Line 47: Line 47:
* 3 9.5 4 9.5 N l.a 8.28 l.b 8.29   
* 3 9.5 4 9.5 N l.a 8.28 l.b 8.29   
.-* SEP Page 5.9 SEP 1 1 l9S4 5.2 Onsite Emergency Organization
.-* SEP Page 5.9 SEP 1 1 l9S4 5.2 Onsite Emergency Organization
[continued]  
[continued]
 
5.2.1 Emergency Position and Team Descriptions
====5.2.1 Emergency====
 
Position and Team Descriptions
[continued]
[continued]
: 5. 2 .1. 2 *Emergency Communicator
: 5. 2 .1. 2 *Emergency Communicator
Line 60: Line 57:
In the event an Assistant Station Manager is not available, the Coordinator Emergency Planning shall assume his responsibilities .   
In the event an Assistant Station Manager is not available, the Coordinator Emergency Planning shall assume his responsibilities .   
* * * -SEP Page 5.26 JUN 2 8 1984 5.2 Onsite Emergency Organization
* * * -SEP Page 5.26 JUN 2 8 1984 5.2 Onsite Emergency Organization
[continued]  
[continued]
 
5.2.1 Emergency Position and Team Descriptions
====5.2.1 Emergency====
 
Position and Team Descriptions
[continued]
[continued]
5.2.1.24 Fire Team [continued]
5.2.1.24 Fire Team [continued]

Revision as of 11:34, 5 May 2019

Forwards Revised Emergency Plan & Rev 4 to Emergency Plan Implementing Procedure EPIP-4.02, Radiation Protection Supervisor Controlling Procedure.
ML18142A116
Person / Time
Site: Surry  Dominion icon.png
Issue date: 11/16/1984
From: STEWART W L
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML18142A117 List:
References
644, NUDOCS 8411260345
Download: ML18142A116 (7)


Text

', e e GOV 02-54 VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 w. L. STEWART VxcE PRESIDENT NUCLEAR 0PERA'1"IONS Mr. James P. O'Reilly Regional Administrator November 16, 1984 U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 2900 Atlanta, Georgia 30323

Dear Mr. O'Reilly:

Serial No. 644 NO/EMT/jmj:EMl-19 Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION REVISIONS TO EMERGENCY PLAN AND EMERGENCY PLAN IMPLEMENTING PROCEDURES ( I Pursuant to lOCFR 50.54 (q) revisions to the Surry Power Station Emergency Plan and Emergency Plan Implementing Procedures are submitted.

Enclosures cc: Document Control Desk (2) Mr. Steven A. Varga, Chief (w/o Enclosures)

Operating Reactors Branch No. 1 Division of Licensing Mr. D. J. Burke (w/o Enclosures)

NRC Resident Inspector*

Surry Power Station 8411260345 841116 PDR ADOCK 05000280 F PDR ~~rs, W. L. Stewart y ',, I ,, VIRGINIA ELECTRIC AND POWER COMPANY REVISIONS TO SURRY POWER STATION EMERGENCY PLAN AND EMERGENCY PLAN IMPLEMENTING PROCEDURES I Enclosed are recently revised pages to the Surry Power Station Emergency Plan and Emergency Plan Implementing Procedures.

Please take the following actions in order to keep your manual updated with the most recent revisions.

Section 1: Section 5: EPIP-4.02 jmj /EMl /19 EMERGENCY PLAN Remove and Destroy N/A Pages 1. 8, 1. 9 dated 06-28-84 Remove and Destroy Page 5.9 dated 09-11-84 and Page 5.26 dated 06-28-84 Insert Pages i.4 and i.5 dated 10-18-84 Pages 1.8, 1.9 dated 10-18-84 Insert Revised pages 5.9, 5.26 dated 10-18-84 Radiation Protection Supervisor Controlling Procedure Remove and Destroy Entire Procedure dated 04-26-84 Insert Entire Procedure dated 10-23-84

