{{#Wiki_filter:ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM RECIPIENT ID CODE/NAME PD INTERNAL: ACRS AEOD/DE I I B DEDRO NRR SHANKMAN, S NRR/DOEA DIR'11 NRR/DRIS/DIR NRR/PMAS/I LRB12 0 REG FILE 02 COPIES LTTR ENCL 2.2 1 1 1 1 1 1 1 1 1'1 1 1 1 1 1 RECIPIENT ID CODE/NAME ROSS,T.AEOD AEOD/TPAD NRR MORISSEAU F D NRR/DLPQ/LPEB10 NRR/DREP/PEPB9D NRR/DST/DIR 8E2 NUDOCS-ABSTRACT OGC/HDS2" RGN2 FILE 01 COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1'1 1 1 1 1 1 1<<I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ESSION NBR:9008150281 DOC.DATE: 90/08/14 NOTARIZED:
{{#Wiki_filter:ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM
NO CIL:50-259 Browns Ferry Nuclear Power Station, Unit 1, Tennessee 50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 50-296 Browns Ferry Nuclear Power Station, Unit 3, Tennessee AUTH.NAME AUTHOR AFFILIATION MEDFORD,M.O.
<<I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
ESSION NBR:9008150281               DOC.DATE: 90/08/14   NOTARIZED: NO           DOCKET  N CIL:50-259 Browns Ferry Nuclear Power Station, Unit 1, Tennessee                 05000259 50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee                 05000260 50-296 Browns Ferry Nuclear Power Station, Unit 3, Tennessee                 05000296 AUTH. NAME             AUTHOR   AFFILIATION MEDFORD,M.O.         Tennessee     Valley Authority RECIP.NAME             RECIPIENT AFFILIATION Document Control Branch (Document         Control Desk)


==SUBJECT:==
==SUBJECT:==
Submits revised response to violations noted in Insp Repts 50-259/89-16,50-260/89-16
Submits revised response to violations noted in Insp Repts                         D 50-259/89-16,50-260/89-16 & 50-296/89-16.
&50-296/89-16.
DISTRIBUTION CODE: IE01D TITLE: General      (50 COPIES RECEIVED:LTR   E ENCL Dkt)-Insp Rept/Notice of Vi6lation Response
DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR E ENCL/SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice of Vi6lation Response NOTES:1 Copy each to: B.Wilson,S.
                                                                          /  SIZE:
BLACK 1 Copy each to: S.Black,B.WILSON 1 Copy each to: S.Black,B.WILSON DOCKET N 05000259 05000260 05000296 D/05000259 05000260 05000296 D D EXTERNAL: LPDR NSIC NOTES: 1 1 1 1 5 5 NRC PDR 1 1 D NOTE TO ALL"RIDS" RECIPIENTS:
                                                                                                  /
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!AL NUMBER OF COPIES REQUIRED: LTTR 2P ENCL 29 D D sC i IS  
NOTES:1 Copy each       to: B.Wilson,S. BLACK                                       05000259 1 Copy each     to: S.Black,B.WILSON                                       05000260 1 Copy each     to: S. Black,B.WILSON                                       05000296 D
'e TENNESSEE VALLEY AUTHORITY.CHATTANOOGA.
RECIPIENT              COPIES            RECIPIENT          COPIES              D ID  CODE/NAME            LTTR ENCL        ID CODE/NAME      LTTR ENCL PD                                        ROSS,T.                1    1 INTERNAL: ACRS                          2      2    AEOD                  1    1 IIB
TENNESSEE 3740l 6N 38A Lookout Place AUS I 4>S80 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.20555, Gentlemen:
                                                .
In the Matter of Tennessee Valley Authority Docket Nos.50-259 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN)-UNITS 1, 2, AND 3-NRC INSPECTION REPORT NOS.50-259/89-16$
AEOD/DE                      1      1    AEOD/TPAD              1    1 DEDRO                        1      1    NRR MORISSEAU DF      1    1 NRR SHANKMAN,S                1      1    NRR/DLPQ/LPEB10        1    1 NRR/DOEA    DIR'11          1      1    NRR/DREP/PEPB9D        1    1  '
50-260/89-16$
NRR/DRIS/DIR                  1'          NRR/DST/DIR 8E2            1 NRR/PMAS/I LRB12              1      1    NUDOCS-ABSTRACT        1    1 0                            1      1    OGC/HDS2"              1    1 REG  FILE        02          1      1    RGN2    FILE  01      1    1 EXTERNAL: LPDR                           1      1    NRC PDR                1   1 NSIC                          1     1 NOTES:                                    5     5 D
50-296/89-16
D D
-REVISION TO NOTICE OF VIOLATION RESPONSE  
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
AL NUMBER OF COPIES REQUIRED: LTTR               2P   ENCL   29 sC
 
