ML18033B493: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 08/20/1990
| issue date = 08/20/1990
| title = Suppls Response to Violations Noted in Insp Repts 50-259/90-14,50-260/90-14 & 50-296/90-14.Corrective Actions: TVA Developed Corporate Level std,STD-10.1.15 Re Independent Verification
| title = Suppls Response to Violations Noted in Insp Repts 50-259/90-14,50-260/90-14 & 50-296/90-14.Corrective Actions: TVA Developed Corporate Level std,STD-10.1.15 Re Independent Verification
| author name = MEDFORD M O
| author name = Medford M
| author affiliation = TENNESSEE VALLEY AUTHORITY
| author affiliation = TENNESSEE VALLEY AUTHORITY
| addressee name =  
| addressee name =  

Revision as of 00:36, 18 June 2019

Suppls Response to Violations Noted in Insp Repts 50-259/90-14,50-260/90-14 & 50-296/90-14.Corrective Actions: TVA Developed Corporate Level std,STD-10.1.15 Re Independent Verification
ML18033B493
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 08/20/1990
From: Medford M
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9008240083
Download: ML18033B493 (5)


See also: IR 05000259/1990014

Text

ACCELERATED

DISTRIBUTION

DEMONSTRATION

SYSTEM REGULATORY

INFORMATION

DISTRIBUTION

SYSTEM (RI DS)CESSION NBR: 9008240083

DOC.DATE: 90/08/20 NOTARIZED:

NO FACIL:50-259

Browns Ferry Nuclear Power Station, Unit 1, Tennessee 50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 50-296 Browns Ferry Nuclear Power Station, Unit 3, Tennessee AUTH.NAME AUTHOR AFFILIATION

MEDFORD,M.O.

Tennessee Valley Authority RECIP.NAME

RECIPIENT AFFILIATION

Document Control Branch (Document Control Desk)SUBJECT: Suppls response to violations

noted in Insp Repts 50 259/90 14 I 50 260/90 14 6 50 296/90 14~DISTRIBUTION

CODE: IE01D COPIES RECEIVED: LTR ENCL SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice

of Violation Response NOTES:1 Copy each to: B.Wilson,S.

BLACK 1 Copy each to: S.Black,B.WILSON

1 Copy each to: S.Black,B.WILSON

DOCKET 05000259 05000260 05000296 D'I/05000259 A 05000260 05000296 RECIPIENT ID CODE/NAME PD INTERNAL: ACRS AEOD/DEIIB

DEDRO t NRR SHANKMAN,S

NRR/DOEA DIR 11 NRR/DRIS/DIR

NRR/PMAS/ILRB12

OE DIR-8&02 EXTERNAL: LPDR NSIC NOTES: COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 5 5 RECIPIENT I D CODE/NAME ROSS,T.AEOD AEOD/TPAD NRR MORISSEAU I D NRR/DLPQ/LPEB10

NRR/DREP/PEPB9D

NRR/DST/DIR

8E2 NUDOCS-ABSTRACT

OGC/HDS2 SRGN2 FILE 01 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 D D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION

LISTS FOR DOCUMENTS YOU DON'T NEED!TAL NUMBER OF COPIES REQUIRED: LTTR 29 ENCL 29 A D D

TENNESSEE VALLEY AUTHORITY CHATTANOOGA.

TENNESSEE 37401 6N 38A Lookout Place AUG 20 1990 U.S.Nuclear Regulatory

Commission

ATTN: Document Control Desk Washington, D.C.20555 Gentlemen:

In the I1atter of Tennessee Valley Authority Docket Nos.50-259 50-260 50-296 BROVilS FERRY NUCLEAR PLANT (BFN)-NRC IiNSPECTION

REPORT 50-259, 260, 296/90-14-SUPPLEi~lENTAL

RESPONSE TO NOTICE OF VIOLATIOiN

On June 14, 1990, NRQ issued the subject inspection

report which cited TVA with a violation for failure to perform independent

verification.

In its response to the violation dated July 13, 1990, TVA noted it was evaluating

the generic impact of this concern and committed to provide a supplemental

response by August 24, 1990.This letter reports on the generic actions that TVA has taken to address independent

verification.

The enclosure provides a listing of commitments

being made in this letter.In order to stan.ardize

independent

verification

activities

TVA has developed a corporate level standard, STD-10.1.15, Independent

Verification.

This standard establishes

requirements

for determining

when independent

verification

is required and for performing

independent

verification.

This standard will be implemented

at BFN by September 30, 1990, through a revision to Site Director Standard Practice (SDSP)3.15, Independent

Verification.

BFNi procedures

will be evaluated against the criteria in this revised SDSP during the two-year procedure review and change process.In summary, TVA considers that the revision of SDSP 3.15 will establish consistent

use of independent

verification

activities

at BFN such that plant systems and components

are controlled

in a manner that supports safe and reliable operation.

Very truly yours, TE&lESSEE VALLEY AUTHORITY 0 9C108'=0'sit".Enclosure cc: See page 2>1.10:=:>401.18'OP AQOC:K I.J i~Iark O.i~ledford, Vice resident Nuclear Technology

and Licensing An Equal Opportunity

Emptoyer~je/I/I

0'

U.S.Nuclear Regulatory

Commission

cc (Enclosure):

Ns.S.C.Black, Deputy Director Project Directorate

II-4 U.S.Nuclear Regulatory

Commission

One White Flint, North 11555 Rockville Pike, Rockville, Haryland 20852 NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama ,35609-2000

Thierry i'1.Ross, Project i'ianager U.S.Nuclear Regu1atory

Commission

One White Flint, North 11555 Rockville Pike Rockvi,lie,.'Iaryland

208 Hr.B.A.Wilson, Project Chief U.S.Nuclear Regulatory

Commission

Region II 101 51arietta Street, NW, Suite 2900 Atlanta, Georgia 30323

'EilCLOSURE

Site Director Standard Practice 3.15, Independent

Verification, will be revised to implement corporate standard ONP 10.1.15, Independent

Verification.

This revision will be completed by September 30, 1990.