MONTHYEARML24025A1592024-01-25025 January 2024 NRR E-mail Capture - Shearon Harris Nuclear Power Plant, Unit 1 - Request for Additional Information - Rvi AMP and Inspection Plan (L-2023-LLL-0016) ML23177A1992023-06-26026 June 2023 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-23-0005 - LAR to Align Certain TSs with ISTS (L-2023-LLA-0078) ML23172A0132023-06-20020 June 2023 Duke Fleet - Correction to June 2, 2023, Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement Frequencies ML23153A1892023-06-0202 June 2023 Duke Fleet - Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement Frequencies ML23151A3482023-05-30030 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23142A2732023-05-22022 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML23124A1212023-05-0404 May 2023 Acceptance of Requested Licensing Action Duke Fleet Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23082A0432023-03-23023 March 2023 002 Radiation Safety Baseline Inspection Information Request Final ML23073A2282023-03-13013 March 2023 Duke Fleet- Adoption of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements - Acceptance Review ML23065A0942023-03-0606 March 2023 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-22-0081 - LAR to Address Administrative Changes to the Operating License and Technical Specifications (L-2023-LLA-0020) ML23058A0562023-02-27027 February 2023 Acceptance of Amendment to Revise Surveillance Frequencies for RCS Pressure Isolation Valve Operational Leakage Testing and Reactor Trip System Instrumentation ML23048A1512023-02-16016 February 2023 Acceptance Review - Proposed Alternative for Steam Generator Welds (L-2023-LLR-0003) ML22237A1632022-08-25025 August 2022 004 Radiation Safety Baseline Inspection Information Request ML22115A1412022-04-25025 April 2022 NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition Information ML22108A0182022-04-15015 April 2022 NRR E-mail Capture - Accepted for Review - Duke Energy Relief Request for Harris Nuclear Plant Inservice Testing Program Plan - Fourth Ten-Year Interval to Extend Type C Test to 75 Months ML22083A0702022-03-24024 March 2022 NRR E-mail Capture - Catawba Nuclear Station, Units 1 and 2, Shearon Harris Nuclear Power Plant, Unit 1, and McGuire Nuclear Station, Units 1 and 2 - Acceptance Review for TSTF-569 LAR ML22083A0282022-03-23023 March 2022 Email Snsb Safety Evaluation for Harris LAR to Revise Reactor Protection System TS ML22038A1572022-02-0707 February 2022 NRR E-mail Capture - Duke Energy Fleet - Acceptance of License Amendment Request Regarding Adoption of TSTF-541, Revision 2 ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML21361A0122021-12-23023 December 2021 NRR E-mail Capture - Accepted for Review - Duke Energy Fleet License Amendment Request to Relocate Emergency Operations Facility ML21354A8612021-12-15015 December 2021 NRR E-mail Capture - Request for Additional Information - Duke Fleet Request RA-19-0352 - Alternative for RPV Closure Stud Exams (L-2020-LLR-0156) ML21321A3782021-11-16016 November 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSEL Unit 1 - Acceptance of License Amendment Request Adoption of TSTF-554 EPID-L-2021-LLA-0193 ML21288A0802021-10-15015 October 2021 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-21-0213 - Remove Limitations to Perform Certain SRs During Shutdown (L-2021-LLA-0167) ML21295A0372021-10-0505 October 2021 NRR E-mail Capture - Accepted for Review - Duke Energy Fleet License Amendment Request to Adopt TSTF-577 Revised Frequencies for Steam Generator Tube Inspections ML21252A0112021-08-30030 August 2021 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1- RA-21-0191 - Revised TS Related to Reactor Trip System Instrumentation (L-2021-LLA-0149) ML21189A0282021-07-0101 July 2021 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-21-0112 - Revise TS to Reflect Development of TRM (L-2021-LLA-0108) ML21172A2432021-06-21021 June 2021 NRR E-mail Capture - Request for Additional Information - Harris RA-20-0252 - LAR to Remove Extraneous