ML18051A599: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 February 20, 2018 EA-17-166 Mr. Darin Myers Vice President Southern Nuclear Operating Company, Inc.
-1257 February 20, 2018 EA-17-166 Mr. Darin Myers Vice President Southern Nuclear Operating Company, Inc.
7821 River Road Waynesboro, GA 30830
7821 River Road Waynesboro, GA 30830  


==SUBJECT:==
==SUBJECT:==
Line 27: Line 26:
==SUMMARY==
==SUMMARY==


Dear Mr. Myers
==Dear Mr. Myers:==
On February 12, 2018, the U.S. Nuclear Regulatory Commission (NRC) staff held a Predecisional Enforcement Conference (PEC) with you and members of your staff at the NRC Region II Office in Atlanta, GA. The PEC was requested by Southern Nuclear Operating Company, Inc. (SNC) following the issuance of NRC Inspection Report Number 05000424/2017012 and 05000425/2017012 related to the failure of SNC system operators to conduct operator rounds as required by procedure and deliberate falsification of information material to the NRC at Vogtle Electric Generating Plant, Units 1 and 2
 
. That inspection report was dated December 21, 2017, and is available from the NRC's website, www.nrc.gov, under the Agencywide Documents Access and Management System Accession No. ML17355A481.
On February 12, 2018, the U.S. Nuclear Regulatory Commission (NRC) staff held a Predecisional Enforcement Conference (PEC) with you and members of your staff at the NRC Region II Office in Atlanta, GA. The PEC was requested by Southern Nuclear Operating Company, Inc. (SNC) following the issuance of NRC Inspection Report Number 05000424/2017012 and 05000425/2017012 related to the failure of SNC system operators to conduct operator rounds as required by procedure and deliberate falsification of information material to the NRC at Vogtle Electric Generating Plant, Units 1 and 2. That inspection report was dated December 21, 2017, and is available from the NRCs website, www.nrc.gov, under the Agencywide Documents Access and Management System Accession No. ML17355A481. A brief summary of the PEC proceedings is enclosed.
A brief summary of the PEC proceedings is enclosed.
No response to this letter is required. Please contact Alan Blamey of my staff at 404-997-4415 if you have any questions regarding this matter.
No response to this letter is required. Please contact Alan Blamey of my staff at 404-997-4415 if you have any questions regarding this matter
Sincerely,
.        Sincerely,         /RA/         Joel T. Munday, Director Division of Reactor Projects Docket Nos. 50
                                                    /RA/
-424 and 50
Joel T. Munday, Director Division of Reactor Projects Docket Nos. 50-424 and 50-425
-425


==Enclosure:==
==Enclosure:==
Line 40: Line 38:
PEC Summary Distribution via ListServ
PEC Summary Distribution via ListServ


D. Myers 2  
D. Myers                                 2


==SUBJECT:==
==SUBJECT:==
Line 46: Line 44:


==SUMMARY==
==SUMMARY==
February 20, 2018 DISTRIBUTION
February 20, 2018 DISTRIBUTION:
: A. Blamey, RII R. Hannah, RII M. Kowal, RII L. Casey, NRR D. Jones, OE ADAMS ACCESSION No.
A. Blamey, RII R. Hannah, RII M. Kowal, RII L. Casey, NRR D. Jones, OE ADAMS ACCESSION No. ML18051A599 OFFICE         RII/DRP   RII/DRP       RII/EICS NAME           ABlamey   JMunday       SSparks /RA AJB3 for/
ML18051A599 OFFICE RII/DRP RII/DRP RII/EICS   NAME ABlamey JMunday SSparks /RA AJB3 for/
DATE           2/14/2018 2/14/2018     2/14/2018 OFFICIAL RECORD COPY
DATE 2/14/2018 2/14/2018 2/14/2018   OFFICIAL RECORD COPY


Enclosure PREDECISIONAL ENFORCEMENT CONFERENCE  
PREDECISIONAL ENFORCEMENT CONFERENCE  


==SUMMARY==
==SUMMARY==


Licensee: Southern Nuclear Operating Company, Inc. Facility: Vogtle Electric Generating Plant, Units 1 and 2 License No s.: NPF-68 and NPF
Licensee: Southern Nuclear Operating Company, Inc.
-81 Docket No s.: 05000424 and 05000425 EA-17-166 On February 12, 2018, representatives of Southern Nuclear Company (SNC) met with NRC personnel in the Region II office located in Atlanta, GA, to discuss the apparent violations identified in NRC Inspection Report Number 05000424/2017012 and 05000425/2017012 related to the failure of SNC system operators to conduct operator rounds as required by procedure and deliberate falsification of information material to the NRC at Vogtle Electric Generating Plant, Units 1 and 2
Facility: Vogtle Electric Generating Plant, Units 1 and 2 License Nos.: NPF-68 and NPF-81 Docket Nos.: 05000424 and 05000425 EA-17-166 On February 12, 2018, representatives of Southern Nuclear Company (SNC) met with NRC personnel in the Region II office located in Atlanta, GA, to discuss the apparent violations identified in NRC Inspection Report Number 05000424/2017012 and 05000425/2017012 related to the failure of SNC system operators to conduct operator rounds as required by procedure and deliberate falsification of information material to the NRC at Vogtle Electric Generating Plant, Units 1 and 2. The conference was held at the request of SNC, following the issuance of this inspection report.
. The conference was held at the request of SNC, following the issuance of this inspection report
SNC presented a summary of the causes for the apparent violations and their corrective actions. SNC agreed with the apparent violations identified in NRC Inspection Report Number 05000424/2017012 and 05000425/2017012, as written.
. SNC presented a summary of the causes for the apparent violations and their corrective actions. SNC agreed with the apparent violations identified in NRC Inspection Report Number 05000424/2017012 and 05000425/2017012, as written.
The attendance list and the licensees presentation are attached to this summary.
The attendance list and the licensee's presentation are attached to this summary.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this summary and its enclosures will be made available to the Public.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this summary and its enclosures will be made available to the Public.
Attachments:
Attachments:
: 1. Attendance List
: 1. Attendance List
: 2. Licensee Presentation
: 2. Licensee Presentation Enclosure
 
