MONTHYEARML23349A0272023-12-15015 December 2023 Acceptance of Requested Licensing Action License Amendment Request to Revise Technical Specification 5.5.2 ML23192A0552023-07-11011 July 2023 Relief Request Later Edition of ASME Code for ISI ML23144A0862023-05-24024 May 2023 Acceptance of Requested Licensing Action Proposed Relief Request (RA-23-0018) to Use ASME Code Case 853 ML23125A1452023-05-0505 May 2023 Change in Estimated Review Schedule and Level of Effort for Proposed Alternative to Use Code Case N-752 ML23087A2492023-03-27027 March 2023 50.69 Acceptance Email ML23073A2282023-03-13013 March 2023 Duke Fleet- Adoption of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements - Acceptance Review ML23058A0562023-02-27027 February 2023 Acceptance of Amendment to Revise Surveillance Frequencies for RCS Pressure Isolation Valve Operational Leakage Testing and Reactor Trip System Instrumentation ML23048A1512023-02-16016 February 2023 Acceptance Review - Proposed Alternative for Steam Generator Welds (L-2023-LLR-0003) ML22291A4602022-10-17017 October 2022 Relief Request Impractical RPV and Rx Coolant Sys. Welds ML22235A6552022-08-23023 August 2022 Acceptance of Requested Licensing Action Proposed Alternative to Use ASME Code Case N-752 ML22146A3652022-05-25025 May 2022 Acceptance of Requested Licensing Action License Amendment Request for Application to Revise Surveillance Requirement 3.8.1.16 ML22112A1892022-04-22022 April 2022 Acceptance Review for Additional Mode Change Limitations Applicable to the Adoption of TSTF- 359, Revision 9 ML22012A3662022-01-12012 January 2022 Acceptance of Requested Licensing Action License Amendment Re2uest for Application to Revise Technical Specification to Adopt TSTF-577, Revised Frequencies for Steam Generating Tube Inspections ML22005A0872022-01-0505 January 2022 Acceptance of Requested Licensing Action Correction to Non-Conservative Technical Specifications Figure 3.4.3-2, Pressure/Temperature Limit Cooldown Curves ML21231A1642021-08-19019 August 2021 Acceptance of Five Requested Licensing Actions Code Cases OMN-22, OMN-24, OMN-26, OMN-28, and Paragraph ISTB-3540(b) ML21146A1782021-05-26026 May 2021 Acceptance of Proposed Alternative for Inservice Inspection of Containment Post-Tensioning System Components ML21082A0162021-03-22022 March 2021 Accepted for Review - Brunswick License Amendment Request to Change Tech Spec Limit for Standby Liquid Control System Boron Solution Storage Tank Volume L-2021-LLA-0022 ML21006A4302021-01-0606 January 2021 Acceptance Review - Duke Fleet RA-20-0207 Request to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) Instrumentation ML20157A1062020-06-24024 June 2020 Review of the Fall 2019 Steam Generator Tube Inspections During Refueling Outage No. 22 ML20133K0722020-05-12012 May 2020 Acceptance of Requested Licensing Action Technical Specifications Related to Reducing the Minimum Required Reactor Coolant System Flow Rate and Update the List of Analytical Methods Used in the Determination of Core Operating Limits ML19311C3412019-11-0707 November 2019 Acceptance Review: Shearon Harris License Amendment Request for TSTF-505 ML19211C9982019-07-29029 July 2019 FW: Acceptance Review for Volumetric or Surface Examination of Code Case N-729-4 Examinations of the Reactor Pressure Vessel Upper Head ML18270A1292018-10-0404 October 2018 Acceptance of Requested Licensing Action ML17319A5012017-11-21021 November 2017 Acceptance Review Letter, License Amendment Request to Revise Updated Final Safety Analysis Report to Incorporate Tornado Missile Risk Evaluator Methodology Into Licensing Basis ML17319A4342017-11-17017 November 2017 Acceptance Review Results for Relief Request No. 17-ON-001 ML17261A7272017-09-20020 September 2017 Shearon Harris Nuclear Power Plant, Unit 1 - Acceptance of Requested Licensing Action Regarding Spent Fuel Storage Pool Criticality Analyses (CAC No. MF9996) ML17167A3172017-06-30030 June 2017 Supplemental Information Needed for Acceptance of Requested Licensing Action LAR Proposing Changes to TS3.8.1, AC Source-Operating (CAC Nos. MF9667 Through MF9674) ML16308A3702016-11-0707 November 2016 Results of Acceptance Review of Requested Licensing Action Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0 (CAC Nos. MF8422-MF8429) ML16225A6542016-08-11011 August 2016 Email - McGuire Unit No. 1: Acceptance