Requirements from OL and TS (L-2021-LLA-0027) ML21106A0112021-04-15015 April 2021 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-21-0052 - Revise Containment Spray Nozzle Surveillance Frequency (L-2021-LLA-0058) ML21084A2492021-03-24024 March 2021 Notification of Inspection and Request for Information ML21084A2512021-03-22022 March 2021 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-20-0252 - LAR to Remove Extraneous Content and Requirements from the OL and TS (L-2021-LLA-0027) ML21039A6382021-02-0808 February 2021 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1-RA-20-0311 - 10 CFR 50.69 Categorization Process to Reflect an Alternative Seismic Approach (L-2021-LLA-0003) ML21036A1142021-02-0505 February 2021 NRR E-mail Capture - Request for Additional Information - Harris - Relief Request RA-20-0312 - SW Pinhole Leak (L-2020-LLR-0143) ML21049A2632021-02-0404 February 2021 NRR E-mail Capture - Request for Additional Information - Duke Energy Fleet License Amendment Request to Revise Emergency Plan ML21033A8452021-02-0202 February 2021 NRR E-mail Capture - State Notification of Amendments to Shearon Harris Nuclear Power Plant, Unit 1 - Revision Minimum RCS Flow Rate and Update COLR References ML21033B1062021-02-0202 February 2021 NRR E-mail Capture - (External_Sender) (External) State Notification of Amendments to Shearon Harris Nuclear Power Plant, Unit 1 - Revision Minimum RCS Flow Rate and Update COLR References ML21032A0492021-02-0101 February 2021 NRR E-mail Capture - Request for Additional Information - Duke Fleet RA-20-0263 - Use of Later ASME B&Pv, XI for Repair - Replacement (L-2020-LLR-0124) ML21025A2922021-01-25025 January 2021 NRR E-mail Capture - (External_Sender) State Notification of Amendment to Shearon Harris Nuclear Power Plant, Unit 1 - Revise TS 3/4.4.9, Pressure/Temperature Limits - Reactor Coolant System ML21007A3722021-01-0707 January 2021 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-19-0352 - Proposed Alternative for Reactor Vessel Close Stud Examinations (L-2020-LLR-0156) ML21006A4302021-01-0606 January 2021 Acceptance Review - Duke Fleet RA-20-0207 Request to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) Instrumentation ML21006A4042021-01-0606 January 2021 NRR E-mail Capture - State Notification of Amendment to Shearon Harris Nuclear Power Plant, Unit 1 - Revise TS 3/4.4.9, Pressure/Temperature Limits - Reactor Coolant System ML20345A3052020-12-10010 December 2020 NRR E-mail Capture - (External_Sender) (External) State Notification of Amendments to Shearon Harris Nuclear Power Plant, Unit 1 - Revise TS 3.3.3.6 and TS 3.9.2 ML20344A4192020-12-0909 December 2020 NRR E-mail Capture - State Notification of Amendments to Shearon Harris Nuclear Power Plant, Unit 1 - Revise TS 3.3.3.6 and TS 3.9.2 ML20328A0802020-11-23023 November 2020 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-20-0312-Relief Request, Service Water Pinhole Leak in a Socket Weld, Inservice Inspection (L-2020-LLR-0143) ML20323A4072020-11-18018 November 2020 NRR E-mail Capture - Request for Additional Information - Brunswick License Exemption Request from 10CFR73 Annual Force on Force Exercise Requirements (EPIC L-2020-LLE-0180) ML20297A3072020-10-13013 October 2020 NRR E-mail Capture - Request for Additional Information - Shearon Harris Nuclear Power Plant, Unit 1 - RCS Flowrate Reduction/Lbloca LAR ML20297A3102020-10-13013 October 2020 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0191 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI - IWA-5120, IWA-5213, IWA-5241, IWA-5242, and IWA-5250 (L-2020-LLR-0126) ML20297A3082020-10-0707 October 2020 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0263 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI for Repair/Replacement (L-2020-LLR-0124) ML20297A3092020-10-0606 October 2020 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0262 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI - IWA-4540(b) (L-2020-LLR-0125) ML20274A0462020-09-29029 September 2020 Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Revision 2 ML20247J3822020-09-0303 September 2020 Request for Additional Information - Shearon Harris Nuclear Power Plant, Unit 1 - Revise TS Related to Accident Monitoring and RFO Instrumentation 2024-01-25
