| title = Harris 2018002 Emailed Radiation Safety RFI
| title = Emailed Radiation Safety RFI
| author name = Kellner R
| author name = Kellner R
| author affiliation = NRC/RGN-II
| author affiliation = NRC/RGN-II
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:From:Kellner, RobertTo:"Yarley, Charles"Cc:Panfel, Jacob
{{#Wiki_filter:ML#
From:           Kellner, Robert To:             "Yarley, Charles" Cc:             Panfel, Jacob


==Subject:==
==Subject:==
Harris April 2018NRC Radiation Safety Inspection Document RequestDate:Monday, February 26, 2018 10:20:00 AMAttachments:HAR 2018002 Rad Haz & Trans Document Request.pdfChuck, Per your response to my previous email, you will be the licensing point of contact for theupcoming NRC Radiation Safety Inspection scheduled for the week of April 16 - 20, 2018at the Harris Nuclear Plant. Attached is the Initial Information Request and a DocumentRequest List. The NRC inspectors that will be on-site during the inspection are myself, and Jacob Panfel. Both of us should be up to date on our Duke access training. Please let me know that you received this request. If there are any questions about thisinspection, or the material requested, please contact me via email, or at the phone numberor address included below. Regards, Bob Robert KellnerSenior Health PhysicistUSNRC/Region II/DRS/EB3Marquis One TowerSuite 1200245 Peachtree Center Ave, NEAtlanta, GA 30303-1257(404) 997-4508 Harris Nuclear Plant Radiation Safety Baseline Inspection Initial Information Request Inspection Report: 2018002 During the week of April 16 - 20, 2018, the NRC will perform a baseline Radiation Safety Inspection at the Harris Nuclear Plant (NRC Inspection Procedures 71124.01, and 71124.08). Experience has shown that this inspection is resource-intensive for both the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we are requesting in advance documents needed for this activity. It is important that all of these documents are up-to-date, and complete, thereby minimizing the number of additional documents requested during the preparation, and/or the onsite portions of the inspection. The NRC requests that these documents be provided to the inspectors no later than March 26, 2018.
Harris April 2018NRC Radiation Safety Inspection Document Request Date:           Monday, February 26, 2018 10:20:00 AM Attachments:   HAR 2018002 Rad Haz & Trans Document Request.pdf
: Chuck, Per your response to my previous email, you will be the licensing point of contact for the upcoming NRC Radiation Safety Inspection scheduled for the week of April 16 - 20, 2018 at the Harris Nuclear Plant. Attached is the Initial Information Request and a Document Request List.
The NRC inspectors that will be on-site during the inspection are myself, and Jacob Panfel.
Both of us should be up to date on our Duke access training.
Please let me know that you received this request. If there are any questions about this inspection, or the material requested, please contact me via email, or at the phone number or address included below.
: Regards, Bob Robert Kellner Senior Health Physicist USNRC/Region II/DRS/EB3 Marquis One Tower Suite 1200 245 Peachtree Center Ave, NE Atlanta, GA 30303-1257 (404) 997-4508
 
Harris Nuclear Plant Radiation Safety Baseline Inspection Initial Information Request Inspection Report: 2018002 During the week of April 16 - 20, 2018, the NRC will perform a baseline Radiation Safety Inspection at the Harris Nuclear Plant (NRC Inspection Procedures 71124.01, and 71124.08).
Experience has shown that this inspection is resource-intensive for both the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we are requesting in advance documents needed for this activity. It is important that all of these documents are up-to-date, and complete, thereby minimizing the number of additional documents requested during the preparation, and/or the onsite portions of the inspection. The NRC requests that these documents be provided to the inspectors no later than March 26, 2018.
If there are any questions about this inspection or the material requested, please contact the lead inspector, Robert Kellner at 404-997-4508, or the Plant Support Branch 1 Chief, Brian Bonser at 404-997-4653.
If there are any questions about this inspection or the material requested, please contact the lead inspector, Robert Kellner at 404-997-4508, or the Plant Support Branch 1 Chief, Brian Bonser at 404-997-4653.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public inspections, exemptions, requests for withholding," a copy of this document will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.  
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding, a copy of this document will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
PAPERWORK REDUCTION ACT STATEMENT This document does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget under control numbers 3150-0008, 3150-0011, 3150-0014, 3150-0044, and 3150-0135.
PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement, unless the requesting document displays a currently valid Office of Management and Budget control number.