REVIEW- Relief Request 16-MN-003 Alternative to Defect Removal Prior to Performing Temporary Repair Activities on Three-Inch-Diameter Nuclear Service Water System Piping. ML16215A0972016-08-0101 August 2016 Email - McGuire Units 1 and 2: Acceptance REVIEW- LAR for TS 3.6.14, Divider Barrier Integrity - Hatch to Be Open for Up to 48 Hours ML16152A5962016-06-0303 June 2016 NRC Acceptance of Requested Licensing Action Amendment Request ML16113A3012016-05-0303 May 2016 Acceptance Review of License Amendment Request Alternative Verification of Ice Condenser Lower Inlet Door Position ML16085A0992016-03-31031 March 2016 Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Request for Control Room Chilled Water System Technical Specifications ML16055A3332016-03-0101 March 2016 Supplemental Information Needed for Acceptance of Requested Licensing Action LAR for Control Room Chilled Water System TS ML16050A0692016-02-19019 February 2016 E-mail from J. Whited to L. Rudy-Acceptance of Catawba LAR Containment Leakage Rate Testing Program ML15351A4212015-12-17017 December 2015 E-mail from J. Whited to C. Wasik Acceptance for Review of Relief Request ON-GRR-001; Code Case OMN-20 ML15309A7282015-12-0101 December 2015 Acceptance of Requested Licensing Action Regarding Duke Energy Progress, Inc. Application to Revise Technical Specifications to Adopt Methodology Report ML15294A5402015-10-28028 October 2015 Acceptance for Technical Review: Exemption from Title 10 of the Code of Federal Regulations Part 74.19(c) ML15266A3692015-10-0505 October 2015 Acceptance for Technical Review: Exemption from Title 10 of the Code of Federal Regulations (10 Cfr), Part 74.19(c) ML15268A4752015-09-25025 September 2015 E-mail from J. Whited to C. Wasik Acceptance of Oconee LAR to Correct Usage Problems with TS 3.8.1 (TAC Nos. MF6627-MF6629) ML15195A5952015-07-14014 July 2015 E-mail from J. Whited to C. Wasik Acceptance Review of Oconee License Amendment Request to Change ONS EAL Scheme Based on NEI 99-01 Rev. 6 (TAC Nos. MF6454-MF6456) ML15089A1272015-03-30030 March 2015 E-mail Accepted for Review of License Amendment Request to Adopt Topical Report ANP-10298P-A Ace/Atrium Fuel ML15020A2292015-01-20020 January 2015 E-mail from Jwhited to Cwasik Acceptance of Oconee LAR Adoption of TSTF-513 (TAC Nos. MF5403-MF5405) ML14324A9642014-12-0909 December 2014 Acceptance Review of Proposed Changes to Quality Assurance Topical Report ML14246A4552014-09-0808 September 2014 Acceptance Review of License Amendment Request Measurement Uncertainty Recapture Power Uprate ML14157A0552014-06-13013 June 2014 Acceptance of Requested Relief Request I3R-14-Deferral of Reactor Vessel Inspections Inservice Inspection Program-Third 10-Year Interval ML14014A2792014-01-15015 January 2014 Acceptance of Requested Licensing Action License Amendment Request to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating ML14010A4612014-01-15015 January 2014 Acceptance of Requested Licensing Action License Amendment Request to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants ML13354B8792013-12-31031 December 2013 Acceptance Review Results License Amendment Request to Adopt National Fire Protection Association 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants ML13343A0022013-12-0909 December 2013 12/9/13 Email from R.Guzman to S.Severance - Oconee Nuclear Station License Amendment Request Standby Shutdown Facility Quality Requirements - Acceptance Review Determination (TAC Nos. MF3000, 3001, and 3002) 2023-07-11
[Table view] Category:E-Mail
MONTHYEARML24025A1592024-01-25025 January 2024 NRR E-mail Capture - Shearon Harris Nuclear Power Plant, Unit 1 - Request for Additional Information - Rvi AMP and Inspection Plan (L-2023-LLL-0016) ML24029A1132024-01-16016 January 2024 Notification of Inspection and Request for Information (Email) ML24002A7382024-01-0202 January 2024 NRR E-mail Capture - Request for Additional Information Regarding Duke'S August 20, 2023, License Amendment Request for Robinson, Unit 2 ML23349A0272023-12-15015 December 2023 Acceptance of Requested Licensing Action License Amendment Request to Revise Technical Specification 5.5.2 ML23284A3322023-10-11011 October 2023 Request for Additional Information Alternative Request (RA-22-0174) (L-2022-LLR-0060) ML23271A1792023-09-28028 September 2023 Request for Confirmation License Amendment Application