(3 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML13063A476 | | | number = ML13063A476 |
| | issue date = 02/28/2013 | | | issue date = 02/28/2013 |
| | title = Callaway, Unit 1, Response to RAI Set #22 and Amendment 22 to the Callaway LRA | | | title = Response to RAI Set #22 and Amendment 22 to the Callaway LRA |
| | author name = Kremer G S | | | author name = Kremer G S |
| | author affiliation = Ameren Missouri, Union Electric Co | | | author affiliation = Ameren Missouri, Union Electric Co |
Line 15: |
Line 15: |
| | page count = 23 | | | page count = 23 |
| | project = TAC:ME7708 | | | project = TAC:ME7708 |
| | stage = Other | | | stage = Response to RAI |
| }} | | }} |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:WAmeren MISSOURI February 28, 2013 ULNRC-05963 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Ladies and Gentlemen: 10 CFR 2.101 10 CFR 2.109(b) 10 CFR 50.4 10 CFR 50.30 10 CFR 51.53(c) 10 CFR 54 DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO. FACILITY OPERATING LICENSE NPF-30 Callaway Plant RESPONSE TO RAI SET #22 AND AMENDMENT 22 TO THE CALLAWAY LRA References: 1) ULNRC-05830 dated December 15, 2011 2) NRC Letter, "Request for Additional Information for the Review of the Callaway Plant, Unit 1 License Renewal Application, Set 22 (TAC No. ME7708)," dated February 21,2013 3) ULNRC-05939 dated December 19, 2012 By the Reference 1 letter, Union Electric Company (Ameren Missouri) submitted a license renewal application (LRA) for Callaway Plant Unit 1. Reference 2 dated February 21, 2013 transmitted the twenty-second Request for Additional Information (RAI) related to our application. Enclosure 1 contains Ameren Missouri's responses to the individual requests contained in the February 21,2013 RAI. Enclosure 2 contains LRA Amendment 22 to reflect changes made as a result of the RAI responses. Enclosure 2 also transmits corrections to two typographical errors: o Correct a typographical error in Table 3.1.2-2 to revise Table 1 line item referenced from 3.2.1.012 to 3.J 1.012, and ************************************************************************************************************************* ************************************************************************************************************************* ************************************************************************************************************************* ************************************************************************************************************************* ************************************************************************************************************************* ************************************************************************************************************************* PO Box 620 Fulton, MO 65251 AmerenMissouri.com ULNRC-05963 February 28, 2013 Page2 o Revise LRA Table 2.3.2-1 to add Leakage Boundary (spatial) and Structural Integrity (attached) as intended functions for closure bolting to be consistent with changes made to LRA Table 3.2.2-1 by LRA Amendment 18 (Reference 3). We apologize for any inconvenience these oversights may have caused. If you have any questions with regard to these RAI responses, or Amendment 22, please contact me at (314) 954-4319 or Ms. Sarah Kovaleski at (314) 225-1134. I declare under penalty of perjury that the foregoing is true and correct. Sincerely, Executed on: ;:; btver.r J ZB ZD 13 GregS.Zr Director Engineering Programs DS/SGK/nls Enclosures: 1) Request for Additional Information (RAI) Set #22 Responses 2) Amendment 22, LRA Changes from RAI Responses and Typographical Corrections ULNRC-05963 February 28, 2013 Page 3 cc: U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Mr. Elmo E. Collins Regional Administrator U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Samuel Cuadrado De Jesus Project Branch I Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-11F1 Washington, DC 20555 Mr. Fred Lyon Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-8B 1 Washington, DC 20555-2738 Mr. Gregory A. Pick U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 ULNRC-05963 February 28, 2013 Page4 Index and send hardcopy to QA File A160.0761 