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24025A1592024-01-25025 January 2024 NRR E-mail Capture - Shearon Harris Nuclear Power Plant, Unit 1 - Request for Additional Information - Rvi AMP and Inspection Plan (L-2023-LLL-0016) ML23151A3482023-05-30030 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23142A2732023-05-22022 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML23082A0432023-03-23023 March 2023 002 Radiation Safety Baseline Inspection Information Request Final ML23020A1252023-01-23023 January 2023 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000400/2023403) ML22115A1412022-04-25025 April 2022 NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition Information ML21354A8612021-12-15015 December 2021 NRR E-mail Capture - Request for Additional Information - Duke Fleet Request RA-19-0352 - Alternative for RPV Closure Stud Exams (L-2020-LLR-0156) ML21258A3652021-09-15015 September 2021 Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000400/2021011) and Request for Information (RFI) ML21172A2432021-06-21021 June 2021 NRR E-mail Capture - Request for Additional Information - Harris RA-20-0252 - LAR to Remove Extraneous Requirements from OL and TS (L-2021-LLA-0027) ML21036A1142021-02-0505 February 2021 NRR E-mail Capture - Request for Additional Information - Harris - Relief Request RA-20-0312 - SW Pinhole Leak (L-2020-LLR-0143) ML21049A2632021-02-0404 February 2021 NRR E-mail Capture - Request for Additional Information - Duke Energy Fleet License Amendment Request to Revise Emergency Plan ML21032A0492021-02-0101 February 2021 NRR E-mail Capture - Request for Additional Information - Duke Fleet RA-20-0263 - Use of Later ASME B&Pv, XI for Repair - Replacement (L-2020-LLR-0124) ML20323A4072020-11-18018 November 2020 NRR E-mail Capture - Request for Additional Information - Brunswick License Exemption Request from 10CFR73 Annual Force on Force Exercise Requirements (EPIC L-2020-LLE-0180) ML20297A3072020-10-13013 October 2020 NRR E-mail Capture - Request for Additional Information - Shearon Harris Nuclear Power Plant, Unit 1 - RCS Flowrate Reduction/Lbloca LAR ML20274A0462020-09-29029 September 2020 Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Revision 2 ML20247J3822020-09-0303 September 2020 Request for Additional Information - Shearon Harris Nuclear Power Plant, Unit 1 - Revise TS Related to Accident Monitoring and RFO Instrumentation ML19331A4002019-11-27027 November 2019 Request for Additional Information Regarding Licensing Action to Modify the Departure from Nucleate Boiling Ratio Safety Limit to Address Transition to New Fuel Type ML19204A2682019-07-23023 July 2019 NRR E-mail Capture - Shearon Harris Nuclear Power Plant, Unit 1 Request for Additional Information for the Escw System TS AOT Extension and Removal of an Expired Note in TS Risk Informed LAR (L-2019-LLA-0025) ML19136A2712019-05-28028 May 2019 Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding License Amendment Request to Modify the Departure from Nucleate Boiling Ratio Safety Limit to Address Transition to New Fuel Type ML19060A0912019-03-18018 March 2019 Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML19011A1372019-01-10010 January 2019 NRR E-mail Capture - Duke Energy Fleet RAIs - Relief Request 18-GO-001 - Proposed Alternative for Depth Sizing Qualification Examination of Welds (L-2018-LLR-0117) ML19007A3422018-12-21021 December 2018 NRR E-mail Capture - Duke Energy Fleet Draft RAIs - Relief Request 18-GO-001 - Proposed Alternative for Depth Sizing Qualification Examination of Welds (L-2018-LLR-0117) ML18332A4392018-11-28028 November 2018 NRR E-mail Capture - Shearon Harris Nuclear Power Plant, Unit 1 Request for Additional Information for EAL Scheme Changes ML18337A1272018-11-28028 November 2018 NRR E-mail Capture - Shearon Harris Nuclear Power Plant, Unit 1 Request for Additional Information Regarding the Rts/Esfas Trip Setpoints Modification LAR ML18264A0282018-10-0909 October 2018 RAI Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk Informed Categorization Aad Treatment of Structures, Systems and Components for Nuclear Power Reactors ML18145A1812018-06-18018 June 2018 Request for Additional Information, License Amendment Request to Revise Updated Final Safety Analysis Report to Incorporate Tornado Missile Risk Evaluator Methodology Into Licensing Basis RA-18-0011, Response to Request for Supplemental Information Regarding Duke Energy'S Response to GL 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools2018-05-30030 May 2018 Response to Request for Supplemental Information Regarding Duke Energy'S Response to GL 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools ML18116A1052018-04-25025 April 2018 NRR E-mail Capture - Harris/Robinson RAIs - Change Technical Specifications to Support Performance of Core Reload Design and Safety Analyses (L-2017-LLA-0356) ML18108A7602018-04-18018 April 2018 NRR E-mail Capture - Harris/Robinson Draft RAIs - Change Technical Specifications to Support Performance of Core Reload Design and Safety Analyses (L-2017-LLA-0356) ML18058B2242018-02-26026 February 2018 Emailed Radiation Safety RFI ML18005A5482018-01-0808 January 2018 Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses (CAC No. MF9996; EPID L-2017-LLA-0303) ML17345A8772017-12-11011 December 2017 NRR E-mail Capture - Harris and Robinson Supplemental RAI - LAR to Adopt DPC-NE-3009-P, Revision 0, Thermal-Hydraulic Models for Transient Analysis, (L-2016-LLA-0012) ML17339A0722017-12-0404 December 2017 NRR E-mail Capture - Subject: Harris and Robinson Draft Supplemental RAIs - LAR to Adopt DPC-NE-3009-P, Revision 0, Thermal-Hydraulic Models for Transient Analysis, (L-2016-LLA-0012) ML17289A3062017-10-23023 October 2017 Shearon Harris Nuclear Plant, Unit 1 - Request for Additional Information Regarding License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements (CAC No. MF9828; EPID L-2017-LLA-0244) ML17250B0172017-09-18018 September 2017 Shearon Harris, Unit 1 - Request for Additional Information Re: License Amendment Request Proposing New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods that Exceed the LHGR Limit Detailed in RG 1.183, Table 3 (CAC No. MF9740) ML17241A0182017-08-30030 August 2017 Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Spent Fuel Storage Pool Criticality Analyses ML17192A4842017-07-11011 July 2017 NRR E-mail Capture - Duke Energy Fleet RAIs Alternative for Reactor Pressure Vessel Flange Threads Examination (MF9513 to MF9521) ML17123A1332017-05-0909 May 2017 Shearon Harris Nuclear Plant, Unit 1 - Request for Additional Information Re: License Amendment Request to Relocate Specific TS Parameters to the COLR, Remove Reference to a Plant Procedure as it Pertains to the COLR in TSs, etc. (CAC No. MF8894) ML17109A2912017-04-19019 April 2017 NRR E-mail Capture - Shearon Harris Nuclear Power Plant, Unit 1 Final Request for Additional Information Concerning LAR to Adopt TSTF-339, TSTF-5 and Other Administrative Changes ML16363A0112016-12-27027 December 2016 Notification of Shearon Harris Nuclear Power Plant Design Basis Assurance Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000400/2017007 ML16335A0462016-12-0606 December 2016 Shearon Harris Nuclear Power Plant, Unit 1 - Request for Additional Information Regarding License Amendment Request to Modify Diesel Fuel Oil Testing Surveillance Requirements (CAC No. MF7775) ML16288A0782016-10-26026 October 2016 Shearon Harris Nuclear Power Plant, Unit 1, and H.B. Robinson Steam Electric Plant, Unit No. 2 - Redacted, Request for Additional Information Re: Request to Adopt DPC-NF-2010 and DPC-NF-2011 Nuclear Design Methodology (CAC Nos. MF7693 and MF7694) ML16288A0042016-10-26026 October 2016 Shearon Harris Nuclear Plant, Unit 1 - Request For Additional Information Regarding License Amendment Request To