to Revise Control Room Cooling TS 3.7.11 ML23270B8362023-09-26026 September 2023 Code Case N-752 Audit September 26, 2023, E-mail Providing Additional Information Regarding the Use of Owner'S Requirements and Engineering Judgment in Lieu of Code and Standards ML23267A0032023-09-21021 September 2023 RP Inspection Document Request ML23262B4502023-09-19019 September 2023 NRR E-mail Capture - H. B. Robinson Steam Electric Plant, Unit 2 - Acceptance of License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures Based on Leak-Before-Break Methodology ML23248A2612023-09-0505 September 2023 NRR E-mail Capture - Brunswick Steam Electric Plant, Units 1 and 2 - Acceptance of License Amendment Request to Revise the 10 CFR 50.69 Categorization Process ML23269A0412023-08-22022 August 2023 Code Case N-752 Audit; August 22, 2023, E-mail Providing Additional Information Regarding Design and Quality Program Requirements ML23220A2342023-08-0808 August 2023 NRR E-mail Capture - Robinson, Unit 2 - Acceptance Review Results for Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule ML23202A0652023-07-19019 July 2023 NRR E-mail Capture - Request for Additional Information - Brunswick Steam Electric Plant, Units 1 and 2, Torus Liner Inspection Alternative Request (L-2022-LLR-0089) ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23192A0552023-07-11011 July 2023 Relief Request Later Edition of ASME Code for ISI ML23188A0732023-07-0707 July 2023 Acceptance of Requested Licensing Action License Amendment Application to Revise Control Room Cooling Technical Specifications ML23177A1992023-06-26026 June 2023 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-23-0005 - LAR to Align Certain TSs with ISTS (L-2023-LLA-0078) ML23172A0132023-06-20020 June 2023 Duke Fleet - Correction to June 2, 2023, Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement Frequencies ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined ML23153A1892023-06-0202 June 2023 Duke Fleet - Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement Frequencies ML23151A3482023-05-30030 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23144A0862023-05-24024 May 2023 Acceptance of Requested Licensing Action Proposed Relief Request (RA-23-0018) to Use ASME Code Case 853 ML23142A2732023-05-22022 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML23131A4192023-05-10010 May 2023 003 Radiation Safety Baseline Inspection Information Request ML23125A1452023-05-0505 May 2023 Change in Estimated Review Schedule and Level of Effort for Proposed Alternative to Use Code Case N-752 ML23124A1212023-05-0404 May 2023 Acceptance of Requested Licensing Action Duke Fleet Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23095A0052023-04-0404 April 2023 002 Radiation Safety Baseline Inspection Information Request ML23087A0282023-03-27027 March 2023 Acceptance of Requested Licensing Action Amendment TSTF-505 ML23087A2492023-03-27027 March 2023 50.69 Acceptance Email ML23086C0362023-03-27027 March 2023 Request for Additional Information Steam Generator Tube Inspection Report (03R31) ML23082A0432023-03-23023 March 2023 002 Radiation Safety Baseline Inspection Information Request Final ML23080A1892023-03-20020 March 2023 RP Inspection Document Request ML23073A2282023-03-13013 March 2023 Duke Fleet- Adoption of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements - Acceptance Review ML23065A0942023-03-0606 March 2023 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-22-0081 - LAR to Address Administrative Changes to the Operating License and Technical Specifications (L-2023-LLA-0020) ML23058A0562023-02-27027 February 2023 Acceptance of Amendment to Revise Surveillance Frequencies for RCS Pressure Isolation Valve Operational Leakage Testing and Reactor Trip System Instrumentation ML23048A1512023-02-16016 February 2023 Acceptance Review - Proposed Alternative for Steam Generator Welds (L-2023-LLR-0003) ML23038A1832023-02-0707 February 2023 Request for Additional Information Alternative Request (RA-22-0174) to Use ASME Code Case N-752 ML23030B9032023-01-30030 January 2023 Formal Release of RAIs for McGuire Unit 1, Relief Request Impractical RPV Rx Coolant System Welds, Due March 1, 2023 (Email) ML23032A2472023-01-26026 January 2023 Document Request Letter for Brunswick Upcoming RP Inspection 2023002 ML23018A1892023-01-17017 January 2023 