Hardcopy: Certrec Corporation 4150 International Plaza Suite 820 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.) Electronic distribution for the following can be made via Tech Spec ULNRC Distribution: A. C. Heflin F. M. Diya C. 0. Reasoner III D. W. Neterer L. H. Graessle J. S. Geyer S. A. Maglio R. Holmes-Bobo NSRB Secretary L. H. Kanuckel G. S. Kremer S. G. Kovaleski T. B. Elwood G. G. Yates E. Blocher (STARS PAM COB) Mr. Mike Westman (WCNOC) Mr. Tim Hope (Luminant Power) Mr. Ron Barnes (APS) Mr. Tom Baldwin (PG&E) Mr. Mike Murray (STPNOC) Mr. Mark Morgan (SCE) Mr. John O'Neill (Pillsbury Winthrop Shaw Pittman LLP) Missouri Public Service Commission Mr. Dru Buntin (DNR) | | {{#Wiki_filter:WAmeren MISSOURI February 28, 2013 ULNRC-05963 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Ladies and Gentlemen: |
| }} | | 10 CFR 2.101 10 CFR 2.109(b) 10 CFR 50.4 10 CFR 50.30 10 CFR 51.53(c) 10 CFR 54 DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO. FACILITY OPERATING LICENSE NPF-30 Callaway Plant RESPONSE TO RAI SET #22 AND AMENDMENT 22 TO THE CALLAWAY LRA |
| | |
| | ==References:== |
| | : 1) ULNRC-05830 dated December 15, 2011 2) NRC Letter, "Request for Additional Information for the Review of the Callaway Plant, Unit 1 License Renewal Application, Set 22 (TAC No. ME7708)," dated February 21,2013 3) ULNRC-05939 dated December 19, 2012 By the Reference 1 letter, Union Electric Company (Ameren Missouri) submitted a license renewal application (LRA) for Callaway Plant Unit 1. Reference 2 dated February 21, 2013 transmitted the twenty-second Request for Additional Information (RAI) related to our application. |
| | Enclosure 1 contains Ameren Missouri's responses to the individual requests contained in the February 21,2013 RAI. Enclosure 2 contains LRA Amendment 22 to reflect changes made as a result of the RAI responses. |
| | Enclosure 2 also transmits corrections to two typographical errors: o Correct a typographical error in Table 3.1.2-2 to revise Table 1 line item referenced from 3.2.1.012 to 3.J 1.012, and ************************************************************************************************************************* |
| | ************************************************************************************************************************* |
| | ************************************************************************************************************************* |
| | ************************************************************************************************************************* |
| | ************************************************************************************************************************* |
| | ************************************************************************************************************************* |
| | PO Box 620 Fulton, MO 65251 AmerenMissouri.com ULNRC-05963 February 28, 2013 Page2 o Revise LRA Table 2.3.2-1 to add Leakage Boundary (spatial) and Structural Integrity (attached) as intended functions for closure bolting to be consistent with changes made to LRA Table 3.2.2-1 by LRA Amendment 18 (Reference 3). We apologize for any inconvenience these oversights may have caused. If you have any questions with regard to these RAI responses, or Amendment 22, please contact me at (314) 954-4319 or Ms. Sarah Kovaleski at (314) 225-1134. |
| | I declare under penalty of perjury that the foregoing is true and correct. Sincerely, Executed on: ;:; btver.r J ZB ZD 13 GregS.Zr Director Engineering Programs DS/SGK/nls |
| | |
| | ==Enclosures:== |
| | : 1) Request for Additional Information (RAI) Set #22 Responses |
| | : 2) Amendment 22, LRA Changes from RAI Responses and Typographical Corrections ULNRC-05963 February 28, 2013 Page 3 cc: U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Mr. Elmo E. Collins Regional Administrator U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Samuel Cuadrado De Jesus Project Branch I Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-11F1 Washington, DC 20555 Mr. Fred Lyon Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-8B 1 Washington, DC 20555-2738 Mr. Gregory A. Pick U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 ULNRC-05963 February 28, 2013 Page4 Index and send hardcopy to QA File A160.0761 Hardcopy: |