  • * .. e VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION PROCEDURE EMERGENCY PLAN EMERGENCY PLAN e LIST OF EFFECTIVE REVISIONS:

SECTION APPENDICES 1 2 3 4 5 DATE 06-28-84 06-28-84 06-28-84 JUL 1 9 1984 06-28-84 06-28-84 06-28-84 06-28-84 06-28-84 06-28-84 JUL 1 9 1984 07-29-82 82 02 03-83 3 (1) PROCEDURE Emergency NUMBER: Plan (2) DATE: JUL 1 9 1984 UNIT II: 1 & 2 (5) 6 THINK RECOMMEND APPROVAL:,_...-L -~ QUALITY CONTROL REVIEW: (9) (µ e.f'J APPROVED STATION NUCLEAR SAFETY AND OPERATING COMMITTEE:

(11) /)~ct ;t... <<~ DATE: JUL 19 er c:.,.. -------

  • NUREG-0654 Ref. Section A l.a 1.b l.c 1.d 1.e 2.a 2.b 3 4 B 1 2 3 4 5 6 7.a 7.b 7.c 7.d 8 9 C l.a 1. b l.c 2.a 2.b 3 4 D l 2 3 E 1 2 3 4.a thru n 5 6 7 F l.a l.b e SURRY EMERGENCY PLAN NUREG-0654 CROSS REFERENCE INDEX NUREG-0654 Page No. Ref. Section F(Cont.) 5.52-64 l.c 5.20-40 l . d Fig. 5. 3 1.e 5.2, 5.3 . 1.f 5.7, 7.5, 7.6 2 NA 3 NA G 10.1, 6.15 APP. 1 1 5.52-62 2 3.a 5.8 3.b 5.2 4.a 5.3 4.b 5.3 4.c 5. 20-28, Table 5.1, Fig. 5 .. 3 5 Fig. 5. 5 H 5.49 Table 5.2 1 5.49 Table 5.2 ') t.. 5.50 3 5.50 4 5.51 5 APP. l 6. 27, 6.31 5.a 5.b 5.5 5.c 5.63 5.d 5. 63, 5. 64 6.a NA 6.b 10.15CERP5.3 6.c 5.44 7 5.44 APP. l 8 9 4.2 TO 4.4-33 ll NA 12 . I 5.4 1 5.40 2 6.4 3.a 6.4
  • 3.b NA 4 5.62 5 5.55 6 7 7 .11 8 7.8, 7.9 9 SEP Page 1-1 SEP 1 6 1982 Page No. 7.11, 7.12 7. 12 7.12, 7.13 7.12 6.30 8.39 8.39 8.40 7.4 7.4 5.56, Table 5.2 5.56; Table 5.2 8.4 8.40 7.3 7.4 .:NA 5.2, EPIP 3402-3.04

_ 7 . 2 , 7 . 1 3 , 7

  • 21 7. 13 -* 7 .14 7. 14 7. 21 7.22 7.22 7.24 7 .18 7.22 7.25 7.25 7. 16 7.2 6. 6 Tab.le 4. 1 6.9, 6.11 7.14, 7.19 7. 14 6.6 7.22 7 .17 6 .10 9,6.11 7 .18 ----**-------... ___ ,. **--*---..-.---------*-****--
  • ---------*~--*-**.

