NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-22-0081 - LAR to Address Administrative Changes to the Operating License and Technical Specifications (L-2023-LLA-0020)
ML23065A094
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/06/2023
From: Demetrius Murray
NRC/NRR/DORL/LPL2-2
To: Earp D
Duke Energy Progress
References
L-2023-LLA-0020
Download: ML23065A094 (3)


Text

From: Demetrius Murray Sent: Monday, March 6, 2023 9:27 AM To: dennis.Earp@duke-energy.com Cc: Ryan.Treadway@duke-energy.com; Michael Mahoney

Subject:

Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-22-0081

- LAR to Address Administrative Changes to the Operating License and Technical Specifications (L-2023-LLA-0020)

Mr. Earp,

By letter RA-22-0081, dated February 7, 2023 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML23038A186), Duke Energy Carolinas, LLC and Duke Energy Progress, LLC (Duke Energy, the licensee) submitted a license amendment request (LAR) to revise the Shearon Harris Nuclear Power Plant, Unit 1 (HNP) operating license and technical specifications. The proposed change would remove the reference to Duke Energy procedure EGR-NGGC-0153, engineering Instrument Setpoints. The amendment will also remove the reference to Attachment 1, TDI Diesel Engine Requirements, of the Renewed Facility Operating License in accordance with License Amendment No. 53, issued by letter dated January 12, 1995 (ML020570303).

The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an application for an amendment to a license (including the technical specifications) must fully describe the changes requested and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br /> to complete. The NRC staff expects to complete this review in approximately 12 months, which is March 06, 2024. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application, and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities.

If you have any questions, please contact me or Michael Mahoney.

Thank you,

Demetrius Murray, Project Manager, LPL2-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-7646 Hearing Identifier: NRR_DRMA Email Number: 1983

Mail Envelope Properties (SA0PR09MB6986911DBC850C2A752D78339BB69)

Subject:

Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-22-0081 -

LAR to Address Administrative Changes to the Operating License and Technical Specifications (L-2023-LLA-0020)

Sent Date: 3/6/2023 9:26:36 AM Received Date: 3/6/2023 9:26:00 AM From: Demetrius Murray

Created By: Demetrius.Murray@nrc.gov

Recipients:

"Ryan.Treadway@duke-energy.com" <Ryan.Treadway@duke-energy.com>

Tracking Status: None "Michael Mahoney" <Michael.Mahoney@nrc.gov>

Tracking Status: None "dennis.Earp@duke-energy.com" <dennis.Earp@duke-energy.com>

Tracking Status: None

Post Office: SA0PR09MB6986.namprd09.prod.outlook.com

Files Size Date & Time MESSAGE 3722 3/6/2023 9:26:00 AM

Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: