Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML24025A159 | 25 January 2024 | NRR E-mail Capture - Shearon Harris Nuclear Power Plant, Unit 1 - Request for Additional Information - Rvi AMP and Inspection Plan (L-2023-LLL-0016) | |
ML23177A199 | 26 June 2023 | NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-23-0005 - LAR to Align Certain TSs with ISTS (L-2023-LLA-0078) | |
ML23172A013 | 20 June 2023 | Duke Fleet - Correction to June 2, 2023, Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement Frequencies | Surveillance Frequency Control Program |
ML23153A189 | 2 June 2023 | Duke Fleet - Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement Frequencies | Surveillance Frequency Control Program |
ML23151A348 | 30 May 2023 | Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) | Incorporated by reference |
ML23142A273 | 22 May 2023 | Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) | Incorporated by reference |
ML23124A121 | 4 May 2023 | Acceptance of Requested Licensing Action Duke Fleet Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) | |
ML23082A043 | 23 March 2023 | 002 Radiation Safety Baseline Inspection Information Request Final | High Radiation Area Locked High Radiation Area Process Control Program COVID-19 |
ML23073A228 | 13 March 2023 | Duke Fleet- Adoption of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements - Acceptance Review | |
ML23065A094 | 6 March 2023 | NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-22-0081 - LAR to Address Administrative Changes to the Operating License and Technical Specifications (L-2023-LLA-0020) | |
ML23058A056 | 27 February 2023 | Acceptance of Amendment to Revise Surveillance Frequencies for RCS Pressure Isolation Valve Operational Leakage Testing and Reactor Trip System Instrumentation | Surveillance Frequency Control Program Operational leakage |
ML23048A151 | 16 February 2023 | Acceptance Review - Proposed Alternative for Steam Generator Welds (L-2023-LLR-0003) | |
ML22237A163 | 25 August 2022 | 004 Radiation Safety Baseline Inspection Information Request | Surveillance Frequency Control Program Coronavirus |
ML22115A141 | 25 April 2022 | NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition Information | Health Physics Network High winds |
ML22108A018 | 15 April 2022 | NRR E-mail Capture - Accepted for Review - Duke Energy Relief Request for Harris Nuclear Plant Inservice Testing Program Plan - Fourth Ten-Year Interval to Extend Type C Test to 75 Months | |
ML22083A070 | 24 March 2022 | NRR E-mail Capture - Catawba Nuclear Station, Units 1 and 2, Shearon Harris Nuclear Power Plant, Unit 1, and McGuire Nuclear Station, Units 1 and 2 - Acceptance Review for TSTF-569 LAR | |
ML22083A028 | 23 March 2022 | Email Snsb Safety Evaluation for Harris LAR to Revise Reactor Protection System TS | |
ML22038A157 | 7 February 2022 | NRR E-mail Capture - Duke Energy Fleet - Acceptance of License Amendment Request Regarding Adoption of TSTF-541, Revision 2 | |
ML22018A027 | 18 January 2022 | 2022 All RFI Responses - Exercise and Program Inspections - Revl | |
ML21361A012 | 23 December 2021 | NRR E-mail Capture - Accepted for Review - Duke Energy Fleet License Amendment Request to Relocate Emergency Operations Facility | |
ML21354A861 | 15 December 2021 | NRR E-mail Capture - Request for Additional Information - Duke Fleet Request RA-19-0352 - Alternative for RPV Closure Stud Exams (L-2020-LLR-0156) | Incorporated by reference Aging Management Stress corrosion cracking |
ML21321A378 | 16 November 2021 | NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSEL Unit 1 - Acceptance of License Amendment Request Adoption of TSTF-554 EPID-L-2021-LLA-0193 | |
ML21288A080 | 15 October 2021 | NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-21-0213 - Remove Limitations to Perform Certain SRs During Shutdown (L-2021-LLA-0167) | |
ML21295A037 | 5 October 2021 | NRR E-mail Capture - Accepted for Review - Duke Energy Fleet License Amendment Request to Adopt TSTF-577 Revised Frequencies for Steam Generator Tube Inspections | |
ML21252A011 | 30 August 2021 | NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1- RA-21-0191 - Revised TS Related to Reactor Trip System Instrumentation (L-2021-LLA-0149) | |
ML21189A028 | 1 July 2021 | NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-21-0112 - Revise TS to Reflect Development of TRM (L-2021-LLA-0108) | |
ML21172A243 | 21 June 2021 | NRR E-mail Capture - Request for Additional Information - Harris RA-20-0252 - LAR to Remove Extraneous Requirements from OL and TS (L-2021-LLA-0027) | |
ML21106A011 | 15 April 2021 | NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-21-0052 - Revise Containment Spray Nozzle Surveillance Frequency (L-2021-LLA-0058) | Surveillance Frequency Control Program |
