ML17227A502: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 06/30/1992
| issue date = 06/30/1992
| title = Monthly Operating Repts for June 1992 for St Lucie Units 1 & 2.W/920709 Ltr
| title = Monthly Operating Repts for June 1992 for St Lucie Units 1 & 2.W/920709 Ltr
| author name = BREEN J J, SAGER D A
| author name = Breen J, Sager D
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  

Revision as of 07:35, 19 June 2019

Monthly Operating Repts for June 1992 for St Lucie Units 1 & 2.W/920709 Ltr
ML17227A502
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 06/30/1992
From: Breen J, Sager D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-92-202, NUDOCS 9207160165
Download: ML17227A502 (17)


Text

ACCELERATED DISTMBUTION DEMONSATION SYSTEM REGUDAT(0 INFORMATION DISTRIBUTION SYSTEN (RIDE)ACCESSION NBR:9207160165 DOC.DATE:~~NOTARIZED:

NO FACIE:50-335 St.Lucie Plant, Unit 1, Florida Power 6 Light Co.50-389 St.Lucie Plant, Unit 2, Florida Power&Light Co.AUTH.NAME AUTHOR AFFILIATION BREEN,J.J.

Florida Power S Light Co.SAGER,D.A.

Florida Power a Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET¹05000335 05000389

SUBJECT:

Monthl ating repts for June 1992 for St.Lucie Units 1 2.920709 tr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs NOTES: RECIPIENT ID CODE/NAME PD2-2 LA NORRIS,J COPIES LTTR ENCL 3 3 1 1 RECIPIENT ID CODE/NAME PD2-2 PD COPIES LTTR ENCL 1 1 INTERNAL: ACRS AEOD/DSP/TPAB NRR/DOEA/OEAB RGN2 10 10 AEOD/DOA 1 1 NRR DLPQ/LPEB10 11EGF 01 1 1 1 1 1 1 1 1 EXTERNAL'GGG BRYCE F J~H NSIC 1 1 1 1 NRC PDR 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24 P.O.Box 128, Ft.Pierce, FL 34954-0128 II=IPII July 9, 1992 L-92-202 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk washington, DC 20555 Re: St.Lucie Units 1 and 2 Docket, Nos.50-335 and 50-389 Monthl 0 eratin Re ort Attached are the June 1992 Operating Status and Summary of Operating Experience Reports for St.Lucie Units 1 and 2.Should there be any questions on this information, please contact us~Very truly yours, D.A.ger Vice, sident St.Lucie Plant DAS:JJB:kw

.cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St.Lucie Plant Attachments DAS/PSL N734-92 9207160165 920630 F!DR,;ADOCK 05000335'R FDR an FPL Group company

~~AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-335 DATE COMPLETED BY J.J.Breen MONTH JUNE f992 DAY AVERAGE DAILY POWER LEVEL (:-%'~-Net) 6/1/92 6/2/92 6/3/92 6/4/92 6/5/92 6/6/92 6/7/92 6/8/92 6/9/92 6/10/92 6/11/92 6/12/92" 6/13/92 6/14/92 6/15/92 6/16/92 6/17/92 6/18/92 6/19/92 6/20/92 6/21/92 6/22/92 6/23/92 6/24/92 6/25/92 6/26/92 6/27/92 6/28/92 6/29/92 6/30/92 849 849 848 851 828 663 645 702 857 861 862 857 854 786 659 668 703 854 852 853 851 850 847 851 855 860 861 859 861 857