PAPERWORK REDUCTION ACT STATEMENT  This document does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget under control numbers 3150-0008, 3150-0011, 3150-0014, 3150-0044, and 3150-0135. PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement, unless the requesting document displays a currently valid Office of Management and Budget control number.
Document Request List Occupational and Public Radiation Safety Cornerstone Licensee:     Harris Nuclear Plant Docket Number:     05000400 Inspection Dates:     April 16 - 20, 2018 Documents Due to Region II by:       March 26, 2018 Inspection Procedures:         IP 71124.01       Radiological Hazard Assessment and Exposure Controls IP 71124.08       Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation Lead Inspector:               Robert Kellner Sr. Health Physicist US NRC Region II (404) 997-4508 robert.kellner@nrc.gov Note: The current version of these documents is expected unless specified otherwise.
Page 2 of 4  Document Request List Occupational and Public Radiation Safety Cornerstone   Licensee: Harris Nuclear Plant Docket Number: 05000400 Inspection Dates: April 16 - 20, 2018 Documents Due to Region II by: March 26, 2018 Inspection Procedures: IP 71124.01 Radiological Hazard Assessment and Exposure Controls IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation Lead Inspector: Robert Kellner Sr. Health Physicist US NRC Region II (404) 997-4508 robert.kellner@nrc.gov Note: The current version of these documents is expected unless specified otherwise. Electronic media is preferred if readily available. [Note that the inspectors cannot accept data provided on USB or "flash" drives due to NRC IT security policies.] Please organize the information as it is arranged below to the extent possible. During the inspection, the inspectors may request additional documents. If there are questions regarding the documents requested, or if the documents cannot be provided by the due date, please do not hesitate to contact the lead inspector. Documentation for these inspection procedures, are requested from July 1, 2017 to present, unless otherwise specified. We would prefer as much of the information as possible in electronic form. An index of the CD contents is also helpful. For those items requesting a list of documents/areas, the inspector will select documents/areas from the list for on-site review. Miscellaneous 1. List of primary site contact(s) for each inspection area including name(s) and telephone numbers. 2. List of radiation protection procedures, including title and number. 3. Plant Management, Radiation Protection, and Chemistry organizational charts w/ contact numbers 4. Outage schedule, including work activities to be conducted during the week(s) of the inspection (e.g. Gantt chart or similar list) 5. Corrective action program procedure(s)
Electronic media is preferred if readily available. [Note that the inspectors cannot accept data provided on USB or flash drives due to NRC IT security policies.] Please organize the information as it is arranged below to the extent possible. During the inspection, the inspectors may request additional documents. If there are questions regarding the documents requested, or if the documents cannot be provided by the due date, please do not hesitate to contact the lead inspector.
Documentation for these inspection procedures, are requested from July 1, 2017 to present, unless otherwise specified. We would prefer as much of the information as possible in electronic form. An index of the CD contents is also helpful. For those items requesting a list of documents/areas, the inspector will select documents/areas from the list for on-site review.
Miscellaneous
: 1. List of primary site contact(s) for each inspection area including name(s) and telephone numbers.
: 2. List of radiation protection procedures, including title and number.
: 3. Plant Management, Radiation Protection, and Chemistry organizational charts w/ contact numbers
: 4. Outage schedule, including work activities to be conducted during the week(s) of the inspection (e.g. Gantt chart or similar list)
: 5. Corrective action program procedure(s)
Page 2 of 4