Relocate The Explosive Gas Mixture And Liquid Holdup Tanks Technical Specifications Requirements (CAC No. MF8067) ML16223A4172016-08-0808 August 2016 Notification of Inspection and Request for Information ML16209A2642016-08-0202 August 2016 Shearon Harris Nuclear Plant, Unit 1 - Second Request For Additional Information Regarding License Amendment Request For A Temporary Change To Technical Specifications For The 'A' Emergency Service Water Pump Replacement (CAC No. MF7017) ML16028A1972016-02-0808 February 2016 Request for Additional Information Regarding License Amendment Request for a Temporary Change to Technical Specifications for the 'A' Emergency Service Water Pump Replacement ML15344A0302015-12-17017 December 2015 Request for Additional Information Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 5, Thermal Hydraulic Statistical Core Design Methodology (MF5872/MF5873) ML15320A3862015-11-19019 November 2015 RAI LAR to Adopt TSTF-523 ML15314A3592015-11-10010 November 2015 Duke Energy Draft RAIs Request to Adopt TSTF-523 (CAC Nos. MF6413-MF6422) ML15314A3562015-11-10010 November 2015 E-mail from J. Whited to A. Zaremba Duke Energy Draft RAIs License Amendment Request to Adopt TSTF-523 (CAC Nos. MF6413-MF6422) 2024-01-25
[Table view] |
Text
From: Bob Kellner To: McDaniel, Sarah A
Subject:
NRC Radiation Safety Inspection at Harris - June 2023 Date: Tuesday, March 21, 2023 11:37:00 AM Attachments: Harris 2023-002 Radiation Safety Baseline Inspection Information Request.pdf
- Sarah, Thank you for confirming that you will be the point of contact for the upcoming scheduled Radiation Safety Inspection at Harris.
Attached is a list of documents and information requested for the inspection. The request includes a list of the documents we routinely request for Inspection Procedures (IPs) 71124.01, 71124.08, and 71151. If you plan to upload the requested documents to CERTREC, using software to zip the numerous files into a single file prior to upload has proven to be very efficient.
As mentioned previously, the plan is to be onsite the week of June 26 - June 30, 2023.
As of right now, Jack Bell and I will be the inspectors of record coming onsite.
I would appreciate it if you would let me know if Harris has any COVID-19 restrictions in place. If I receive any information on restriction of travel from NRC management, I will you let you know.
Please let me know if you have any questions.
- Regards, Bob Robert Kellner Senior Health Physicist USNRC/Region II/DRS/EB3 Marquis One Tower Suite 1200 245 Peachtree Center Ave, NE Atlanta, GA 30303-1257 (404) 997-4508
ML23082A043 Shearon Harris Nuclear Plant RP Radiation Safety Baseline Inspection Initial Information Request Inspection Report: 05000400/2023002 During the week of June 26 - 30, 2023, the U.S. Nuclear Regulatory Commission (NRC) will perform a baseline Radiation Safety Inspection at the Shearon Harris Nuclear Plant (NRC Inspection Procedures 71124.01, 71124.08, and 71151 (Occupational PIV).
To minimize the impact to your onsite resources during the inspection and ensure the inspectors have the necessary information to complete the inspection while on-site, we have enclosed a request for documents needed for this activity. The NRC requests that these documents be provided to the inspectors no later than June 12, 2023.
If there are any questions about this inspection or the material requested, please contact the lead inspector, Robert Kellner at 404-997-4508, or the Engineering Branch 3 Chief, Binoy Desai at 404-997-4519.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding: a copy of this document will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/readingrm/adams.html..
PAPERWORK REDUCTION ACT STATEMENT This document does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget under control numbers 3150-0008, 3150-0011, 3150-0014, 3150-0044, and 3150-0135.
PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement, unless the requesting document displays a currently valid Office of Management and Budget control number.