Attachment 1 PEC Attendance List - 2/12/2018 Southern Nuclear Operating Company, Inc.:
Darin Myers        Vice President, Vogtle 1&2 Daniel Komm        Plant Manager, Vogtle 1&2 Dom Sutton          Regulatory Affairs Manager, Vogtle 1 &2 Jesse Key          Operations SRO, Vogtle 1&2 Keith Tabor        VP, Fleet Operations Mike Meier          VP, Regulatory Affairs Jamie Coleman      Assistant to the VP of Regulatory Affairs JJ Hutto            Fleet Regulatory Affairs Director Justin Wheat        Licensing Manager, Nuclear Licensing Terry Reis          Project Manager, Nuclear Licensing Tom Poindexter      Morgan Lewis, External Counsel Nuclear Regulatory Commission:
Laura Dudes        Deputy Regional Administrator Joel Munday        Director, Division of Reactor Projects Alan Blamey        Chief, Projects Branch 2 Sarah Price        Regional Counsel Scott Sparks        Senior Enforcement Specialist Paul Peduzzi        Deputy Director, Office of Enforcement David Jones        Enforcement Specialist, Office of Enforcement Rob Carpenter      Attorney, Material Litigation and Enforcement Scott Luina        Senior Special Agent, Office of Investigations Mike King          Deputy Director, Division of Inspection and Regional Support Lauren Casey        Enforcement Coordinator, Division of Inspection and Regional Support Patrick Heher      Inspector, Projects Branch 2
 
Vogtle Electric Generating Plant Pre-Decisional Enforcement Conference Vogtle Operator Rounds EA-17-166 NRC Region II - February 12, 2018 1
 
Vogtle and Corporate SNC Speakers
* Darin Myers      Plant Vogtle Site Vice President
* Daniel Komm      Plant Vogtle Site Plant Manager
* Dom Sutton      Plant Vogtle Regulatory Affairs Manager
* Jesse Key        Plant Vogtle Operations / SRO
* Keith Taber      SNC Vice President Fleet Operations
* Jamie Coleman    Assistant to Regulatory Affairs Vice President 2
 
Agenda
* Opening Remarks                          Darin Myers
* Event Overview                          Daniel Komm
* Vogtle Actions                          Daniel Komm / Jesse Key
  - Event Overview
  - Root Cause
  - Corrective Actions
* Fleet Actions                            Jamie Coleman
* Escalated Enforcement Assessment Process Dom Sutton
* Closing Remarks
  - Fleet                                  Keith Taber
  - Vogtle                                Darin Myers 3
 
Opening Remarks
* NRC letter dated December 21, 2017(ML17355A481) provided SNC the opportunity to:
  - Present our perspective on the two apparent violations presented in the letter
  - Provide the information the NRC needs to make a final enforcement decision
* Contrary to Criterion V of Appendix B, on multiple instances during August thru mid-October, 2016, at least 13 SOs failed to complete their rounds, an activity affecting quality, as prescribed by documented instructions and procedures. Specifically, at least 13 SOs entered data related to equipment status, general area inspections, and housekeeping conditions of the areas listed above on multiple occasions without actually entering those areas as required by Operations Procedure 11882-1/2, Outside Area Rounds, versions 97/82.
* Contrary to 10 CFR 50.9, on multiple instances from August thru mid-October, 2016, information required by the Commissions regulations to be maintained by the licensee was not complete and accurate in all material respects. Specifically, at least 13 SOs failed to comply with the procedural requirements of Operations Procedure 11882-1/2, Outside Area Rounds, versions 97/82, in that the SOs recorded data for areas that they never actually entered on multiple occasions.
4
 
Southern Company Values 5
 
Opening Remarks
* Watershed Event for Vogtle and Southern Nuclear
* SNC agrees with the apparent violations as written
* History of potential integrity and procedure use and adherence events across fleet
* These issues have led to dealing with the issue holistically across the fleet including an SNC initiative, Upholding Our Values: A New Program for Guiding Behaviors for Personal and Professional Success
* Our actions are focused on our culture
  - While we cannot preclude individuals from deliberately violating requirements, we can decrease their ability to rationalize their behavior, narrow the distance between their wrongdoing and consequence, decrease the opportunities for wrongdoing, and provide ethical reminders to prevent poor decision making, and also shape the culture and values of the organization.
* SNC retained independent assistance throughout the discovery, root cause analysis, and recovery for this event and a similar event at Farley 6
 