*


***--****-

--*------------

-.~ -----***---------

-*--~---------------------------


*--****-* . ----*-. . ---* .. . ----. -.... " ' It e SEP '11 P_c1,ge 1.,.2 SEP 1 6 1982

  • SURRY EMERGENCY PLAN NUREG-0654 CROSS REFERENCE INDEX NUREG-0654 NUREG-0654 Ref. Section Page No. Ref. Section ~e No. I (Cont.) N(Cont.) 10 6.8 2.a 8.25 11 NA 2.b 8',26 J 2.c 8.26 l.a 6.15 2.d 8.27 l.b 6.15 2. e. 1 8.27 l.c 6 .15 e.2 8.27 l.d 6.14 3.a thru f 8.23-31 2 6.1. 7 . 4 8.~2 3 6.15, 6,17 5 8.33 4 6.15, 6.32 0 5 6.15 1 8.2 6.a 6.24 l.a 8.22 6.b 6.24 l.b NA 6.c 6 *. 25 . 2 8.20 7 6.18 3 6.29 8 6.20 4.a 8. 5-11
  • 9 NA 4.b 8.5-17 10.a Fig. l 4.c 8.5-17 10. b Fig. 5. 6 4.d 8.14,8.18 l O.c 6. l 3 4.e 8 .19 10.d thru 1 NA 4.f 8.18, 8.20 1 O.m 6. 12 4.g 8.22 11 NA 4.h 8.22 12 NA 4. i 8.22 K 4.j 8.6 l. a thru g 6.27-6.31, 6.5, 6.12 5 8.4 2 6.28 p 3.a 6.27, 6.28 1 5.22, 8.7 3.b 6.28 2 8.42 4 NA. 3 8.42, 8.43 5.a 6.29 4 8.34, 8.35 5.b 6.29 5 8.37 6.a thru c 6.31 6 APP. 1-4 7 6.32 7 4.41 L 8 i. 1 l 6.31 9 8 .41 2 6.28 10 8.36 3 NA 4 6.30 M 1 9. l-3 2 9.6
  • 3 9.5 4 9.5 N l.a 8.28 l.b 8.29

.-* SEP Page 5.9 SEP 1 1 l9S4 5.2 Onsite Emergency Organization

[continued]

5.2.1 Emergency Position and Team Descriptions

[continued]

5. 2 .1. 2 *Emergency Communicator

[continued]

5.2.1.3 The Emergency Communicator reports to the Station gency Manager in the Control Room prior to activation of the Technical Support Center (TSC), and in the TSC after its activation.

The duties of the Emergency Communicator are to transmit emergency messages to the Emergency Operations Centers of the counties contiguous to the 10-mile Emergency Planning Zone, to the Department of Emergency Services (DES), and to the NRC, until the local Emergency Operations Facility (LEOF) is activated and manned. The LEOF staff will then assume the responsibility for notification of the off site authorities and agencies.

Other responsibilities of the Emergency Communicator include maintaining the Plant Status Board in the TSC and communications between the TSC and the LEOF. \ Emergency Procedure Coordinator The po~ition of Emergency Procedure Coordinator will be filled by an Assistant Station Manager after augm.en-tation of the onshift emergency organization.

In the event an Assistant Station Manager is not available, the Coordinator Emergency Planning shall assume his responsibilities .

  • * * -SEP Page 5.26 JUN 2 8 1984 5.2 Onsite Emergency Organization

[continued]

5.2.1 Emergency Position and Team Descriptions

[continued]

5.2.1.24 Fire Team [continued]

the Team will report to the Fire Marshal or the Station Emergency Manager or the appropriate Emergency Director.

The principal and the alternate relief for Team Leader will be a Fire Team Scene Leader. The Team members will be members of the North Anna Fire Brigade. The onshift Fire Team members will not report to the Operational Support Center, but will remain in their normal duties unless called out to combat a fire. The Fire Team will combat fires in accordance with the Station Fire Protection Program. Appropriately trained local fire fighting companies have agreed to assist the Station Fire Team, if requested.

5.2.1.25 First Aid Team The First Aid Team members reporting to the Station to augment the onshift First Aid Team will report to the OSC Director in the Operational Support Center until the Team is activated by a need of their services.

Upon activation, the Team will report to the Station gency Manager or the appropriate Emergency Director.

The principal and the alternate relief for Team Leader will be a First Aid Team Captain. Team members will be members of the Station First Aid Team .