i IS
 
TENNESSEE VALLEY AUTHORITY
'e                                  . CHATTANOOGA. TENNESSEE 3740l 6N 38A   Lookout Place AUS     I4    >S80 U.S. Nuclear Regulatory Commission ATTN:   Document   Control Desk Washington, D.C.     20555, Gentlemen:
In the Matter of                                                         Docket Nos. 50-259 Tennessee  Valley Authority                                                            50-260 50-296 BROWNS FERRY NUCLEAR PLANT       (BFN) UNITS 1, 2, AND 3 NRC INSPECTION REPORT NOS. 50-259/89-16$   50-260/89-16$ 50-296/89-16 REVISION TO NOTICE OF VIOLATION RESPONSE


==Reference:==
==Reference:==
Letter from M. 0. Medford to NRC dated            April 9, 1990, "BROWNS FERRY NUCLEAR PLANT (BFN)  UNITS 1, 2, AND            3, NRC INSPECTION REPORT NOS. 50-259/89-16, 50-260/89-16, AND            50-296/89-16 RESPONSE TO NOTICE OF VIOLATION" TVA  committed in the referenced letter to complete the following two commitments by August 15, 1990:        (1),Essential mechanical calculations performed by the contractor will be reviewed for errors "and the errors corrected. The errors will be evaluated for impact on calculation results and conclusions and (2) Area walkdowns will be completed.
This  letter is  provided to extend the completion date for these items.            The first  commitment, correction of errors in mechanical calculations, will be completed by December 3, 1990. The errors in the subject calculations have been identified and the calculations are in the process of being corrected.
The second commitment$    performance of area walkdowns,        will be  completed by December 3, 1990 based    on the  current unit 2'restart schedule.        Current levels of maintenance and    modification activities in the plant make          it to perform the area walkdowns by August 15, 1990. The area walkdown procedure inappropriate has been drafted and is currently in the review and approval cycle.
081. 0281 PILI.IGW POP IJ ADQCK 0 iC)OI32. <'v                                                            ~grf PbI An Equal Opportunity Employer


Letter from M.0.Medford to NRC dated April 9, 1990,"BROWNS FERRY NUCLEAR PLANT (BFN)-UNITS 1, 2, AND 3, NRC INSPECTION REPORT NOS.50-259/89-16, 50-260/89-16, AND 50-296/89 RESPONSE TO NOTICE OF VIOLATION" TVA committed in the referenced letter to complete the following two commitments by August 15, 1990: (1),Essential mechanical calculations performed by the contractor will be reviewed for errors"and the errors corrected.
U.S. Nuclear Regulatory Commission                        AU814 teso The other commitments made in the referenced letter have been completed. The enclosure to this letter provides the revised commitment dates. If you have any questions, please telephone Patrick P. Carier at (205) 729-3566.
The errors will be evaluated for impact on calculation results and conclusions and (2)Area walkdowns will be completed.
Very truly yours, TENNESSEE VALLEY AUTHORITY Mark O. Medford,'ice President Nuclear Technology and Licensing Enclosure cc (Enclosure):
This letter is provided to extend the completion date for these items.The first commitment, correction of errors in mechanical calculations, will be completed by December 3, 1990.The errors in the subject calculations have been identified and the calculations are in the process of being corrected.
Ms. S. C. Black, Deputy Director Project Directorate 11-4 U.S. Nuclear Regulatory Commission One  White  Flint, North 11555  Rockville Pike, Rockville, Maryland 20852 NRC  Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama 35609-2000 Thierry  M. Ross, Project Manager U. S. Nuclear Regulatory Commission One White Flight, North 11555 Rockville Pike Rockville, Maryland 208 Mr. B. A. Wilson, Project Chief U.S. Nuclear Regulatory Commission Region  II 101  Marietta Street, NW, Suite  2900 Atlanta, Georgia 30323
The second commitment$
performance of area walkdowns, will be completed by December 3, 1990 based on the current unit 2'restart schedule.Current levels of maintenance and modification activities in the plant make it inappropriate to perform the area walkdowns by August 15, 1990.The area walkdown procedure has been drafted and is currently in the review and approval cycle.081.0281 PILI.IGW POP ADQCK 0 iC)OI32.<'v IJ PbI~grf An Equal Opportunity Employer


