{{#Wiki_filter:'ecember 21, 1979 ENNESSEE VALLEY AUTHOR Y CHATTANOOGA.
{{#Wiki_filter:ENNESSEE VALLEY AUTHOR Y CHATTANOOGA. TENNESSEE ST401 716 Edney   Building
TENNESSEE ST401 716 Edney Building Mr.James.O'Reilly, Director U.S.Hucl egul tory Commission Office of Inspecti n and Enforcement Region IX 101 Marietta St et, Suite 3100 Atlanta, Georgia 30303 Dear Mr OtReilly I TENNESSEE VALLEY AUTHORITY-BROMNS PERRY NUCLEAR PLANT UNIT 3-DOCKET HO.50-296-PACILIXY OPERATING LICENSE DPB;68-REPORTABLE OCCURMrNCE REPORT BPRO-50-296/7921
'ecember 21,    1979 Mr. James   . O'Reilly, Director U.S. Hucl       egul tory Commission Office of Inspecti n and Enforcement Region IX 101 Marietta St et, Suite     3100 Atlanta, Georgia 30303 Dear Mr OtReilly I
/The enclosed report provides details concerning the differentia1 pressure between the dryvell and pressure suppression chamber which could not be maintained at greater than 1.3 psig trith unit 3 at 200 Kfe following unit return to service follo1rlng refueling outage.This report iS submitted in accordance with Brogans Perry unit 3 Technical Specification 6.7.2.a.3.
TENNESSEE VALLEY AUTHORITY     - BROMNS PERRY NUCLEAR PLANT UNIT 3     -   DOCKET HO. 50-296                                               -
Very'ruly yours, TENNESSEE VALLEY AUTHORITY J.R.Calhoun Director of Nuclear Power Enclosure (3)cc (Enclosure):
PACILIXY OPERATING LICENSE DPB;68 REPORTABLE OCCURMrNCE REPORT BPRO-50-296/7921                                                 /
Director (3)p Office of Management Infoxmation and Program Control U.S.Nuclear Regulatory Commissi n washington, DC 20555 Mrectox (40)Office of Inspection and Enforcement U.S.Nuclear Regulatory Commission llashington, DC 20555 R.P.Sullivan, NRC Inspector, Brogans Perry/co>i/i An Equal Opportunity Employer es~saso 90  
The enclosed report provides details concerning the differentia1 pressure between the dryvell and pressure suppression chamber which could not be maintained at greater than 1.3 psig       trith unit 3 at 200 Kfe following unit return to service follo1rlng refueling outage. This report iS submitted in accordance with Brogans Perry unit 3 Technical Specification 6.7.2.a.3.
~'~l>>Cg',>>4 i>>It r, 4't r>>e.>>I>>L~''V cl~I Ct 4 4-~l>>~+tt'f'I~I>>" I>>I Il r~'I J', ll P December 21, 1979~~TENNESSEE VAL.LEY AUTHGR/TY CHATTANOOGA.
Very'ruly yours, TENNESSEE VALLEY AUTHORITY J. R. Calhoun Director of Nuclear   Power Enclosure (3) cc (Enclosure):
TENNESSEE 37AQs.716 Edney Building Hr.James.O'Reilly, Director U.S.Nucle egul tory Commission Office of Inspecti n and Enforcement Region IX 101 Marietta St et, Suite 3100 Atlanta, Georgia 30303
Director (3)                                           p Office of Management Infoxmation       and Program   Control U.S. Nuclear Regulatory Commissi n washington, DC 20555 Mrectox (40)
Office of Inspection   and Enforcement U.S. Nuclear Regulatory Commission llashington, DC   20555 R. P. Sullivan, NRC Inspector,   Brogans   Perry
                                                                              /co>
i/i An Equal Opportunity Employer             es~saso       90


==Dear 1fr.O'Reilly:==
~'
TEN1KSSEE VALLEY AUTHORITY-BROWNS FERRY NUCLEAR PLANT UNIT 3-DOCKET NO.50-296-FACILITY OPERATING LICENSE DPR-68-REPORTABLE OCCURRIBiCE REPORT BFRO-50-296/7921 The enclosed report provides details concerning the differential pressure between the drywell and pressure suppression chamber which could not be maintained at greater than 1.3 psig with unit 3 at 200 Mfe following unit return to service following refueling outage.This report.is submitted in accordance with Browns Ferry unit 3 Technical Specification 6.7.2.a.3.
                ~ l>>
Very truly yours, TENNESSEE VALLEY AUTHORITY J.R.Calhoun Director of Nuclear Power Enclosure (3)cc (Enclosure):
Cg      ',  >>        4 i>>
Director (3)Office of i~fanagement Information and Program Control U.S.Nuclear Regulatory Commissi n Washington, DC 20555 Director (40)Office of Inspection and Enforcement U.S.Nuclear Regulatory Commission Washington, DC 20555 R.F.Sullivan, NRC Inspector, Browns Ferry QQbk S i!(}}
It r, 4 't r>>e.>>            >>L I                      ~
                                                                  ''V 4
Ct cl ~                      4-I
                                              ~  l  >> ~    +  tt
                                        'f            'I
                                            ~    I>>"
I      Il
                                          ',
r
                                              ~ 'I I>>
J            ll P
 