Document Request for RP Inspection at Brunswick Inspection Report 2023-01 ML23031A1552023-01-17017 January 2023 1/17/2023 Email from John Moses, Deputy Director, Division of Rulemaking, Environmental, and Financial Support, to Diane Curran, Counsel to Beyond Nuclear and the Sierra Club, Request for Extension of Scoping Comment Period for Oconee EIS ML23017A2232023-01-13013 January 2023 Request for Additional Information (RAI) Issuance for McGuire Unit 1 Steam Generator Tube Inspection Report (Email) ML23011A0152023-01-11011 January 2023 NRR E-mail Capture - Request for Additional Information to Duke'S Request for Robinson to Add Feedwater Isolation Function to TS 3.3.2 and Remove Obsolete Content from TSs 2.1.1.1 and 5.6.5.b ML23006A1892023-01-0606 January 2023 NRR E-mail Capture - Corrected - Acceptance Review Results for Brunswick, Unit Nos. 1 and 2 - Proposed Alternative Request RA-22-0308 ML23006A0642023-01-0606 January 2023 NRR E-mail Capture - Acceptance Review Results for Brunswick, Unit Nos. 1 and 2 - Proposed Alternative Request RA-22-0308 ML22336A0692022-11-28028 November 2022 Final 2023 Catawba Nuclear Station (CNS) Commercial Grade Dedication (CGD) Inspection Information Request ML22303A0052022-10-24024 October 2022 EN 56178 - Tioga Final. LTR-TP-22-29 2021 10CFR Part 21 Improper Notification of NRC ML22294A0812022-10-21021 October 2022 Nrc/Duke Steam Generator Inspection Call for November 8, 2022 ML22291A4602022-10-17017 October 2022 Relief Request Impractical RPV and Rx Coolant Sys. Welds ML22285A1552022-10-12012 October 2022 NRR E-mail Capture - H. B. Robinson, Unit 2 - Acceptance of License Amendment Request Regarding the Addition of Feedwater Isolation Function to TS 3.3.2 and Removal of Obsolete Content from TS 2.1.1.1 and TS 5.6.5.b 2024-01-25
[Table view] |
Text
From: Natreon Jordan To: Treadway, Ryan I Cc: Courtenay, Christopher C; jordan.vaughan@duke-energy.com
Subject:
Duke Fleet - Adoption of TSTF-554, Revision 1, "Revise Reactor Coolant Leakage Requirements" - Acceptance Review (L-2023-LLA-0028)
Date: Monday, March 13, 2023 12:26:00 PM Mr. Treadway, By submittal dated February 16, 2023, (Agencywide Documents and Access Management System (ADAMS) Accession No. ML23047A004), Duke Energy Progress, LLC and Duke Energy Carolinas, LLC, collectively referred to as Duke Energy (the licensee) requested amendments to the Renewed Facility Operating License Nos. DPR-71 and DPR-62 for Brunswick Steam Electric Plant, Unit Nos. 1 and 2; Renewed Facility Operating License Nos. NPF-35 and NPF-52 for Catawba Nuclear Station, Unit Nos. 1 and 2; Renewed Facility Operating License No. NPF-63 for Shearon Harris Nuclear Power Plant, Unit No. 1; Renewed Facility Operating License Nos. NPF-9 and NPF-17 for McGuire Nuclear Station, Unit Nos. 1 and 2; Renewed Facility Operating License Nos. DPR-38, DPR-47, and DPR-55 for Oconee Nuclear Station, Unit Nos. 1, 2, and 3; and Renewed Facility Operating License No. DPR-23 for H. B. Robinson Steam Electric Plant, Unit No. 2. The proposed license amendments would allow the licensee to adopt TSTF-554, Revision 1, "Revise Reactor Coolant Leakage Requirements" for the aforementioned facilities. The purpose of this correspondence is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original application. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your submittal and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.
Based on the information provided in your submittal, the NRC staff has estimated that the LAR will take approximately 185 hours0.00214 days <br />0.0514 hours <br />3.058862e-4 weeks <br />7.03925e-5 months <br /> to complete. The NRC staff expects to complete the review of the licensing action by November 13, 2023. If there are emergent complexities or
challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager. These estimates are based on the NRC staffs initial review of the application, and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delays may occur if the submittal is provided to the NRC in advance of or in parallel with industry program initiatives or pilot applications. If you have any questions, please contact me at (301) 415-7410.
- Thanks,
- Nate Natreon (Nate) Jordan Nuclear Engineer (Project Manager)
Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8B1A Washington, DC 20555 301-415-7410 natreon.jordan@nrc.gov