Page 3 of 4  71124.01 - Radiological Hazard Assessment and Exposure Controls (Last Inspected July 2017) 1. List of active routine and outage related Radiation Work Permits (RWPs), including their administrative limits, electronic dosimeter dose rate limit, and dose limit. 2. Procedures related to Radiation Protection (RP) controls (e.g. Posting, labeling, surveys, RWPs, contamination control, HRA/LHRA/VHRA control, key control, control of divers, special controls during fuel offload, hot spots, etc.). 3. Procedures related to release of personnel and materials (e.g. release surveys, decontamination, guidance for alarm follow up, etc.). 4. List of locations, or plant maps indicating the location, of all Locked High Radiation Areas (LHRAs) and Very High Radiation Areas (VHRAs). Include areas with the potential to become a LHRA during routine operations or outages. 5. Copies of the most recent survey of all LHRAs and VHRAs (as applicable). 6. List of Nationally Tracked Sources and copies of any National Source Tracking System (NSTS) transaction documentation (e.g., change of owner ship and annual reconciliation). 7. Copy of the most recent sealed source inventory record. 8. List of all non-fuel items stored in spent fuel pool. 9. Audits and self-assessments performed since July 1, 2017 that encompass radiation protection controls/activities (radiological controls, radiological area access control, contamination control, etc.). 10. List of Corrective Action Program (CAP) documents (CRs, NCRs, PIPs, etc.) related to RP controls (e.g. keyword searches for radworker error, RP technician error, posting issues, HRA/LHRA/VHRA issues, survey problems, etc.) generated since July 1, 2017. This should include CAP nonconformance reports where the cause was listed as human performance.
71124.01 - Radiological Hazard Assessment and Exposure Controls (Last Inspected July 2017)
This should be a list of corrective action documents containing a (CR, NCR, etc.) number and brief description, not full documents. 11. All CAP nonconformance reports (AR, CR, NCR, etc.) related to Nationally Tracked Sources since July 1, 2017. 71124.08 - Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation (Last Inspected July 2017)
: 1. List of active routine and outage related Radiation Work Permits (RWPs), including their administrative limits, electronic dosimeter dose rate limit, and dose limit.
: 1. Procedures/Guidance documents describing licensee compliance with 10 CFR Parts 20, 61, and 71, and 49 CFR Parts 170-189. Procedures/manuals should include: a. Solid and liquid radwaste processing procedures. b. Procedure(s) for transferring radioactive waste resin and sludge discharges into shipping/disposal containers. c. Waste stream mixing and/or sampling procedures, including:   i. waste concentration averaging; ii. use of scaling factors and calculations used to account for difficult-to-measure radionuclides; iii. ensuring waste stream composition data accounts for changing operational parameters. d. Shipping/transportation procedures. e. Cask loading and closure procedures (licensee and vendor) applicable to last three cask transports. 2. Process Control Program 3. List of all abandoned solid and liquid radwaste processing equipment. 4. Provide a list of RAM storage areas, including satellite radiological controlled areas (RCAs) 5. Provide the last two radio-chemical sample analysis results (i.e., "10 CFR Part 61" analysis)
: 2. Procedures related to Radiation Protection (RP) controls (e.g. Posting, labeling, surveys, RWPs, contamination control, HRA/LHRA/VHRA control, key control, control of divers, special controls during fuel offload, hot spots, etc.).
Page 4 of 4 for each radioactive waste stream (e.g., dry active waste (DAW), ion exchange resins, mechanical filters, and sludges and activated materials), including QA data (e.g. in-house vs. vendor lab comparisons, current results vs. database, etc.) 6. List and documentation of any changes made to the radioactive waste processing systems (liquid and solid) and/or the Process Control Program (PCP) since the July 1, 2017, and associated 10 CFR 50.59 documentation, as appropriate. 7. Provide a log of RAM shipments (LSA I, II, IIII; SCO I, II, Type A, or Type B) since July 1, 2017. (The inspectors will select three to five packages to review in detail.) 8. Most recent self-assessment or audit of Shipping/radwaste processing and RAM storage programs. 