Event Overview
* October 25, 2016
  - NRC Region II contacts Corporate
  - Residents have information that operator rounds were falsified
  - 3 SOs did not enter the TDAFW room between September 4 and September 24 during rounds but logs showed data readings were taken
* October 26, 2016
  - Details are provided to site management
  - SNC Investigation begins and confirms that NRC data appeared correct
  - SNC keeps NRC Region II informed of daily results
* October 27, 2016
  - Corporate staff meets with consultants brought in to assure independence in investigation
  - Operations expands data range to August 1 - October 27* for TDAFW
  - More SOs are identified as potentially falsifying data
  - Investigators begin SO interviews
  - Badges are pulled and employees are sent home while information is being verified -
compliance restored
  - Operations Manager conducts face to face briefing with each shift crew
* For some individuals, to get an appropriate sample size, the investigation went back earlier than August 1, 2016 7
 
Event Overview (Continued)
* October 28 - November 3, 2016
  - Extent of condition expands over time to all 19 outside rooms
  - All 64 SOs and 28 SROs interviewed; 22 potential SO falsifications identified
  - Root cause team formed with independent consultants serving as team leader and team members
* November 2, 2016
  - Shift Managers begin receiving card reader data associated with operator rounds for accountability verification
* November 4, 2016
  - Investigation complete at Vogtle 1 and 2
  - Site VP message to all employees titled the meaning of your signature
* November 8, 2016
  - Root cause team kicks off review
  - Outside rounds flow path in handheld software is aligned with physical flow path
  - Parallel investigation initiated at Farley with independent consultants serving as team leader and team members 8
 
Event Overview (Continued)
* November 9 - 10, 2016
  - Review Board is convened to make recommendation to management
  - Board consisted of HR, Operations, Legal, Employee Relations, and Access Control personnel with outside independence
  - Board concluded evidence indicates a substantial number of individuals falsified information; varying levels of discipline are administered up to and including termination for SOs and supervisors
* November 14, 2016
  - Parallel investigation initiated at Hatch
* November 17 - 28, 2016
  - Shift Briefing issued on performance of electronic rounds
  - Shift Briefing on handheld tutorial to include the value of electronic signature
* Post January 1, 2017, based on new information received, some workers initially dismissed have been brought back; however, SNC has retained its right to make the final determination of who is Trustworthy and Reliable.
9
 
Corrective Actions
* As discussed in the following slides, SNC aggressively took prompt and comprehensive corrective actions to both restore compliance and preclude recurrence.
* Additionally SNC took a holistic approach to address our integrity issues through an initiative to positively influence our culture and reinforce our values.
  - Upholding Our Values: A New Program for Guiding Behaviors for Personal and Professional Success 10
 
Immediate Corrective Actions
* Leadership
  - Site VP sent a message to all employees titled, The meaning and value of your signature
  - Operations Manager conducted a face to face briefing with each shift crew
* Process
  - At each shift end, Shift Managers received card reader data associated with operator rounds for accountability (Interim Measure)
  - Shift Briefing issued on NMP-OS-007-007, Rounds and Log keeping, performance of electronic rounds
  - Shift Briefing issued including tutorial on use of handheld data entry devices and the significance of an electronic signature
  - Operator handheld user guide made available on Operations webpage - Standing Order SB 2016-30 Rounds Handheld Communication generated
  - Outside rounds flow path in handheld software aligned with physical flow path
  - Performed Training Needs Analysis for Handheld PDA 11
 
Root Cause Analysis
* Direct Root Cause
  - System Operators Willfully Falsified Rounds
* Contributing Causes
  - Less than Adequate (LTA) Station Leadership Recognition of Integrity Issue
  - LTA Supervisory Oversight of Operator Rounds
  - LTA Recognition and Follow-up of Internal and External Events Related to Integrity
* Root Cause Analyses at both Vogtle and Farley were performed with substantial assistance from independent consultants
* Root Cause analyses incorporated factors influencing dishonest behavior
  -  Ability to rationalize behavior
  -  Distance between action and consequence
  -  Opportunities for wrongdoing
  -  Frequency of ethical reminders 12
 
Root Cause Corrective Actions
* Root Cause 1
  - Systems Operators Willfully Falsified Operator Rounds
* Corrective Actions to Preclude Recurrence (CAPR)
  - CAPR1 - Termination of employment for those who willfully falsified operator rounds
  - CAPR2 - Created a procedure for random verification of records by performing periodic audits of Operator, Security and Fire Watch rounds logs to determine whether the personnel assigned actually entered the rooms required for the logs and the times spent in the rooms were adequate to perform the assigned duties 13
 
Root Cause Corrective Actions Other actions to address causes are:
* Leadership
    - Have CRs evaluated for potential integrity issues through NMP-GM-002-001 Corrective Action Program Instruction
    - Evaluate potential integrity issues using culpability matrix INPO-07-006 and NMP-GM-002-GL03, Cause Analysis and Corrective Action Guidelines
    - Case study of root cause presented to staff during SOER 10-02 training
* Process
  - Revise NMP-OS-007-007, Rounds and Log keeping to require face to face debriefs with shift supervisor
  - Revise NMP-OS-007 Conduct of Operations to reinforce the chain of command for SOs for a single supervisor authority
  - Revise NOS procedure NOS-112-001, Comprehensive Performance Assessment to require the assessment to review the functional areas ability to screen and evaluate potential integrity gaps during the CAP process 14
 