Document Request List Occupational and Public Radiation Safety Cornerstones Licensee: Shearon Harris Nuclear Plant Regulatory Affairs
Contact:
Sarah McDaniel (984) 229-2002, sarah.mcdaniel@duke-energy.com Docket Number: 050-00400 Inspection Dates: June 26 to 30, 2023 Documents Due to Region II by: June 12, 2023 NRC Inspection Procedures (IPs):
- 71124.01 - Radiological Hazard Assessment and Exposure Controls
- 71124.08 - Radioactive Solid Waste Processing and Radioactive Material Handling, Storage and Transportation
- 71151 - Performance Indicator Verification Note: Please provide the current version of these documents in an electronic format if possible (The preferred file format is MSWord, or searchable .pdf files). To the extent possible, please organize the information in directories as requested below and if possible, use a descriptive name for the files provided. Recent experience has demonstrated the most efficient method to transfer this information to the NRC is via CERTREC. It is best to upload all the requested information in one large zip file. If there are questions regarding the documents requested, or method of transfer, please do not hesitate to contact the lead inspector.
Documentation for IP 71124.01 should be from November 1, 2022, and from September 1, 2022, for IP 71151. Documentation for IP 71124.08 should be from November 1, 2020. These dates are approximate to the last time these inspections were conducted. Also, provide only a listing and title for NCRs requested for each inspection procedure and inspectors will select a sample from these for in-depth review during the inspection.
If you have any questions, please call Robert Kellner at (404) 997-4508. Thank you in advance for your effort in putting together this material.
71124.01 - Radiological Hazard Assessment and Exposure Controls (Last inspected in November 2022)
- 1. List of active Radiation Work Permits (RWPs) [including number, title, task (if RWPs contain multiple tasks), their dose and dose rate limits].
- 2. Site and Corporate procedures related to Health Physics (HP) controls (e.g., posting, labeling, surveys, RWPs, contamination control, high radiation area (HRA)/LHRA/VHRA control, key control, control of divers, special controls during fuel offload, hot spots, etc.).
- 3. Procedures related to release of personnel and materials (e.g., release surveys, decontamination, guidance for alarm follow-up, etc.).
- 4. List of non-fuel items stored in spent fuel pool (SFP) 1
- 5. List of locations, or plant maps indicating the location, of locked high radiation areas (LHRAs) and very high radiation areas (VHRAs), including areas with the potential to become a LHRA during routine operations or outages.
- 6. Most recent survey of LHRAs and VHRAs (as applicable).
- 7. Self-assessments or audits covering radiological hazard assessment and exposure controls and HP controls since last inspection (if none, then provide the most recent).
- 8. Corrective Action Program (CAP) documents (CR, NRC, AR, etc.) related to RP controls (e.g., radworker error, HP technician error, posting issues, radioactive source controls, HRA/LHRA/VHRA issues, survey problems, etc.) generated since November 1, 2022. This should be a list of corrective action documents containing a CAP document number and a brief description, not complete documents.
71124.08 - Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation (Last Inspected in November 2020)
- 1. Provide procedures/guidance documents describing licensee compliance with 10 CFR 20, 61, and 71, and 49 CFR 170-189. Procedures/manuals should include:
- a. Solid and liquid radioactive waste (radwaste) processing procedures
- b. Procedure(s) for transferring radwaste resin and sludge discharges into shipping/disposal containers
- c. Waste stream mixing and/or sampling procedures, including:
- i. waste concentration averaging, ii. use of scaling factors and calculations used to account for difficult-to-measure radionuclides, and iii. ensuring waste stream composition data accounts for changing operational parameters
- d. Shipping/transportation procedures
- i. Cask loading and closure procedures (licensee and vendor) applicable to last three cask transports ii. Monitoring impact of long-term storage of RAM iii. Process Control Program (PCP)
- 2. Site-specific and Corporate procedures related to 10 CFR Part 37 compliance (storage of RAM, 10 CFR Part 37 Security Plan, radiation protection and security procedures that identify radiation protection interaction with security, or requirements related to 10 CFR Part 37 compliance, etc.) Note: Please provide these documents if they are classified as Security Related Information-Official Use Only, NO Safeguards Information (SGI) or above should be provided via CERTREC.
- 3. List of locations where Category 1 and 2 materials are stored. Note: Please provide these documents if they are classified as Security Related Information-Official Use Only, NO Safeguards Information (SGI) or above should be provided via CERTREC.