9. Liquid and solid radwaste system diagrams and detailed system descriptions (e.g. information that might be contained in curricula for training new system engineers) 10. List of CAP documents (CRs, NCRs, PIPs, etc.) involving radioactive waste and RAM processing and/or transportation (e.g., keyword searches for RAM, shipping, radwaste, 10 Part 61, etc.) generated since July 1, 2017. This should be a list of corrective action documents containing a (CR, NCR, etc.) number and brief description, not full documents. 11. Available for on-site review during the inspection: a. Documentation describing the status of any radioactive waste process equipment that is not operational and/or is abandoned in place. b. Information concerning the site's waste disposal volume and waste reduction program. c. Training and qualification records for personnel responsible for radioactive waste. d. Training curriculum and primary lesson plans for qualifying persons, including vendors, for radwaste processing, packaging, and making shipments of RAM and radioactive waste as specified by 49 CFR Part 172. Assistance Requested During On-Site Inspection   Identification of work activities available during the inspection for inspector observations, including notification of pre-job briefings, notification of risk significant work activities, and audio/visual surveillance for remote job coverage. Assistance in plant walk-downs of radwaste systems. Health physics assistance in plant walk-downs/job coverage of ongoing activities to assess access controls. Inspector Contact Information: Mailing Address:
: 3. Procedures related to release of personnel and materials (e.g. release surveys, decontamination, guidance for alarm follow up, etc.).
Robert Kellner U.S. Nuclear Regulatory Commission Sr. Health Physicist US NRC Region II (404) 997-4508 ATTN: Mr. Robert Kellner robert.kellner@nrc.gov 245 Peachtree Center Ave., N.E Suite 1200 Atlanta, GA 30303  
: 4. List of locations, or plant maps indicating the location, of all Locked High Radiation Areas (LHRAs) and Very High Radiation Areas (VHRAs). Include areas with the potential to become a LHRA during routine operations or outages.
}}
: 5. Copies of the most recent survey of all LHRAs and VHRAs (as applicable).
: 6. List of Nationally Tracked Sources and copies of any National Source Tracking System (NSTS) transaction documentation (e.g., change of owner ship and annual reconciliation).
: 7. Copy of the most recent sealed source inventory record.
: 8. List of all non-fuel items stored in spent fuel pool.
: 9. Audits and self-assessments performed since July 1, 2017 that encompass radiation protection controls/activities (radiological controls, radiological area access control, contamination control, etc.).
: 10. List of Corrective Action Program (CAP) documents (CRs, NCRs, PIPs, etc.) related to RP controls (e.g. keyword searches for radworker error, RP technician error, posting issues, HRA/LHRA/VHRA issues, survey problems, etc.) generated since July 1, 2017. This should include CAP nonconformance reports where the cause was listed as human performance.
This should be a list of corrective action documents containing a (CR, NCR, etc.) number and brief description, not full documents.
: 11. All CAP nonconformance reports (AR, CR, NCR, etc.) related to Nationally Tracked Sources since July 1, 2017.
71124.08 - Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation (Last Inspected July 2017)
: 1. Procedures/Guidance documents describing licensee compliance with 10 CFR Parts 20, 61, and 71, and 49 CFR Parts 170-189. Procedures/manuals should include:
: a. Solid and liquid radwaste processing procedures.
: b. Procedure(s) for transferring radioactive waste resin and sludge discharges into shipping/disposal containers.
: c. Waste stream mixing and/or sampling procedures, including:
: i. waste concentration averaging; ii. use of scaling factors and calculations used to account for difficult-to-measure radionuclides; iii. ensuring waste stream composition data accounts for changing operational parameters.
: d. Shipping/transportation procedures.
: e. Cask loading and closure procedures (licensee and vendor) applicable to last three cask transports.
: 2. Process Control Program
: 3. List of all abandoned solid and liquid radwaste processing equipment.
: 4. Provide a list of RAM storage areas, including satellite radiological controlled areas (RCAs)
: 5. Provide the last two radio-chemical sample analysis results (i.e., 10 CFR Part 61" analysis)
Page 3 of 4
 