Root Cause Corrective Actions Other actions to address causes are (contd):
* Process
  - Perform a Training Needs Analysis on delivering a communication to all badged workers on:
* Importance of signature
* Handwritten and electronic signature have equal weight
    - Revise External OE Screening Procedure, NMP-GM-008 Operating Experience Program to require screening for potential integrity issues
    - Develop and implement a user guide for use of handheld devices 15
 
Root Cause Corrective Actions
* Because of the compromise of integrity without staff or supervisory detection, a broad set of comprehensive corrective actions were developed to address the organizational behavior changes necessary to address the above Root and Contributing Causes.
* Long Term Corrective Action 1 - Conduct an independent assessment focusing on personal integrity issues
* Long Term Corrective Action 2 - Provide training to Station Leadership to look for and recognize integrity issues/problems (recurring) 16
 
Fleet Analysis Significance of event led SNC to consider this event in concert with other past events where actions were willful in nature.
Analysis showed that 14 of the 16 events had similar drivers Two common types of issues and events
* Inadequate verification
    - Work tasks related to EP, RP and Security
* Personal integrity issues
    - Willful/careless disregard
    - Deliberate acts 17


PEC Attendance List
Research into Dishonest Behavior
- 2/12/2018  Southern Nuclear Operating Company, Inc.:
* The root cause and common cause analyses incorporated current research into wrongdoing.
Darin Myers  Vice President, Vogtle 1&2 Daniel Komm Plant Manager, Vogtle 1&2 Dom Sutton Regulatory Affairs Manager, Vogtle 1 &2 Jesse Key  Operations SRO, Vogtle 1&2 Keith Tabor VP, Fleet Operations Mike Meier VP, Regulatory Affairs Jamie Coleman Assistant to the VP of Regulatory Affairs JJ Hutto Fleet Regulatory Affairs Director Justin Wheat Licensing Manager, Nuclear Licensing Terry Reis Project Manager, Nuclear Licensing Tom Poindexter Morgan Lewis, External Counsel Nuclear Regulatory Commission:
* Duke University Professor Dan Ariely has written extensively on the subject and is the author of The (Honest) Truth About Dishonesty
Laura Dudes Deputy Regional Administrator Joel Munday Director, Division of Reactor Projects Alan Blamey Chief, Projects Branch 2 Sarah Price Regional Couns el Scott Sparks Senior Enforcement Specialist Paul Peduzzi Deputy Director, Office of Enforcement David Jones Enforcement Specialist, Office of Enforcement Rob Carpenter Attorney, Material Litigation and Enforcement Scott Luina Senior Special Agent, Office of Investigations Mike King Deputy Director, Division of Inspection and Regional Support Lauren Casey Enforcement Coordinator, Division of Inspection and Regional Support Patrick Heher Inspector, Projects Branch 2
* Our summary of his work leads us to the understanding of four significant factors that lead people to dishonest behavior
    - Ability to rationalize the cheating
    -  Distance between action and consequence
    - Number of opportunities presented and how easy it is to cheat
    -  The lack of ethical reminders reinforcing that such behavior has no place in our workforce 18


******
Additional Actions Across Fleet/Recovery Actions
* Process
  - Procedurally require periodic verification of work in various organizations (NMP-AD-051)
  - Procedurally require CFAM and NOS oversight of new process changes
  - Require actions to screen for integrity issues in CAP, OE and HU
  - Document common process for event investigation and resolution
  - Institute an independent assessment focusing on personal integrity issues
* Human Resources
  - Discipline policies are under review with possible changes
  - Assess compliance programs for preventing and detecting fraud and other integrity issues
  - Discuss, during performance reviews, Southern Company Our Values with emphasis on personal integrity, procedure use and adherence, and falsification
* Training
  - Conduct fleet-wide training to recognize behavior factors that impact integrity
  - Implement first-line supervisor Perform Oversight training with personal integrity emphasis
* Communications
  - Discuss integrity OE at Leadership Alignment Meetings
  - Conduct face-to-face communications on signature, integrity OE, and complying with regulatory requirements
  - Provide communications to all employees annually and during site-wide meetings 19


***-
Upholding Our Values HONESTY EVERYBODYS DOING IT CONFLICTS OF INTEREST IM NOT HURTING ANYONE LYING FOR OTHERS CREATIVITY LACK OF SUPERVISION SOCIAL NORMS FATIGUE DISTANCE FROM THE TASK SELF DECEPTION DISHONESTY 20
-
-***--


*
Southern Company Values 21
--*
*


*****-*
Escalated Enforcement Assessment Process
*
* SNC understands the factors that contribute to the escalated enforcement assessment process.
---*
* First SNC accepts the apparent violations as written.
--
* Contrary to Criterion V of Appendix B, on multiple instances during August thru mid-October, 2016, at least 13 SOs failed to complete their rounds, an activity affecting quality, as prescribed by documented instructions and procedures.
-*
Specifically, at least 13 SOs entered data related to equipment status, general area inspections, and housekeeping conditions of the areas listed above on multiple occasions without actually entering those areas as required by Operations Procedure 11882-1/2, Outside Area Rounds, versions 97/82.
-
* Contrary to 10 CFR 50.9, on multiple instances from August thru mid-October, 2016, information required by the Commissions regulations to be maintained by the licensee was not complete and accurate in all material respects. Specifically, at least 13 SOs failed to comply with the procedural requirements of Operations Procedure 11882-1/2, Outside Area Rounds, versions 97/82, in that the SOs recorded data for areas that they never actually entered on multiple occasions.
----
22
-  
*--
-*
-
*
--
*
---
*--
-*
-*--
*