ML21084A249 | 24 March 2021 | Notification of Inspection and Request for Information | Boric Acid Non-Destructive Examination Nondestructive Examination Incorporated by reference Flow Accelerated Corrosion Liquid penetrant |
ML21084A251 | 22 March 2021 | NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-20-0252 - LAR to Remove Extraneous Content and Requirements from the OL and TS (L-2021-LLA-0027) | Surveillance Frequency Control Program |
ML21039A638 | 8 February 2021 | NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1-RA-20-0311 - 10 CFR 50.69 Categorization Process to Reflect an Alternative Seismic Approach (L-2021-LLA-0003) | |
ML21036A114 | 5 February 2021 | NRR E-mail Capture - Request for Additional Information - Harris - Relief Request RA-20-0312 - SW Pinhole Leak (L-2020-LLR-0143) | Through-Wall Leak |
ML21049A263 | 4 February 2021 | NRR E-mail Capture - Request for Additional Information - Duke Energy Fleet License Amendment Request to Revise Emergency Plan | FLEX Siren |
ML21033A845 | 2 February 2021 | NRR E-mail Capture - State Notification of Amendments to Shearon Harris Nuclear Power Plant, Unit 1 - Revision Minimum RCS Flow Rate and Update COLR References | Exemption Request Affidavit |
ML21033B106 | 2 February 2021 | NRR E-mail Capture - (External_Sender) (External) State Notification of Amendments to Shearon Harris Nuclear Power Plant, Unit 1 - Revision Minimum RCS Flow Rate and Update COLR References | COVID-19 |
ML21032A049 | 1 February 2021 | NRR E-mail Capture - Request for Additional Information - Duke Fleet RA-20-0263 - Use of Later ASME B&Pv, XI for Repair - Replacement (L-2020-LLR-0124) | |
ML21025A292 | 25 January 2021 | NRR E-mail Capture - (External_Sender) State Notification of Amendment to Shearon Harris Nuclear Power Plant, Unit 1 - Revise TS 3/4.4.9, Pressure/Temperature Limits - Reactor Coolant System | COVID-19 |
ML21007A372 | 7 January 2021 | NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-19-0352 - Proposed Alternative for Reactor Vessel Close Stud Examinations (L-2020-LLR-0156) | |
ML21006A430 | 6 January 2021 | Acceptance Review - Duke Fleet RA-20-0207 Request to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) Instrumentation | |
ML21006A404 | 6 January 2021 | NRR E-mail Capture - State Notification of Amendment to Shearon Harris Nuclear Power Plant, Unit 1 - Revise TS 3/4.4.9, Pressure/Temperature Limits - Reactor Coolant System | Post Accident Monitoring Surveillance Frequency Control Program Exemption Request COVID-19 Fire Protection Program |
ML20345A305 | 10 December 2020 | NRR E-mail Capture - (External_Sender) (External) State Notification of Amendments to Shearon Harris Nuclear Power Plant, Unit 1 - Revise TS 3.3.3.6 and TS 3.9.2 | COVID-19 |
ML20344A419 | 9 December 2020 | NRR E-mail Capture - State Notification of Amendments to Shearon Harris Nuclear Power Plant, Unit 1 - Revise TS 3.3.3.6 and TS 3.9.2 | Post Accident Monitoring Surveillance Frequency Control Program Exemption Request COVID-19 Fire Protection Program |
ML20328A080 | 23 November 2020 | NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-20-0312-Relief Request, Service Water Pinhole Leak in a Socket Weld, Inservice Inspection (L-2020-LLR-0143) | Through-Wall Leak |
ML20323A407 | 18 November 2020 | NRR E-mail Capture - Request for Additional Information - Brunswick License Exemption Request from 10CFR73 Annual Force on Force Exercise Requirements (EPIC L-2020-LLE-0180) | Safeguards Contingency Plan Exemption Request Pandemic Coronavirus COVID-19 Grace period |
ML20297A310 | 13 October 2020 | NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0191 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI - IWA-5120, IWA-5213, IWA-5241, IWA-5242, and IWA-5250 (L-2020-LLR-0126) | Incorporated by reference |
ML20297A307 | 13 October 2020 | NRR E-mail Capture - Request for Additional Information - Shearon Harris Nuclear Power Plant, Unit 1 - RCS Flowrate Reduction/Lbloca LAR | |
ML20297A308 | 7 October 2020 | NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0263 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI for Repair/Replacement (L-2020-LLR-0124) | Incorporated by reference |
ML20297A309 | 6 October 2020 | NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0262 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI - IWA-4540(b) (L-2020-LLR-0125) | Incorporated by reference |
ML20274A046 | 29 September 2020 | Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Revision 2 | |
ML20247J382 | 3 September 2020 | Request for Additional Information - Shearon Harris Nuclear Power Plant, Unit 1 - Revise TS Related to Accident Monitoring and RFO Instrumentation | Anticipated operational occurrence |