for each radioactive waste stream (e.g., dry active waste (DAW), ion exchange resins, mechanical filters, and sludges and activated materials), including QA data (e.g. in-house vs. vendor lab comparisons, current results vs. database, etc.)
: 6. List and documentation of any changes made to the radioactive waste processing systems (liquid and solid) and/or the Process Control Program (PCP) since the July 1, 2017, and associated 10 CFR 50.59 documentation, as appropriate.
: 7. Provide a log of RAM shipments (LSA I, II, IIII; SCO I, II, Type A, or Type B) since July 1, 2017. (The inspectors will select three to five packages to review in detail.)
: 8. Most recent self-assessment or audit of Shipping/radwaste processing and RAM storage programs.
: 9. Liquid and solid radwaste system diagrams and detailed system descriptions (e.g.
information that might be contained in curricula for training new system engineers)
: 10. List of CAP documents (CRs, NCRs, PIPs, etc.) involving radioactive waste and RAM processing and/or transportation (e.g., keyword searches for RAM, shipping, radwaste, 10 Part 61, etc.) generated since July 1, 2017. This should be a list of corrective action documents containing a (CR, NCR, etc.) number and brief description, not full documents.
: 11. Available for on-site review during the inspection:
: a. Documentation describing the status of any radioactive waste process equipment that is not operational and/or is abandoned in place.
: b. Information concerning the sites waste disposal volume and waste reduction program.
: c. Training and qualification records for personnel responsible for radioactive waste.
: d. Training curriculum and primary lesson plans for qualifying persons, including vendors, for radwaste processing, packaging, and making shipments of RAM and radioactive waste as specified by 49 CFR Part 172.
Assistance Requested During On-Site Inspection
* Identification of work activities available during the inspection for inspector observations, including notification of pre-job briefings, notification of risk significant work activities, and audio/visual surveillance for remote job coverage.
* Assistance in plant walk-downs of radwaste systems.
* Health physics assistance in plant walk-downs/job coverage of ongoing activities to assess access controls.
Inspector Contact Information:                   Mailing Address:
Robert Kellner                                   U.S. Nuclear Regulatory Commission Sr. Health Physicist                             US NRC Region II (404) 997-4508                                   ATTN: Mr. Robert Kellner robert.kellner@nrc.gov                           245 Peachtree Center Ave., N.E Suite 1200 Atlanta, GA 30303 Page 4 of 4}}