~~P 4' 1~~e OPERATING STATUS OPERATING DATA REPORT DOCKET NO 50-335 DATE COMPLETED'BY Ji Ji BREEN TELEPHONE 487/468/4248 1 o UNIT NAME o ST o LUCIE UNIT 1 2+REPORTXNG PERIOD: JUNE 1992 3+LXCENSED THERMAL POWER (MWT)o 2700 4o NAMEPLATE RATING (GROSS MWE)i 850 5i DESIGN ELECTRICAL RATING (NET MWE)o 830 6o MAXXMUM DEPENDABLE CAPACXTY (GROSS MWE)o 872 7i MAXIMUM DEPENDABLE CAPACITY<NET MWE)o 839 8 XF CHANGES OCCUR IN CAPACITY RATINGS (XTEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT~GIVE REASONS'+POWER LEVEL TO WHICH RESTRICTED'F ANY (NET MWE)10, REASONS FOR RESTRICTIONS'F ANY: MONTHLY-YTD-CUMULATIVE ii,o HOURS IN REPORT PERIOD: 12 o NUMBER OF HOURS REACTOR WAS CRITXCAL 13+REACTOR RESERVE SHUTDOWN HOURS 14 o HOURS GENERATOR ON-LINE 15'NIT RESERVE SHUTDOWN HOURS 16'ROSS THERMAL ENERGY GENERATED (MWH)17m GROSS ELECTRXCAL ENERGY GENERATED (MWH)18'ET ELECTRICAL ENERGY GENERATED<MWH)19 o UNIT SERVICE FACTOR 20 o UNIT AVAILABILITY FACTOR 21 o CAPACXTY FACTOR (USXNG MDC NET)22+CAPACITY FACTOR (USXNG DER NET)23'NIT FORCED OUTAGE RATE 24+SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 720 720eO oie 720eO OiO 1866658 618780 586786 100oO 10eoe 97+1 98+2 OiO 4367 4367'OoO 4367oO OoO 11677207 3920130 3725908 180+0 100ee 101+7 102+8 OoO 136103+0 104476o6 205o3 103562o9 39i3 267404459 88252950 83409604 76ii 76oi 75o7 74o8 4+0 25 o IF SHUT DOWN AT END OF REPORT PERIOD~ESTIMATED DATE OF STARTUP o

~~

UNIT SHUTDOWNS AtG)POWER REDUCTIONS DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE 4 Q 4 REPORT MONTH No.Date Type'uration Reasons Method of Licensee (Hours)Shutting Event Report Down Reactor'ystem Component Code'ode'ause

&Corrective Action to Prevent Recurrence 920605 920614 0.0 0.0 B B N/A N/A HF HF XXXXXX Unit 1 reduced power for cleaning of the 1B1 and 1A2 waterboxes.

Unit 1 reduced power for cleaning of the 1A1 and 1B2 watetboxes.

F Forced S Schcdulcd Reason A-Equipment failure (explain)B-Maintenance or Test C-Refueling D-Regulatory restriction E-Opcratoi Training dt License Examination F-Administrative G-Operational Error (Expalin)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued S-Load Reduction 9-Other (Explain)4 Exhibit G-Instructions for Preparation of Data Entry Sheets Licensee Event Report (LER)Filo (NUREG4161)

Exhibit 1-Samo Source t

SUMMARY

OP OPERATING EXPERIENCE DOCKET NO.50-335 DATE COMPLETED BY J.J.Breen REPORT MONTH JUNE 1992 Unit 1 operated at reduced power from June 5, 1992, until'June 8, 1992, and from June 14, 1992, until June 17, 1992, due to waterbox cleaning.Unit 1's average daily power level was at 1004 for the rest of the month.In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.

0 b AVERAGE DAILY UNIT POWER LEVEL DOCKET NO~50-389 I~DATE COMPLETED BY J.J.Breen MONTH JUNE 1992 DAY AVERAGE DAILY POSER LEVEL (Mve-Net)6/1/92 6/2/92 6/3/92 6/4/92 6/5/92 6/6/92 6/7/92 6/8/92 6/9/92 6/10/92 6/il/92 6/12/92 6/13/92 6/14/92 6/15/92 6/16/92 6/17/92 6/18/92 6/19/92 6/20/92 6/21/92 6/22/92 6/23/92 6/24/92 6/25/92 6/26/92 6/27/92 6/28/92 6/29/92 6/30/92-3-3-3-3-3 4-3-3 4-6-4-4 5-4-6-7-10-20-38-31-31-34 33 104 410 628 730 OPERATING DATA REPORT OPERATING STATUS DOCVET NO 50-389 DATE COMPLETED BY Ji Ji BREEN TELEPHONE 407/468/4248 1 t UNIT NAME~ST~LUCIE UNIT 2 2 o REPORTXNG PERIOD+JUNE 1992 3i LICENSED THERMAL POWER (MWT): 2700 NAMEPLATE RATING (GROSS MWE)f 850 5i*DESIGN ELECTRICAL RATING (NET MWE)o 830 6i MAXIMUM DEPENDABLE CAPACITY (GROSS MWE)i 882 7i MAXXMUM DEPENDABLE CAPACITY (NET MWE)f 839 so IF CHANGES OCCUR XN CAPACXTY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORTS GIVE REASONS'OWER LEVEL, TO WHXCH RESTRICTED'F ANY (NET MWE)10m REASONS FOR RESTRICTIONS~

IF ANYo MONTHLY-.-YTD-CUMULATIVE ili HOURS IN REPORT PERIOD'2+.