                    ~                                  ~
TENNESSEE VAL.LEY AUTHGR/TY CHATTANOOGA. TENNESSEE 37AQs  .
716 Edney  Building December 21, 1979 Hr. James    . O'Reilly, Director U.S. Nucle      egul tory Commission Office of Inspecti n and Enforcement Region IX 101 Marietta St et, Suite      3100 Atlanta, Georgia 30303
 
==Dear 1fr. O'Reilly:==
 
TEN1KSSEE VALLEY AUTHORITY     - BROWNS FERRY NUCLEAR PLANT UNIT 3 DOCKET NO. 50-296   - FACILITY OPERATING LICENSE DPR-68   - REPORTABLE OCCURRIBiCE REPORT   BFRO-50-296/7921 The enclosed report provides details concerning the differential pressure between the drywell and pressure suppression chamber which could not be maintained at greater than 1.3 psig with unit 3 at 200 Mfe following unit return to service following refueling outage. This report. is submitted   in accordance with Browns Ferry unit 3 Technical Specification 6.7.2.a.3.
Very truly yours, TENNESSEE VALLEY AUTHORITY J. R. Calhoun Director of Nuclear   Power Enclosure (3) cc (Enclosure):
Director (3)
Office of i~fanagement Information   and Program Control U.S. Nuclear Regulatory Commissi n Washington, DC 20555 Director (40)
Office of Inspection   and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 R. F. Sullivan, NRC Inspector, Browns Ferry QQbk S
i!(}}

Revision as of 01:55, 22 October 2019

Forwards LER 79-021/01T-0
ML18024B194
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 12/21/1979
From: Calhoun J
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML18024B195 List:
References
NUDOCS 7912280503
Download: ML18024B194 (4)


Text

ENNESSEE VALLEY AUTHOR Y CHATTANOOGA. TENNESSEE ST401 716 Edney Building

'ecember 21, 1979 Mr. James . O'Reilly, Director U.S. Hucl egul tory Commission Office of Inspecti n and Enforcement Region IX 101 Marietta St et, Suite 3100 Atlanta, Georgia 30303 Dear Mr OtReilly I

TENNESSEE VALLEY AUTHORITY - BROMNS PERRY NUCLEAR PLANT UNIT 3 - DOCKET HO. 50-296 -

PACILIXY OPERATING LICENSE DPB;68 REPORTABLE OCCURMrNCE REPORT BPRO-50-296/7921 /

The enclosed report provides details concerning the differentia1 pressure between the dryvell and pressure suppression chamber which could not be maintained at greater than 1.3 psig trith unit 3 at 200 Kfe following unit return to service follo1rlng refueling outage. This report iS submitted in accordance with Brogans Perry unit 3 Technical Specification 6.7.2.a.3.

Very'ruly yours, TENNESSEE VALLEY AUTHORITY J. R. Calhoun Director of Nuclear Power Enclosure (3) cc (Enclosure):

Director (3) p Office of Management Infoxmation and Program Control U.S. Nuclear Regulatory Commissi n washington, DC 20555 Mrectox (40)

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission llashington, DC 20555 R. P. Sullivan, NRC Inspector, Brogans Perry

/co>

i/i An Equal Opportunity Employer es~saso 90

~'

~ l>>

Cg ', >> 4 i>>

It r, 4 't r>>e.>> >>L I ~

V 4

Ct cl ~ 4-I

~ l >> ~ + tt

'f 'I

~ I>>"

I Il

',

r

~ 'I I>>

J ll P

~ ~

TENNESSEE VAL.LEY AUTHGR/TY CHATTANOOGA. TENNESSEE 37AQs .

716 Edney Building December 21, 1979 Hr. James . O'Reilly, Director U.S. Nucle egul tory Commission Office of Inspecti n and Enforcement Region IX 101 Marietta St et, Suite 3100 Atlanta, Georgia 30303

Dear 1fr. O'Reilly:

TEN1KSSEE VALLEY AUTHORITY - BROWNS FERRY NUCLEAR PLANT UNIT 3 DOCKET NO. 50-296 - FACILITY OPERATING LICENSE DPR-68 - REPORTABLE OCCURRIBiCE REPORT BFRO-50-296/7921 The enclosed report provides details concerning the differential pressure between the drywell and pressure suppression chamber which could not be maintained at greater than 1.3 psig with unit 3 at 200 Mfe following unit return to service following refueling outage. This report. is submitted in accordance with Browns Ferry unit 3 Technical Specification 6.7.2.a.3.

Very truly yours, TENNESSEE VALLEY AUTHORITY J. R. Calhoun Director of Nuclear Power Enclosure (3) cc (Enclosure):

Director (3)

Office of i~fanagement Information and Program Control U.S. Nuclear Regulatory Commissi n Washington, DC 20555 Director (40)

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 R. F. Sullivan, NRC Inspector, Browns Ferry QQbk S