Latest revision as of 18:06, 21 October 2019

Emailed Radiation Safety RFI
ML18058B224
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 02/26/2018
From: Kellner R
NRC/RGN-II
To: Yarley C
Duke Energy Carolinas
References
IR 2018002
Download: ML18058B224 (5)


Text

ML#

From: Kellner, Robert To: "Yarley, Charles" Cc: Panfel, Jacob

Subject:

Harris April 2018NRC Radiation Safety Inspection Document Request Date: Monday, February 26, 2018 10:20:00 AM Attachments: HAR 2018002 Rad Haz & Trans Document Request.pdf

Chuck, Per your response to my previous email, you will be the licensing point of contact for the upcoming NRC Radiation Safety Inspection scheduled for the week of April 16 - 20, 2018 at the Harris Nuclear Plant. Attached is the Initial Information Request and a Document Request List.

The NRC inspectors that will be on-site during the inspection are myself, and Jacob Panfel.

Both of us should be up to date on our Duke access training.

Please let me know that you received this request. If there are any questions about this inspection, or the material requested, please contact me via email, or at the phone number or address included below.

Regards, Bob Robert Kellner Senior Health Physicist USNRC/Region II/DRS/EB3 Marquis One Tower Suite 1200 245 Peachtree Center Ave, NE Atlanta, GA 30303-1257 (404) 997-4508

Harris Nuclear Plant Radiation Safety Baseline Inspection Initial Information Request Inspection Report: 2018002 During the week of April 16 - 20, 2018, the NRC will perform a baseline Radiation Safety Inspection at the Harris Nuclear Plant (NRC Inspection Procedures 71124.01, and 71124.08).

Experience has shown that this inspection is resource-intensive for both the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we are requesting in advance documents needed for this activity. It is important that all of these documents are up-to-date, and complete, thereby minimizing the number of additional documents requested during the preparation, and/or the onsite portions of the inspection. The NRC requests that these documents be provided to the inspectors no later than March 26, 2018.

If there are any questions about this inspection or the material requested, please contact the lead inspector, Robert Kellner at 404-997-4508, or the Plant Support Branch 1 Chief, Brian Bonser at 404-997-4653.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding, a copy of this document will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

PAPERWORK REDUCTION ACT STATEMENT This document does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget under control numbers 3150-0008, 3150-0011, 3150-0014, 3150-0044, and 3150-0135.

PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement, unless the requesting document displays a currently valid Office of Management and Budget control number.

Document Request List Occupational and Public Radiation Safety Cornerstone Licensee: Harris Nuclear Plant Docket Number: 05000400 Inspection Dates: April 16 - 20, 2018 Documents Due to Region II by: March 26, 2018 Inspection Procedures: IP 71124.01 Radiological Hazard Assessment and Exposure Controls IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation Lead Inspector: Robert Kellner Sr. Health Physicist US NRC Region II (404) 997-4508 robert.kellner@nrc.gov Note: The current version of these documents is expected unless specified otherwise.

Electronic media is preferred if readily available. [Note that the inspectors cannot accept data provided on USB or flash drives due to NRC IT security policies.] Please organize the information as it is arranged below to the extent possible. During the inspection, the inspectors may request additional documents. If there are questions regarding the documents requested, or if the documents cannot be provided by the due date, please do not hesitate to contact the lead inspector.

Documentation for these inspection procedures, are requested from July 1, 2017 to present, unless otherwise specified. We would prefer as much of the information as possible in electronic form. An index of the CD contents is also helpful. For those items requesting a list of documents/areas, the inspector will select documents/areas from the list for on-site review.

Miscellaneous

1. List of primary site contact(s) for each inspection area including name(s) and telephone numbers.
2. List of radiation protection procedures, including title and number.
3. Plant Management, Radiation Protection, and Chemistry organizational charts w/ contact numbers
4. Outage schedule, including work activities to be conducted during the week(s) of the inspection (e.g. Gantt chart or similar list)
5. Corrective action program procedure(s)

Page 2 of 4

71124.01 - Radiological Hazard Assessment and Exposure Controls (Last Inspected July 2017)

1. List of active routine and outage related Radiation Work Permits (RWPs), including their administrative limits, electronic dosimeter dose rate limit, and dose limit.
2. Procedures related to Radiation Protection (RP) controls (e.g. Posting, labeling, surveys, RWPs, contamination control, HRA/LHRA/VHRA control, key control, control of divers, special controls during fuel offload, hot spots, etc.).
3. Procedures related to release of personnel and materials (e.g. release surveys, decontamination, guidance for alarm follow up, etc.).
4. List of locations, or plant maps indicating the location, of all Locked High Radiation Areas (LHRAs) and Very High Radiation Areas (VHRAs). Include areas with the potential to become a LHRA during routine operations or outages.
5. Copies of the most recent survey of all LHRAs and VHRAs (as applicable).
6. List of Nationally Tracked Sources and copies of any National Source Tracking System (NSTS) transaction documentation (e.g., change of owner ship and annual reconciliation).
7. Copy of the most recent sealed source inventory record.
8. List of all non-fuel items stored in spent fuel pool.
9. Audits and self-assessments performed since July 1, 2017 that encompass radiation protection controls/activities (radiological controls, radiological area access control, contamination control, etc.).
10. List of Corrective Action Program (CAP) documents (CRs, NCRs, PIPs, etc.) related to RP controls (e.g. keyword searches for radworker error, RP technician error, posting issues, HRA/LHRA/VHRA issues, survey problems, etc.) generated since July 1, 2017. This should include CAP nonconformance reports where the cause was listed as human performance.