NUMBER OF HOURS REACTOR WAS CRXTXCAL 13'EACTOR RESERVE SHUTDOWN HOURS 14'OURS GENERATOR ON-LXNE 15+UNIT RESERVE SHUTDOWN HOURS 16+GROSS THERMAL ENERGY GENERATED (MWH)17'ROSS ELECTRICAL ENERGY GENERATED (MWH)iso NET ELECTRICAL ENERGY GENERATED (MWH)19'NIT SERVICE FACTOR 20, UNIT AVAILABILITY FACTOR 2ii CAPACITY FACTOR (USING MDC NET)22'APACITY FACTOR (USING DER NET)23 o UNIT FORCED OUTAGE RATE 24m SHUTDOWNS SCHEDULED, OVER NEXT 6 MONTHS 720 166i2 eoO 108+3 OoO 159590 50520 40892 13+9 13+9 6+6 6+7 0+0 4367 283io9 0+0 2766oO OiO.71S1S3e 2411070 2274732 63o3 63o3 62+1 62is OiO 78000.0 66452il OoO 65370o3 OiO 171294436 57136890 54037579 83os 83os 83'84 F 1 4o9 25+XF SHUT DOWN AT END OF REPORT PERIOD~ESTIMATED DATE OF STARTUP i f

UNIT SHUTDOWNS AM)POWER REDUCTIONS DOCKET NO.UNIT NAME DATE COMPLETED BY.TELEPHONE 4 4 REPORT MONTH No.Date Type Duration (Hours)Reasons Method of Shutting Down Reactor Licensee System Event Report Code'omponent'ode'ause 8e Corrective Action to Prevent Recurrence 10 10 920421 920626 920627 613.5 0.0 6.2 B N/A N/A N/A RC HA FUELEX ZZZZZZ FUELEX Unit 2 taken offline for refueling.

Unit 2 held at approximately 25%power for physics testing.Unit 2 reduced power for the turbine overspeed trip test.920627 0.0 N/A ZZ ZZZZZZ Unit 2 held at 30%power due to a Chemistry hold.F Forced S Schcdulcd Reason A-Equipment failure (explain)B-Maintenance or Test C-Rcfucling D-Regulatory restriction E-Operator Training dt License Examination F-Administrative G-Operational Error (Expalin)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for preparation of Data Entry Shccts Licensee Event Report (LER)Filo (NVREG4161)

Exhtbtt 1 Same Source UNIT SHUTDOWNS 826)POWER REDUCTIONS DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE REPORT MONTH No.Date Type'uration (Hours)Reason Method of Shutting Down Reactor Licensee Event Report System Code" Component Code'ause 8c Corrective Action to Prevent Recurrence 12 13 920628 920629 0.0 0.0 B B N/A N/A zzzzzz zzzzzz Unit 2 held at approximately 50%power for physics testing.Unit 2 held at approximately 80%power for physics testing.F Forced S Sehcdulcd 2 Reason h-Equipmcnt failure (explain)B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training ds License Examination F-hdministrative G-Operational Error (Expa!in)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-hutomatic Scram 4-Continued S-Load Reduction 9-Other (Explain)Exhibit G Instructions for Preparation of Data Entry Sheets Licensee Event Rcport (LER)File (NUREG4161)

Exhibit I-Same Source

~I~~r

SUMMARY

OP OPERATING EXPERIENCE DOCKET NO.50-389 i~DATE COMPLETED BY J.J.Breen TELEPHONE 407 468-4248 REPORT MONTH JUNE 1992 Unit 2 was in a refueling outage for most of the month of June.The refueling outage ended on June 26, 1992.On June 27, 1992, the unit vas held at approximately 25~power for physics testing and then reduced pover for the turbine overspeed trip test.Upon completion of the turbine overspeed trip test, pover was increased and held at approximately 30%due to a chemistry hold.On June 28, 1992, power was increased and held at approximately 504 for physics testing.On June 29, 1992, power was increased and held at approximately 804 for physics testing.As of June 30, 1992, the unit was at approximately 85%power., In accordance vith the requirements of Technical Specification

.6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.

~I'T(I~'a/