- 4. Supporting calculations for determination of whether an aggregation of RAM meets the definition of Category 1 or Category 2 (e.g., warehouse calculation). Note: Please provide these documents if they are classified as Security Related Information-Official Use Only, NO Safeguards Information (SGI) or above should be provided via CERTREC.
- 5. List of Nationally Tracked Sources, and copies of any National Source Tracking System (NSTS) transaction documentation (e.g., annual reconciliation).
- 6. Copies of the two most recent sealed source inventory records.
- 7. Copy of the most recent radio-chemical sample analysis results (i.e., 10 CFR Part 61" analysis) for each of the radwaste streams (e.g., dry active waste (DAW), ion exchange resins, mechanical filters, and sludges and activated materials).
2
- 8. List and documentation of any changes made to the radwaste processing systems (liquid and solid) and/or the PCP since the last inspection, and associated 10 CFR 50.59 documentation, as appropriate.
- 9. Copies of applicable transport cask Certificate of Compliance for the last three transport cask shipments
- 10. List of RAM storage areas, including satellite radiological controlled areas (RCAs)
- 11. Log of RAM shipments (LSA I, II, IIII; SCO I, II, Type A, or Type B) since the last inspection.
(The inspectors will select three to five packages to review in detail.)
- 12. Most recent self-assessment or audit of the RP program that included radioactive waste processing, radioactive material controls, shipping/radwaste processing, and RAM storage programs (excluding INPO).
- 13. List of CAP documents (AR, CR, NCR, etc.) related to involving radwaste and RAM processing and/or transportation (e.g., keyword searches for RAM, shipping, radwaste, 10 Part 61, etc.) issued since the last inspection. This should be a list of corrective action documents containing an (AR, CR, NCR, etc.) number and brief description, not full documents.
- 14. Available for onsite review during the inspection
- a. Site drawing(s) showing the location of stored RAM and stored radwaste (include these also in the electronic documents provided if possible)
- b. Plant drawings sufficient to permit the inspector to walkdown the liquid and solid radwaste processing systems, to verify current system configuration/ operation agree with the descriptions contained in the Updated Final Safety Analysis Report and in the PCP
- c. Training and qualification records for personnel responsible for radwaste processing, packaging, and making shipments of radioactive material (RAM) and radwaste.
(include these also in the electronic documents provided if possible)
- d. Training and qualification records for personnel responsible for implementation of the 10 CFR Part 37 security plan (e.g., security staff and health physics staff)
- e. Documentation describing the status of any radwaste process equipment that is not operational and/or is abandoned in-place.
- f. Discussion of the sites waste disposal volume and waste reduction program with staff.
71151 - Performance Indicator Verification (Occupational and Public Cornerstones)
(Last Inspected through September 2022)
- 1. Procedure(s) for gathering and reporting PI data
- 2. List of electronic dosimeter dose and dose rate alarms, including alarm setpoint and alarm received, since September 1, 2022
- 3. List of all CAP documents using search keywords such as: HRA, LHRA, VHRA, unintended dose, unlocked door, etc. since October 1, 2022. This should be a list of corrective action documents containing a CAP document number and a brief description, not complete documents.
General and Miscellaneous Information
- 1. List of primary site contact(s) for each inspection area including name(s), email, and telephone numbers.
- 2. Corrective Action Program procedures.
- 3. Plant Management and Radiation Protection organizational charts w/ contact numbers.
3
- 4. Schedule of major maintenance/work activities during the week of the inspection (Gantt chart if available).
Assistance Requested During On-Site Inspection
- 1. Identification of radiological work activities available during the inspection week for observation, including notification of pre-job briefings, notification of risk significant work activities, and location of audio/visual surveillance for remote job coverage.
- 2. Health physics assistance in plant walk-downs and information concerning job coverage of ongoing activities to assess access controls.
- 3. Notification of any radioactive material shipping activities occurring during the inspection week for observation Inspector Contact Information: Mailing Address:
Robert Kellner U.S. Nuclear Regulatory Commission Sr. Health Physicist US NRC Region II (404) 997-4508 ATTN: Robert Kellner robert.kellner@nrc.gov 245 Peachtree Center Ave., N.E Suite 1200 Atlanta, GA 30303 4