ML18142A116

From kanterella
Jump to navigation Jump to search
Forwards Revised Emergency Plan & Rev 4 to Emergency Plan Implementing Procedure EPIP-4.02, Radiation Protection Supervisor Controlling Procedure.
ML18142A116
Person / Time
Site: Surry  Dominion icon.png
Issue date: 11/16/1984
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML18142A117 List:
References
644, NUDOCS 8411260345
Download: ML18142A116 (7)


Text

',

e e GOV 02-54 VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261

w. L. STEWART VxcE PRESIDENT NUCLEAR 0PERA'1"IONS November 16, 1984 Mr. James P. O'Reilly Serial No. 644 Regional Administrator NO/EMT/jmj:EMl-19 U.S. Nuclear Regulatory Commission Docket Nos. 50-280 Region II 50-281 101 Marietta Street, Suite 2900 License Nos. DPR-32 Atlanta, Georgia 30323 DPR-37

Dear Mr. O'Reilly:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION REVISIONS TO EMERGENCY PLAN AND EMERGENCY PLAN IMPLEMENTING PROCEDURES Pursuant to 10CFR 50.54 (q) revisions to the Surry Power Station Emergency Plan and Emergency Plan Implementing Procedures are submitted.

~~rs, W. L. Stewart Enclosures cc: Document Control Desk (2)

Mr. Steven A. Varga, Chief (w/o Enclosures)

Operating Reactors Branch No. 1 Division of Licensing Mr. D. J. Burke (w/o Enclosures)

NRC Resident Inspector*

Surry Power Station

( 8411260345 841116 I PDR ADOCK 05000280 F PDR

y I ,,

VIRGINIA ELECTRIC AND POWER COMPANY REVISIONS TO SURRY POWER STATION EMERGENCY PLAN AND EMERGENCY PLAN IMPLEMENTING PROCEDURES I

Enclosed are recently revised pages to the Surry Power Station Emergency Plan and Emergency Plan Implementing Procedures. Please take the following actions in order to keep your manual updated with the most recent revisions.

EMERGENCY PLAN Section 1:

Remove and Destroy Insert N/A Pages i.4 and i.5 dated 10-18-84 Pages 1. 8, 1. 9 Pages 1.8, 1.9 dated 06-28-84 dated 10-18-84 Section 5:

Remove and Destroy Insert Page 5.9 dated 09-11-84 Revised pages 5.9, and Page 5.26 dated 5.26 dated 10-18-84 06-28-84 EPIP-4.02 Radiation Protection Supervisor Controlling Procedure Remove and Destroy Insert Entire Procedure Entire Procedure dated 04-26-84 dated 10-23-84 jmj /EMl /19

e e

.. (1)

VIRGINIA ELECTRIC AND POWER COMPANY PROCEDURE Emergency SURRY POWER STATION NUMBER: Plan PROCEDURE (2)

DATE: JUL 1 9 1984 3

EMERGENCY PLAN UNIT II: 1 & 2 (5)

EMERGENCY PLAN 6

LIST OF EFFECTIVE REVISIONS:

SECTION DATE 06-28-84 06-28-84 06-28-84 JUL 1 9 1984 06-28-84 06-28-84 06-28-84 06-28-84 06-28-84 APPENDICES 1 06-28-84 2 JUL 1 9 1984 3 07-29-82 4 82 5 02 03-83 THINK RECOMMEND APPROVAL:,_...-

~L -~

QUALITY CONTROL REVIEW: (9)

(µ e.f'J APPROVED STATION NUCLEAR SAFETY AND OPERATING COMMITTEE: (11)

/)~ct ;t...

er

<<~

c:.,..

DATE: JUL 19

e SEP Page 1-1 SEP 1 6 1982

A F(Cont.)

l.a 5.52-64 l.c 7.11, 7.12 1.b 5.20-40 l .d 7. 12 l.c Fig. 5. 3 1.e 7.12, 7.13 1.d 5.2, 5.3 . 1.f 7.12 1.e 5.7, 7.5, 7.6 2 6.30 2.a NA 3 8.39 2.b NA G 3 10.1, 6.15 APP. 1 1 8.39 4 5.52-62 2 8.40 B 3.a 7.4 1 5.8 3.b 7.4 2 5.2 4.a 5.56, Table 5.2 3 5.3 4.b 5.56; Table 5.2 4 5.3 4.c 8.4 5 5. 20-28, Table 5.1, Fig. 5..3 5 8.40

  • 6 7.a 7.b 7.c 7.d 8

Fig. 5. 5 5.49 Table 5.2 5.49 Table 5.2 5.50 5.50 5.51 H

1 3

4 5

')

t..