This should be a list of corrective action documents containing a (CR, NCR, etc.) number and brief description, not full documents.

11. All CAP nonconformance reports (AR, CR, NCR, etc.) related to Nationally Tracked Sources since July 1, 2017.

71124.08 - Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation (Last Inspected July 2017)

1. Procedures/Guidance documents describing licensee compliance with 10 CFR Parts 20, 61, and 71, and 49 CFR Parts 170-189. Procedures/manuals should include:
a. Solid and liquid radwaste processing procedures.
b. Procedure(s) for transferring radioactive waste resin and sludge discharges into shipping/disposal containers.
c. Waste stream mixing and/or sampling procedures, including:
i. waste concentration averaging; ii. use of scaling factors and calculations used to account for difficult-to-measure radionuclides; iii. ensuring waste stream composition data accounts for changing operational parameters.
d. Shipping/transportation procedures.
e. Cask loading and closure procedures (licensee and vendor) applicable to last three cask transports.
2. Process Control Program
3. List of all abandoned solid and liquid radwaste processing equipment.
4. Provide a list of RAM storage areas, including satellite radiological controlled areas (RCAs)
5. Provide the last two radio-chemical sample analysis results (i.e., 10 CFR Part 61" analysis)

Page 3 of 4

for each radioactive waste stream (e.g., dry active waste (DAW), ion exchange resins, mechanical filters, and sludges and activated materials), including QA data (e.g. in-house vs. vendor lab comparisons, current results vs. database, etc.)

6. List and documentation of any changes made to the radioactive waste processing systems (liquid and solid) and/or the Process Control Program (PCP) since the July 1, 2017, and associated 10 CFR 50.59 documentation, as appropriate.
7. Provide a log of RAM shipments (LSA I, II, IIII; SCO I, II, Type A, or Type B) since July 1, 2017. (The inspectors will select three to five packages to review in detail.)
8. Most recent self-assessment or audit of Shipping/radwaste processing and RAM storage programs.
9. Liquid and solid radwaste system diagrams and detailed system descriptions (e.g.

information that might be contained in curricula for training new system engineers)

10. List of CAP documents (CRs, NCRs, PIPs, etc.) involving radioactive waste and RAM processing and/or transportation (e.g., keyword searches for RAM, shipping, radwaste, 10 Part 61, etc.) generated since July 1, 2017. This should be a list of corrective action documents containing a (CR, NCR, etc.) number and brief description, not full documents.
11. Available for on-site review during the inspection:
a. Documentation describing the status of any radioactive waste process equipment that is not operational and/or is abandoned in place.
b. Information concerning the sites waste disposal volume and waste reduction program.
c. Training and qualification records for personnel responsible for radioactive waste.
d. Training curriculum and primary lesson plans for qualifying persons, including vendors, for radwaste processing, packaging, and making shipments of RAM and radioactive waste as specified by 49 CFR Part 172.

Assistance Requested During On-Site Inspection

  • Identification of work activities available during the inspection for inspector observations, including notification of pre-job briefings, notification of risk significant work activities, and audio/visual surveillance for remote job coverage.
  • Assistance in plant walk-downs of radwaste systems.
  • Health physics assistance in plant walk-downs/job coverage of ongoing activities to assess access controls.

Inspector Contact Information: Mailing Address:

Robert Kellner U.S. Nuclear Regulatory Commission Sr. Health Physicist US NRC Region II (404) 997-4508 ATTN: Mr. Robert Kellner robert.kellner@nrc.gov 245 Peachtree Center Ave., N.E Suite 1200 Atlanta, GA 30303 Page 4 of 4