*
Escalated Enforcement Assessment Process
*
* SNC acknowledges the apparent violations were willful in nature.
-
* SNC acknowledges the Policy, Section 2.2.1(d) provides that a willful violation may be considered for a significance level greater than the underlying noncompliance.
*
* Compliance was restored on October 27, 2016 when badges of potential offenders were pulled.
-
* SNC considers that the underlying violations would be categorized as Severity Level IV
-
  - No actual consequences
*--
  - Potential consequences of very low safety significance
----
  - Similar to Severity Level IVs listed in Section 6 of the Policy 23
*
-*---**
-
---
*
-*--


*
Escalated Enforcement Assessment Process
---
* SNC acknowledges the extent of condition is significant.
*---  
* Commission Policy does not provide for aggregation of violations.
* Commission chose not to take escalated enforcement for the examples contained in Information Notice 92-15 and Generic Letter 93-03
  - Stated that future violations of this nature would be considered for escalated enforcement
  - As such, current violations should not be considered greater than Severity Level III 24


*-
Escalated Enforcement Assessment Process
**
* Identification
--
  - The issue was initially brought to Vogtles attention by the NRC.
***
  - SNC had multiple prior opportunities for identification.
  - SNC did perform a comprehensive extent of condition assessment at Vogtle and across the fleet.
25


*-*
Escalated Enforcement Assessment Process
--
* Corrective Action
*
  - SNC took prompt and comprehensive corrective actions to both restore compliance and preclude recurrence.
*
  - Additionally, SNC took actions across the fleet to positively influence the culture of our organization and reinforce our values.
*
  - Consideration should be given to exercising discretion and refraining from issuing a civil penalty.
-
26
---
*-----*---*-
-*---


*
Closing Remarks
**
* SNC is accountable for these violations.
*
* Event not consistent with Our Values
**
  - Safety First
*
  - Unquestionable Trust
*
  - Superior Performance
-
  - Total Commitment
--
* SNC has taken corrective actions not only to restore compliance and preclude recurrence, but to refocus the values and influence the culture of the organization.
***
* SNC has taken and is taking actions that will ensure Sustainability.
-
27}}
-  
*
---
*-
--
**
-
--
-
*
*}}

Latest revision as of 19:59, 21 October 2019

Predecisional Enforcement Conference Summary
ML18051A599
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 02/20/2018
From: Joel Munday
NRC/RGN-II
To: Myers D
Southern Nuclear Operating Co
References
EA-17-166
Download: ML18051A599 (31)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 February 20, 2018 EA-17-166 Mr. Darin Myers Vice President Southern Nuclear Operating Company, Inc.

7821 River Road Waynesboro, GA 30830

SUBJECT:

VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2, PREDECISIONAL ENFORCEMENT CONFERENCE

SUMMARY

Dear Mr. Myers:

On February 12, 2018, the U.S. Nuclear Regulatory Commission (NRC) staff held a Predecisional Enforcement Conference (PEC) with you and members of your staff at the NRC Region II Office in Atlanta, GA. The PEC was requested by Southern Nuclear Operating Company, Inc. (SNC) following the issuance of NRC Inspection Report Number 05000424/2017012 and 05000425/2017012 related to the failure of SNC system operators to conduct operator rounds as required by procedure and deliberate falsification of information material to the NRC at Vogtle Electric Generating Plant, Units 1 and 2. That inspection report was dated December 21, 2017, and is available from the NRCs website, www.nrc.gov, under the Agencywide Documents Access and Management System Accession No. ML17355A481. A brief summary of the PEC proceedings is enclosed.

No response to this letter is required. Please contact Alan Blamey of my staff at 404-997-4415 if you have any questions regarding this matter.

Sincerely,

/RA/

Joel T. Munday, Director Division of Reactor Projects Docket Nos. 50-424 and 50-425

Enclosure:

PEC Summary Distribution via ListServ

D. Myers 2

SUBJECT:

VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2, PREDECISIONAL ENFORCEMENT CONFERENCE

SUMMARY

February 20, 2018 DISTRIBUTION:

A. Blamey, RII R. Hannah, RII M. Kowal, RII L. Casey, NRR D. Jones, OE ADAMS ACCESSION No. ML18051A599 OFFICE RII/DRP RII/DRP RII/EICS NAME ABlamey JMunday SSparks /RA AJB3 for/

DATE 2/14/2018 2/14/2018 2/14/2018 OFFICIAL RECORD COPY

PREDECISIONAL ENFORCEMENT CONFERENCE

SUMMARY

Licensee: Southern Nuclear Operating Company, Inc.

Facility: Vogtle Electric Generating Plant, Units 1 and 2 License Nos.: NPF-68 and NPF-81 Docket Nos.: 05000424 and 05000425 EA-17-166 On February 12, 2018, representatives of Southern Nuclear Company (SNC) met with NRC personnel in the Region II office located in Atlanta, GA, to discuss the apparent violations identified in NRC Inspection Report Number 05000424/2017012 and 05000425/2017012 related to the failure of SNC system operators to conduct operator rounds as required by procedure and deliberate falsification of information material to the NRC at Vogtle Electric Generating Plant, Units 1 and 2. The conference was held at the request of SNC, following the issuance of this inspection report.