7.3 7.4

.:NA 5.2, EPIP 3402-3.04

_ 7. 2, 7 . 13 , 7

  • 21 9 APP. l 6. 27, 6.31 5.a 7. 13 -

C 5.b

  • 7 .14 l.a 5.5 5.c 7. 14
1. b 5.63 5.d 7. 21 l.c 5. 63, 5. 64 6.a 7.22 2.a NA 6.b 7.22 2.b 10.15CERP5.3 6.c 7.24 3 5.44 7 7 .18 4 5.44 APP. l 8 7.22 D 9 7.25 l 4.2 TO 7.25 2 4.4-33 ll 7. 16 3 NA 12 . 7.2 E I 1 5.4 1 6. 6 Tab.le 4. 1 2 5.40 2 6.9, 6.11 3 6.4 3.a 7.14, 7.19 4.a thru n 6.4
  • 3.b 7. 14 5 NA 4 6.6 6 5.62 5 7.22 7 5.55 6 7 .17 F 7 6 .10 l.a 7 .11 8 9,6.11 l.b 7.8, 7.9 9 7 .18

-- -- **- - ----- ... ___ ,. **--*---..-.---------*-****-- *---- -----*~--*-**. -------------* ---------***--****- -- *------------ -.~ -----***---------

-*--~- ------- ------------------- -- ---------*--****-* . ----*- . . -- -* .. . ----. - .... " '

It e SEP P_c1,ge 1.,.2

'11 SEP 1 6 1982 SURRY EMERGENCY PLAN NUREG-0654 CROSS REFERENCE INDEX NUREG-0654 NUREG-0654 Ref. Section Page No. Ref. Section ~e No.

I (Cont.) N(Cont.)

10 6.8 2.a 8.25 11 NA 2.b 8',26 J 2.c 8.26 l.a 6.15 2.d 8.27 l.b 6.15 2. e. 1 8.27 l.c 6.15 e.2 8.27 l.d 6.14 3.a thru f 8.23-31 2 6.1. 7 . 4 8.~2 3 6.15, 6,17 5 8.33 4 6.15, 6.32 0 5 6.15 1 8.2 6.a 6.24 l.a 8.22 6.b 6.24 l.b NA 6.c 6*. 25 .2 8.20 7 6.18 3 6.29 8 6.20 4.a 8. 5-11 9 NA 4.b 8.5-17 10.a Fig. l 4.c 8.5-17

10. b Fig. 5. 6 4.d 8.14,8.18 l O.c 6. l 3 4.e 8 .19 10.d thru 1 NA 4.f 8.18, 8.20 1O.m 6. 12 4.g 8.22 11 NA 4.h 8.22 12 NA 4. i 8.22 K 4.j 8.6
l. a thru g 6.27-6.31, 6.5, 6.12 5 8.4 2 6.28 p 3.a 6.27, 6.28 1 5.22, 8.7 3.b 6.28 2 8.42 4 NA. 3 8.42, 8.43 5.a 6.29 4 8.34, 8.35 5.b 6.29 5 8.37 6.a thru c 6.31 6 APP. 1-4 7 6.32 7 4.41 L 8 i. 1 l 6.31 9 8 .41 2 6.28 10 8.36 3 NA 4 6.30 M

1 9. l-3 2 9.6

  • N 3

4 l.a l.b 9.5 9.5 8.28 8.29

SEP Page 5.9 SEP 1 1 l9S4 5.2 Onsite Emergency Organization [continued]

5.2.1 Emergency Position and Team Descriptions [continued]

5. 2 .1. 2 *Emergency Communicator [continued]

The Emergency Communicator reports to the Station Emer-gency Manager in the Control Room prior to activation of the Technical Support Center (TSC), and in the TSC after its activation.

The duties of the Emergency Communicator are to transmit emergency messages to the Emergency Operations Centers of the counties contiguous to the 10-mile Emergency Planning Zone, to the Department of Emergency Services (DES), and to the NRC, until the local Emergency

.- Operations Facility (LEOF) is activated and manned.

LEOF staff will then assume the responsibility notification of the off site authorities and agencies.

The for Other responsibilities of the Emergency Communicator include maintaining the Plant Status Board in the TSC and communications between the TSC and the LEOF.

\

5.2.1.3 Emergency Procedure Coordinator The po~ition of Emergency Procedure Coordinator will be filled by an Assistant Station Manager after augm.en-tation of the onshift emergency organization. In the event an Assistant Station Manager is not available, the Coordinator Emergency Planning shall assume his responsibilities .

- SEP Page 5.26 JUN 2 8 1984 5.2 Onsite Emergency Organization [continued]

5.2.1 Emergency Position and Team Descriptions [continued]

5.2.1.24 Fire Team [continued]

the Team will report to the Fire Marshal or the Station Emergency Manager or the appropriate Emergency Director.

The principal and the alternate relief for Team Leader will be a Fire Team Scene Leader. The Team members will be members of the North Anna Fire Brigade.

The onshift Fire Team members will not report to the Operational Support Center, but will remain in their normal duties unless called out to combat a fire. The Fire Team will combat fires in accordance with the Station Fire Protection Program. Appropriately trained

  • 5.2.1.25 local fire fighting companies have agreed to assist the Station Fire Team, if requested.

First Aid Team The First Aid Team members reporting to the Station to augment the onshift First Aid Team will report to the OSC Director in the Operational Support Center until the Team is activated by a need of their services. Upon activation, the Team will report to the Station Emer-gency Manager or the appropriate Emergency Director.

The principal and the alternate relief for Team Leader will be a First Aid Team Captain. Team members will be members of the Station First Aid Team .