE . AUTHOR'AFFILIATION MINOR,J.W. , American Electric Power Co., Inc.

CENTER,J.'F. American Electric Power Co., Inc.

COOPER,D.E. American Electric Power Co., Inc.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Oct 1998 for DC Cook Nuclear Plant, Unit 1.With 981105 ltr. A DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

E NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD3-3 PD 1 1 STANG,J 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 - EIGEKTZM 1 1 OC/DBA/PAD 1 1 RGN3 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

'N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS'R REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9

American Electric Po~

Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 November 5, 1998 Gentlemen, Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 Technical SpeciTication 6.9.1.8, the attached Monthly Operating Report for the month of October 1998 is submitted.

Sincer ly, ooper Plant Manager Ijc Attachment NRC Region III INPO Records Center ANI Nuclear Engineering Department D.R. Hahn S. Hamming B. Lewis R.P. Powers J.R. Sampson B.L. Bartlett P.A. Barrett J.B. Kingseed D.W. Paul D.L. Noble W.H. Schalk D.G. Turner G. John D.P. Lynch R.G. Pickard G.T. Gaffney 98iii70290 98i03i 05000Si5 PDR ADOCK R PDR

~ I I

1'I 1

DOCKET NO. 50- 315 DATE November 5, 1998 COMPLETED BY JW Minor TELEPHONE 616-465-5901 OPERATING STATUS Notes:

1. Unit Name D. C Cook Unit1
2. Reporting Period Oct-98
3. Licensed Thermal Power (MWt) 3250
4. Name Plate Rating (Gross MWe) 1152
5. Design Electrical Rating (Net MWe) 1020
6. Maximum Dependable Capacity (GROSS MWe) 1056
7. Maximum Dependable Capacity (Net MWe) 1000
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
9. Power Level To Which Restricted, If Any (Net Mwe):
10. Reasons For Restrictions, If Any:

This Month Year-to-Date Cumulative

11. Hours in Reporting Period 744.0 7296.0 208920.0
12. No. of Hrs. Reactor Was Critical 0.0 0.0 151285.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 463.0
14. Hours Generator on Line 0.0 0.0 148821.1
15. Unit Reserve Shutdown Hours 0.0 0.0 321.0
16. Gross Thermal Energy Gen. (MWH) 0.0 0.0 440194814.0
17. Gross Electrical Energy Gen. (MWH) 0.0 0.0 143013940.0
18. Net Electrical Energy Gen. (MWH) 0.0 0.0 137597640.0
19. Unit Service Factor 0.0 0.0 71.9
20. Unit Availability Factor 0.0 0.0 71.9
21. Unit Capacity Factor (MDC Net) 0.0 0.0 65.6
22. Unit Capacity Factor (DER Net) 0.0 0.0 64.0
23. Unit Forced Outage Rate 100.0 100.0 1 1.5
24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):

None

25. If Shut Down At End of Report Period, Estimated Date of Startup:

To be Determined.

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

DOCKET NO. 50- 315 UNIT NAME D.C. Cook Unit1 DATE November 5, 1998 COMPLETED BY JW Minor TELEPHONE 616-465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)

October 1998 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER LEVEL POWER LEVEL 10/1/98 10/17/98 10/2/98 10/18/98 10/3/98 10/1 9/98 10/4/98 10/20/98 10/5/98 10/21/98 10/6/98 10/22/98 10/7/98 10/23/98 10/8/98 10/24/98 10/9/98 10/25/98 10/10/98 10/26/98 10/11/98 10/27/98 10/12/98 10/28/98 10/13/98 10/29/98 10/14/98 10/30/98 10/15/98 10/31/98 10/16/98

DOCKET NO. 50-315 UNIT NAME D.C. Cook Unit 1 DATE November 5, 1998 COMPLETED BY JF Center TELEPHONE 616-697-5098 PAGE 1 of1 MONTHLYOPERATING ACTIVITIES - October 1998 HIGHLIGHTS The unit entered this reporting period in Mode 5 at 0% RTP.

The unit exited this reporting period in Mode 5 at 0% RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross electrical generation for the month of October was 0 MWh.

DETAILS 10/01/98 The Reactor was shutdown 09/08/97 to resolve design basis questions discovered during the NRC Architect and Engineering (AE) Inspection.

'll times are in Eastern Standard Time (EST).

DOCKET NO. 50- 315 UNIT NAME D.C. Cook Unit 1 DATE November 5, 1998 COMPLETED BY JF Center.

TELEPHONE 616-697-5098 PAGE 1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS - October 1998 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE" HOURS REASON2 REACTOR3 REPORT NO. CODE4 CODE5 TO PREVENT RECURRENCE 333 090897 F 720.0 97-010 N/A N/A The unit was shutdown to resolve design 97-011 N/A N/A basis questions discovered during the NRC 97-012 N/A N/A Architect and Engineering (AE) Inspection.97-013 N/A N/A 97-014 N/A N/A 97-016 N/A N/A 1 TYPE: 2 REASON: 3 METHOD: 4 SYSTEM: 5 COMPONENT:

F: Forced A: Equipment Failure (Explain) 1: Manual Exhibit G - Instructions Exhibit I: Same Source S: Scheduled B: Maintenance or Test 2: Manual Scram for preparation of data C: Refueling 3: Automatic Scram entry sheets for Licensee D: Regulatory Restriction 4: Other (Explain) Event Report (LER) File E: Operator Training and (NUREG 0161)

License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)

aQ El