U.S.Nuclear Regulatory Commission AU814 teso The other commitments made in the referenced letter have been completed.
ENCLOSURE LIST OF COMMITMENTS
The enclosure to this letter provides the revised commitment dates.If you have any questions, please telephone Patrick P.Carier at (205)729-3566.Very truly yours, TENNESSEE VALLEY AUTHORITY Mark O.Medford,'ice President Nuclear Technology and Licensing Enclosure cc (Enclosure):
: 1. Essential mechanical calculations performed by the contractor will be reviewed for errors and the errors corrected. The errors will be ev'aluated for impact on calculation results and conclusions by December 3, 1990. (Violation A, example 1)
Ms.S.C.Black, Deputy Director Project Directorate 11-4 U.S.Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike, Rockville, Maryland 20852 NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama 35609-2000 Thierry M.Ross, Project Manager U.S.Nuclear Regulatory Commission One White Flight, North 11555 Rockville Pike Rockville, Maryland 208 Mr.B.A.Wilson, Project Chief U.S.Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 ENCLOSURE LIST OF COMMITMENTS 1.Essential mechanical calculations performed by the contractor will be reviewed for errors and the errors corrected.
: 2. Area walkdowns will be completed by December 3, 1990 (Violation A, example 3: Violation B, examples 1, 2, and 7)}}
The errors will be ev'aluated for impact on calculation results and conclusions by December 3, 1990.(Violation A, example 1)2.Area walkdowns will be completed by December 3, 1990 (Violation A, example 3: Violation B, examples 1, 2, and 7)}}

Revision as of 23:35, 21 October 2019

Submits Revised Response to Violations Noted in Insp Repts 50-259/89-16,50-260/89-16 & 50-296/89-16.Extends Completion Dates for Commitments to 901203
ML18033B482
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 08/14/1990
From: Medford M
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9008150281
Download: ML18033B482 (7)


Text

ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM

<S80 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555, Gentlemen:

In the Matter of Docket Nos. 50-259 Tennessee Valley Authority 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) UNITS 1, 2, AND 3 NRC INSPECTION REPORT NOS. 50-259/89-16$ 50-260/89-16$ 50-296/89-16 REVISION TO NOTICE OF VIOLATION RESPONSE

Reference:

Letter from M. 0. Medford to NRC dated April 9, 1990, "BROWNS FERRY NUCLEAR PLANT (BFN) UNITS 1, 2, AND 3, NRC INSPECTION REPORT NOS. 50-259/89-16, 50-260/89-16, AND 50-296/89-16 RESPONSE TO NOTICE OF VIOLATION" TVA committed in the referenced letter to complete the following two commitments by August 15, 1990: (1),Essential mechanical calculations performed by the contractor will be reviewed for errors "and the errors corrected. The errors will be evaluated for impact on calculation results and conclusions and (2) Area walkdowns will be completed.

This letter is provided to extend the completion date for these items. The first commitment, correction of errors in mechanical calculations, will be completed by December 3, 1990. The errors in the subject calculations have been identified and the calculations are in the process of being corrected.

The second commitment$ performance of area walkdowns, will be completed by December 3, 1990 based on the current unit 2'restart schedule. Current levels of maintenance and modification activities in the plant make it to perform the area walkdowns by August 15, 1990. The area walkdown procedure inappropriate has been drafted and is currently in the review and approval cycle.

081. 0281 PILI.IGW POP IJ ADQCK 0 iC)OI32. <'v ~grf PbI An Equal Opportunity Employer

U.S. Nuclear Regulatory Commission AU814 teso The other commitments made in the referenced letter have been completed. The enclosure to this letter provides the revised commitment dates. If you have any questions, please telephone Patrick P. Carier at (205) 729-3566.

Very truly yours, TENNESSEE VALLEY AUTHORITY Mark O. Medford,'ice President Nuclear Technology and Licensing Enclosure cc (Enclosure):

Ms. S. C. Black, Deputy Director Project Directorate 11-4 U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike, Rockville, Maryland 20852 NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama 35609-2000 Thierry M. Ross, Project Manager U. S. Nuclear Regulatory Commission One White Flight, North 11555 Rockville Pike Rockville, Maryland 208 Mr. B. A. Wilson, Project Chief U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323

ENCLOSURE LIST OF COMMITMENTS

1. Essential mechanical calculations performed by the contractor will be reviewed for errors and the errors corrected. The errors will be ev'aluated for impact on calculation results and conclusions by December 3, 1990. (Violation A, example 1)
2. Area walkdowns will be completed by December 3, 1990 (Violation A, example 3: Violation B, examples 1, 2, and 7)