SNC presented a summary of the causes for the apparent violations and their corrective actions. SNC agreed with the apparent violations identified in NRC Inspection Report Number 05000424/2017012 and 05000425/2017012, as written.

The attendance list and the licensees presentation are attached to this summary.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this summary and its enclosures will be made available to the Public.

Attachments:

1. Attendance List
2. Licensee Presentation Enclosure

Attachment 1 PEC Attendance List - 2/12/2018 Southern Nuclear Operating Company, Inc.:

Darin Myers Vice President, Vogtle 1&2 Daniel Komm Plant Manager, Vogtle 1&2 Dom Sutton Regulatory Affairs Manager, Vogtle 1 &2 Jesse Key Operations SRO, Vogtle 1&2 Keith Tabor VP, Fleet Operations Mike Meier VP, Regulatory Affairs Jamie Coleman Assistant to the VP of Regulatory Affairs JJ Hutto Fleet Regulatory Affairs Director Justin Wheat Licensing Manager, Nuclear Licensing Terry Reis Project Manager, Nuclear Licensing Tom Poindexter Morgan Lewis, External Counsel Nuclear Regulatory Commission:

Laura Dudes Deputy Regional Administrator Joel Munday Director, Division of Reactor Projects Alan Blamey Chief, Projects Branch 2 Sarah Price Regional Counsel Scott Sparks Senior Enforcement Specialist Paul Peduzzi Deputy Director, Office of Enforcement David Jones Enforcement Specialist, Office of Enforcement Rob Carpenter Attorney, Material Litigation and Enforcement Scott Luina Senior Special Agent, Office of Investigations Mike King Deputy Director, Division of Inspection and Regional Support Lauren Casey Enforcement Coordinator, Division of Inspection and Regional Support Patrick Heher Inspector, Projects Branch 2

Vogtle Electric Generating Plant Pre-Decisional Enforcement Conference Vogtle Operator Rounds EA-17-166 NRC Region II - February 12, 2018 1

Vogtle and Corporate SNC Speakers

  • Darin Myers Plant Vogtle Site Vice President
  • Daniel Komm Plant Vogtle Site Plant Manager
  • Dom Sutton Plant Vogtle Regulatory Affairs Manager
  • Jesse Key Plant Vogtle Operations / SRO
  • Keith Taber SNC Vice President Fleet Operations
  • Jamie Coleman Assistant to Regulatory Affairs Vice President 2

Agenda

  • Opening Remarks Darin Myers
  • Event Overview Daniel Komm
  • Vogtle Actions Daniel Komm / Jesse Key

- Event Overview

- Root Cause

- Corrective Actions

  • Fleet Actions Jamie Coleman
  • Escalated Enforcement Assessment Process Dom Sutton
  • Closing Remarks

- Fleet Keith Taber

- Vogtle Darin Myers 3

Opening Remarks

  • NRC letter dated December 21, 2017(ML17355A481) provided SNC the opportunity to:

- Present our perspective on the two apparent violations presented in the letter

- Provide the information the NRC needs to make a final enforcement decision

  • Contrary to Criterion V of Appendix B, on multiple instances during August thru mid-October, 2016, at least 13 SOs failed to complete their rounds, an activity affecting quality, as prescribed by documented instructions and procedures. Specifically, at least 13 SOs entered data related to equipment status, general area inspections, and housekeeping conditions of the areas listed above on multiple occasions without actually entering those areas as required by Operations Procedure 11882-1/2, Outside Area Rounds, versions 97/82.
  • Contrary to 10 CFR 50.9, on multiple instances from August thru mid-October, 2016, information required by the Commissions regulations to be maintained by the licensee was not complete and accurate in all material respects. Specifically, at least 13 SOs failed to comply with the procedural requirements of Operations Procedure 11882-1/2, Outside Area Rounds, versions 97/82, in that the SOs recorded data for areas that they never actually entered on multiple occasions.

4

Southern Company Values 5

Opening Remarks

  • Watershed Event for Vogtle and Southern Nuclear
  • SNC agrees with the apparent violations as written
  • History of potential integrity and procedure use and adherence events across fleet
  • These issues have led to dealing with the issue holistically across the fleet including an SNC initiative, Upholding Our Values: A New Program for Guiding Behaviors for Personal and Professional Success
  • Our actions are focused on our culture

- While we cannot preclude individuals from deliberately violating requirements, we can decrease their ability to rationalize their behavior, narrow the distance between their wrongdoing and consequence, decrease the opportunities for wrongdoing, and provide ethical reminders to prevent poor decision making, and also shape the culture and values of the organization.

