Updated Inspection Plan for Vogtle Electric Generating Plant, Units 3 and 4 - Report 05200025/2024005 and 05200026/2024005
ML24235A195
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 08/22/2024
From: Bradley Davis
Division Reactor Projects II
To: Coleman J
Southern Nuclear Company
References
IR 2024005
Download: ML24235A195 (5)


Text

Jamie Coleman Regulatory Affairs Director Southern Nuclear Company, Inc.

3535 Colonnade Parkway Birmingham, AL 35243

SUBJECT:

UPDATED INSPECTION PLAN FOR VOGTLE ELECTRIC GENERATING PLANT, UNITS 3 AND 4 - REPORT 05200025/2024005 AND 05200026/2024005

Dear Jamie Coleman:

The enclosed inspection plan lists the inspections scheduled through June 30, 2026, for Vogtle Electric Generating Plant, Units 3 and 4. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4415 with any questions you have regarding this letter.

Sincerely, Bradley J. Davis, Chief Construction Inspection Branch 2 Division of Construction Oversight Docket Nos. 05200025 and 05200026 License Nos. NPF-91 and NPF-92 Enclosure(s):

Inspection Plan cc w/ encl: Distribution via LISTSERV August 22, 2024 Signed by Davis, Bradley on 08/22/24

ML24235A195 X

SUNSI Review X

Non-Sensitive

Sensitive X

Publicly Available

Non-Publicly Available OFFICE RII/DRP RII/DRP NAME A. Alen Arias B. Davis DATE 08/22/24 08/22/24

Enclosure Vogtle AP 1000 09/01/2024 - 06/30/2026 Unit Start End Activity CAC Title Staff Count UNIT 3 IN-SERVICE INSPECTION +SG 1

3 10/21/2024 11/1/2024 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION 3

3,4 10/21/2024 10/25/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 3,4 10/21/2024 10/25/2024 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 3,4 10/21/2024 10/25/2024 IP 71124.04 000728 Occupational Dose Assessment 3,4 10/21/2024 10/25/2024 IP 71124.05 000729 Radiation Monitoring Instrumentation 3,4 10/21/2024 10/25/2024 IP 71151 000746 Performance Indicator Verification 3,4 11/4/2024 11/8/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 3,4 11/4/2024 11/8/2024 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 3,4 11/4/2024 11/8/2024 IP 71124.04 000728 Occupational Dose Assessment 3,4 11/4/2024 11/8/2024 IP 71124.05 000729 Radiation Monitoring Instrumentation 3,4 11/4/2024 11/8/2024 IP 71151 000746 Performance Indicator Verification SECURITY BASELINE INSPECTION 3

3,4 10/21/2024 10/24/2024 IP 71130.02 000734 Access Control 3,4 10/21/2024 10/24/2024 IP 71130.05 000737 Protective Strategy Evaluation 3,4 10/21/2024 10/24/2024 IP 71130.09 001656 Security Plan Changes 3,4 10/21/2024 10/24/2024 IP 71151 001338 Performance Indicator Verification EMERGENCY PREPAREDNESS PROGRAM INSPECTION 2

3,4 2/24/2025 2/28/2025 IP 71114.02 000717 Alert and Notification System Testing 3,4 2/24/2025 2/28/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 3,4 2/24/2025 2/28/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 3,4 2/24/2025 2/28/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness 3,4 2/24/2025 2/28/2025 IP 71151 001397 Performance Indicator Verification MATERIAL CONTROL AND ACCOUNTING 1

3,4 2/24/2025 2/28/2025 IP 71130.11 000742 Material Control and Accounting (MC&A) 4

CYBER SECURITY INSPECTION 3,4 7/7/2025 7/11/2025 IP 71130.10 000741 Cybersecurity PROBLEM IDENTIFICATION AND RESOLUTION 6

3,4 8/4/2025 8/8/2025 IP 71152B 000747 Problem Identification and Resolution 3,4 8/18/2025 8/22/2025 IP 71152B 000747 Problem Identification and Resolution RP OCCUPATIONAL RAD SAFETY AND TRANSPORTATION BASELINE INSPECTION 2

3,4 9/8/2025 9/12/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 3,4 9/8/2025 9/12/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation 3,4 9/8/2025 9/12/2025 IP 71151 000746 Performance Indicator Verification UNIT 4 IN-SERVICE INSPECTION +SG 1

4 9/15/2025 9/26/2025 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

VOGTLE 3 AND 4 INITIAL LICENSE EXAM 4

3,4 9/21/2025 9/26/2025 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV) 3,4 11/12/2025 11/21/2025 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)

SECURITY BASELINE INSPECTION 2

3,4 10/6/2025 10/9/2025 IP 71130.02 000734 Access Control 3,4 10/6/2025 10/9/2025 IP 71130.09 001656 Security Plan Changes 3,4 10/6/2025 10/9/2025 IP 71151 001338 Performance Indicator Verification FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - VOG 5

3,4 11/17/2025 11/21/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 3,4 12/8/2025 12/12/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing CONSTRUCTION OF AN ISFSI 2

3,4 12/15/2025 12/19/2025 IP 60853 000999 Onsite Fabrication of Components and Construction of an Independent Spent Fuel Storage Installation FOCUSED ENGINEERING INSPECTION (AGE RELATED) 2 3,4 2/9/2026 2/13/2026 IP 71111.21N.04 001832 Age-Related Degradation 3,4 2/23/2026 2/27/2026 IP 71111.21N.04 001832 Age-Related Degradation UNIT 3 IN-SERVICE INSPECTION +SG 1

3 4/20/2026 5/1/2026 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION 2

3,4 4/20/2026 4/24/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

Site Inspection Activity Plan Prepared on 8/22/2024 10:41:41 AM 3 of 5 3,4 4/20/2026 4/24/2026 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 3,4 4/20/2026 4/24/2026 IP 71124.04 000728 Occupational Dose Assessment 3,4 4/20/2026 4/24/2026 IP 71124.05 000729 Radiation Monitoring Instrumentation 3,4 4/20/2026 4/24/2026 IP 71151 000746 Performance Indicator Verification 3,4 5/4/2026 5/8/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 3,4 5/4/2026 5/8/2026 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 3,4 5/4/2026 5/8/2026 IP 71124.04 000728 Occupational Dose Assessment 3,4 5/4/2026 5/8/2026 IP 71124.05 000729 Radiation Monitoring Instrumentation 3,4 5/4/2026 5/8/2026 IP 71151 000746 Performance Indicator Verification VOGTLE 3 AND 4 INITIAL LICENSE EXAM 4

3,4 4/5/2026 4/10/2026 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV) 3,4 5/10/2026 5/22/2026 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)

EMERGENCY PREPAREDNESS EXERCISE INSPECTION 5

3,4 5/11/2026 5/15/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 3,4 5/11/2026 5/15/2026 IP 71114.07 000722 Exercise Evaluation - Hostile Action (HA) Event 3,4 5/11/2026 5/15/2026 IP 71151 001397 Performance Indicator Verification COMPREHENSIVE ENGINEERING TEAM INSPECTION (CETI) 7 3,4 6/22/2026 6/26/2026 IP 71111.21M 000713 Comprehensive Engineering Team Inspection TARGET SET INSPECTION 2

3,4 6/22/2026 6/26/2026 IP 71130.14 000743 Review of Power Reactor Target Sets