  • SNC retained independent assistance throughout the discovery, root cause analysis, and recovery for this event and a similar event at Farley 6

Event Overview

  • October 25, 2016

- NRC Region II contacts Corporate

- Residents have information that operator rounds were falsified

- 3 SOs did not enter the TDAFW room between September 4 and September 24 during rounds but logs showed data readings were taken

  • October 26, 2016

- Details are provided to site management

- SNC Investigation begins and confirms that NRC data appeared correct

- SNC keeps NRC Region II informed of daily results

  • October 27, 2016

- Corporate staff meets with consultants brought in to assure independence in investigation

- Operations expands data range to August 1 - October 27* for TDAFW

- More SOs are identified as potentially falsifying data

- Investigators begin SO interviews

- Badges are pulled and employees are sent home while information is being verified -

compliance restored

- Operations Manager conducts face to face briefing with each shift crew

  • For some individuals, to get an appropriate sample size, the investigation went back earlier than August 1, 2016 7

Event Overview (Continued)

  • October 28 - November 3, 2016

- Extent of condition expands over time to all 19 outside rooms

- All 64 SOs and 28 SROs interviewed; 22 potential SO falsifications identified

- Root cause team formed with independent consultants serving as team leader and team members

  • November 2, 2016

- Shift Managers begin receiving card reader data associated with operator rounds for accountability verification

  • November 4, 2016

- Investigation complete at Vogtle 1 and 2

- Site VP message to all employees titled the meaning of your signature

  • November 8, 2016

- Root cause team kicks off review

- Outside rounds flow path in handheld software is aligned with physical flow path

- Parallel investigation initiated at Farley with independent consultants serving as team leader and team members 8

Event Overview (Continued)

  • November 9 - 10, 2016

- Review Board is convened to make recommendation to management

- Board consisted of HR, Operations, Legal, Employee Relations, and Access Control personnel with outside independence

- Board concluded evidence indicates a substantial number of individuals falsified information; varying levels of discipline are administered up to and including termination for SOs and supervisors

  • November 14, 2016

- Parallel investigation initiated at Hatch

  • November 17 - 28, 2016

- Shift Briefing issued on performance of electronic rounds

- Shift Briefing on handheld tutorial to include the value of electronic signature

  • Post January 1, 2017, based on new information received, some workers initially dismissed have been brought back; however, SNC has retained its right to make the final determination of who is Trustworthy and Reliable.

9

Corrective Actions

  • As discussed in the following slides, SNC aggressively took prompt and comprehensive corrective actions to both restore compliance and preclude recurrence.
  • Additionally SNC took a holistic approach to address our integrity issues through an initiative to positively influence our culture and reinforce our values.

- Upholding Our Values: A New Program for Guiding Behaviors for Personal and Professional Success 10

Immediate Corrective Actions

  • Leadership

- Site VP sent a message to all employees titled, The meaning and value of your signature

- Operations Manager conducted a face to face briefing with each shift crew

  • Process

- At each shift end, Shift Managers received card reader data associated with operator rounds for accountability (Interim Measure)

- Shift Briefing issued on NMP-OS-007-007, Rounds and Log keeping, performance of electronic rounds

- Shift Briefing issued including tutorial on use of handheld data entry devices and the significance of an electronic signature

- Operator handheld user guide made available on Operations webpage - Standing Order SB 2016-30 Rounds Handheld Communication generated

- Outside rounds flow path in handheld software aligned with physical flow path

- Performed Training Needs Analysis for Handheld PDA 11

Root Cause Analysis

  • Direct Root Cause

- System Operators Willfully Falsified Rounds

  • Contributing Causes

- Less than Adequate (LTA) Station Leadership Recognition of Integrity Issue

- LTA Supervisory Oversight of Operator Rounds

- LTA Recognition and Follow-up of Internal and External Events Related to Integrity

  • Root Cause Analyses at both Vogtle and Farley were performed with substantial assistance from independent consultants
  • Root Cause analyses incorporated factors influencing dishonest behavior

- Ability to rationalize behavior

- Distance between action and consequence

- Opportunities for wrongdoing

- Frequency of ethical reminders 12

Root Cause Corrective Actions

  • Root Cause 1

- Systems Operators Willfully Falsified Operator Rounds

  • Corrective Actions to Preclude Recurrence (CAPR)

- CAPR1 - Termination of employment for those who willfully falsified operator rounds

- CAPR2 - Created a procedure for random verification of records by performing periodic audits of Operator, Security and Fire Watch rounds logs to determine whether the personnel assigned actually entered the rooms required for the logs and the times spent in the rooms were adequate to perform the assigned duties 13

Root Cause Corrective Actions Other actions to address causes are:

  • Leadership

- Have CRs evaluated for potential integrity issues through NMP-GM-002-001 Corrective Action Program Instruction

- Evaluate potential integrity issues using culpability matrix INPO-07-006 and NMP-GM-002-GL03, Cause Analysis and Corrective Action Guidelines

- Case study of root cause presented to staff during SOER 10-02 training

  • Process

- Revise NMP-OS-007-007, Rounds and Log keeping to require face to face debriefs with shift supervisor

- Revise NMP-OS-007 Conduct of Operations to reinforce the chain of command for SOs for a single supervisor authority

- Revise NOS procedure NOS-112-001, Comprehensive Performance Assessment to require the assessment to review the functional areas ability to screen and evaluate potential integrity gaps during the CAP process 14

Root Cause Corrective Actions Other actions to address causes are (contd):

  • Process

- Perform a Training Needs Analysis on delivering a communication to all badged workers on:

  • Importance of signature
  • Handwritten and electronic signature have equal weight

- Revise External OE Screening Procedure, NMP-GM-008 Operating Experience Program to require screening for potential integrity issues

- Develop and implement a user guide for use of handheld devices 15

Root Cause Corrective Actions

  • Because of the compromise of integrity without staff or supervisory detection, a broad set of comprehensive corrective actions were developed to address the organizational behavior changes necessary to address the above Root and Contributing Causes.
  • Long Term Corrective Action 1 - Conduct an independent assessment focusing on personal integrity issues
  • Long Term Corrective Action 2 - Provide training to Station Leadership to look for and recognize integrity issues/problems (recurring) 16

Fleet Analysis Significance of event led SNC to consider this event in concert with other past events where actions were willful in nature.

Analysis showed that 14 of the 16 events had similar drivers Two common types of issues and events

  • Inadequate verification

- Work tasks related to EP, RP and Security

  • Personal integrity issues

- Willful/careless disregard

- Deliberate acts 17

Research into Dishonest Behavior

  • The root cause and common cause analyses incorporated current research into wrongdoing.
  • Duke University Professor Dan Ariely has written extensively on the subject and is the author of The (Honest) Truth About Dishonesty
  • Our summary of his work leads us to the understanding of four significant factors that lead people to dishonest behavior

- Ability to rationalize the cheating

- Distance between action and consequence

- Number of opportunities presented and how easy it is to cheat

- The lack of ethical reminders reinforcing that such behavior has no place in our workforce 18

Additional Actions Across Fleet/Recovery Actions

  • Process

- Procedurally require periodic verification of work in various organizations (NMP-AD-051)

- Procedurally require CFAM and NOS oversight of new process changes

- Require actions to screen for integrity issues in CAP, OE and HU

- Document common process for event investigation and resolution

- Institute an independent assessment focusing on personal integrity issues

  • Human Resources

- Discipline policies are under review with possible changes

- Assess compliance programs for preventing and detecting fraud and other integrity issues

- Discuss, during performance reviews, Southern Company Our Values with emphasis on personal integrity, procedure use and adherence, and falsification

  • Training

- Conduct fleet-wide training to recognize behavior factors that impact integrity

- Implement first-line supervisor Perform Oversight training with personal integrity emphasis

  • Communications

- Discuss integrity OE at Leadership Alignment Meetings

- Conduct face-to-face communications on signature, integrity OE, and complying with regulatory requirements

- Provide communications to all employees annually and during site-wide meetings 19

Upholding Our Values HONESTY EVERYBODYS DOING IT CONFLICTS OF INTEREST IM NOT HURTING ANYONE LYING FOR OTHERS CREATIVITY LACK OF SUPERVISION SOCIAL NORMS FATIGUE DISTANCE FROM THE TASK SELF DECEPTION DISHONESTY 20

Southern Company Values 21

Escalated Enforcement Assessment Process

  • SNC understands the factors that contribute to the escalated enforcement assessment process.
  • First SNC accepts the apparent violations as written.
  • Contrary to Criterion V of Appendix B, on multiple instances during August thru mid-October, 2016, at least 13 SOs failed to complete their rounds, an activity affecting quality, as prescribed by documented instructions and procedures.

Specifically, at least 13 SOs entered data related to equipment status, general area inspections, and housekeeping conditions of the areas listed above on multiple occasions without actually entering those areas as required by Operations Procedure 11882-1/2, Outside Area Rounds, versions 97/82.

  • Contrary to 10 CFR 50.9, on multiple instances from August thru mid-October, 2016, information required by the Commissions regulations to be maintained by the licensee was not complete and accurate in all material respects. Specifically, at least 13 SOs failed to comply with the procedural requirements of Operations Procedure 11882-1/2, Outside Area Rounds, versions 97/82, in that the SOs recorded data for areas that they never actually entered on multiple occasions.

22

Escalated Enforcement Assessment Process

  • SNC acknowledges the apparent violations were willful in nature.
  • SNC acknowledges the Policy, Section 2.2.1(d) provides that a willful violation may be considered for a significance level greater than the underlying noncompliance.
  • Compliance was restored on October 27, 2016 when badges of potential offenders were pulled.

- No actual consequences

- Potential consequences of very low safety significance

- Similar to Severity Level IVs listed in Section 6 of the Policy 23

Escalated Enforcement Assessment Process

  • SNC acknowledges the extent of condition is significant.
  • Commission Policy does not provide for aggregation of violations.

- Stated that future violations of this nature would be considered for escalated enforcement

- As such, current violations should not be considered greater than Severity Level III 24

Escalated Enforcement Assessment Process

  • Identification

- The issue was initially brought to Vogtles attention by the NRC.

- SNC had multiple prior opportunities for identification.

- SNC did perform a comprehensive extent of condition assessment at Vogtle and across the fleet.

25

Escalated Enforcement Assessment Process

  • Corrective Action

- SNC took prompt and comprehensive corrective actions to both restore compliance and preclude recurrence.

- Additionally, SNC took actions across the fleet to positively influence the culture of our organization and reinforce our values.

- Consideration should be given to exercising discretion and refraining from issuing a civil penalty.

26

Closing Remarks

  • SNC is accountable for these violations.
  • Event not consistent with Our Values

- Safety First

- Unquestionable Trust

- Superior Performance

- Total Commitment

  • SNC has taken corrective actions not only to restore compliance and preclude recurrence, but to refocus the values and influence the culture of the organization.
  • SNC has taken and is taking actions that will ensure Sustainability.

27