| | Certrec Corporation 4150 International Plaza Suite 820 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.) |
| | Electronic distribution for the following can be made via Tech Spec ULNRC Distribution: |
| | A. C. Heflin F. M. Diya C. 0. Reasoner III D. W. Neterer L. H. Graessle J. S. Geyer S. A. Maglio R. Holmes-Bobo NSRB Secretary L. H. Kanuckel G. S. Kremer S. G. Kovaleski T. B. Elwood G. G. Yates E. Blocher (STARS PAM COB) Mr. Mike Westman (WCNOC) Mr. Tim Hope (Luminant Power) Mr. Ron Barnes (APS) Mr. Tom Baldwin (PG&E) Mr. Mike Murray (STPNOC) Mr. Mark Morgan (SCE) Mr. John O'Neill (Pillsbury Winthrop Shaw Pittman LLP) Missouri Public Service Commission Mr. Dru Buntin (DNR)}} |
Letter Sequence Response to RAI |
---|
|
Results
Other: ML12125A181, ML12125A332, ML12131A451, ML12131A473, ML12139A058, ML12180A023, ML12244A571, ML12271A423, ML13029A016, ML14035A575, ML14045A284, ML14052A230, ML14083A617, ML14112A355, ML14112A450, ML14125A199, ML14169A441, ML14169A604, ML14169A637, ML14223A602, ML14281A365, ML14302A302, ULNRC-05886, Enclosure 1, Responses to the Individual Requests Contained in July 5, 2012 RAIs and Enclosure 2, Contains LRA Amendment 5 to Reflect Changes Made as a Result of the RAI Responses, ULNRC-05928, Enclosure 2 to ULNRC-05928, Amendment 15, LRA Updates, ULNRC-05957, Enclosure 2 to ULNRC-05957, Amendment 21, LRA Changes from RAI Responses, ULNRC-05979, Enclosure 2 to ULNRC-05979, Amendment 23, LRA Changes from RAI Responses and Commitment Updates Enclosure 2 Summary Table
|
MONTHYEARML12131A4732012-05-15015 May 2012 (Enclosure 4) Environmental Site Audit Regarding Callaway Plant, Unit 1, Project stage: Other ML12125A3322012-05-15015 May 2012 (Enclosure 3) Environmental Site Audit Regarding Callaway Plant, Unit 1 Project stage: Other ML12125A1812012-05-15015 May 2012 Environmental Site Audit Regarding Callaway Plant, Unit 1 Project stage: Other ML12131A4512012-05-15015 May 2012 (Enclosure 2) Environmental Site Audit Regarding Callaway Plant, Unit 1 Project stage: Other ML12139A0582012-05-31031 May 2012 Project Manager Change for the License Renewal Project (Safety) for Callaway Plant, Unit 1 Project stage: Other ML12144A0352012-06-11011 June 2012 Request for Additional Information for the Review of the Callaway Plant Unit 1 License Renewal Application Project stage: RAI ML12159A1542012-06-22022 June 2012 Summary of Site Audit Related to the Review of the License Renewal Application for Callaway Plant, Unit 1 (TAC Nos. ME7715 and ME7716) Project stage: Approval ML12157A0582012-06-22022 June 2012 Request for Additional Information for the Review of the Callaway Plant, Unit 1, License Renewal Application (TAC ME7708) 6 4 2012 Fmp Neutron Embrittlement and Rv Surveillance RAIs on Yee Chris Sydnor Project stage: RAI ML12164A9052012-07-0505 July 2012 Request for Additional Information for the Review of the Callaway Plant Unit 1, LRA Project stage: RAI ML12172A1112012-07-0909 July 2012 Request for Additional Information for the Review of the Callaway Plant, Unit 1, License Renewal Application, Set 4, Project stage: RAI ML12179A4002012-07-18018 July 2012 Request for Additional Information for the Review of the Callaway Plant Unit 1 License Renewal Application Project stage: RAI ML12206A2642012-08-0606 August 2012 Request for Additional Information for the Review of the Callaway Plant Unit 1 License Renewal Application, Set 6 Project stage: RAI ML12220A1602012-08-0606 August 2012 Responses to RAI Set #3 and Amendment 5 to the Callaway License Renewal Application (LRA) Project stage: Response to RAI ULNRC-05886, Enclosure 1, Responses to the Individual Requests Contained in July 5, 2012 RAIs and Enclosure 2, Contains LRA Amendment 5 to Reflect Changes Made as a Result of the RAI Responses2012-08-0606 August 2012 Enclosure 1, Responses to the Individual Requests Contained in July 5, 2012 RAIs and Enclosure 2, Contains LRA Amendment 5 to Reflect Changes Made as a Result of the RAI Responses Project stage: Other ML12180A0232012-08-0909 August 2012 Aging Management Programs Audit Report Regarding the Callaway Plant Unit 1 License Renewal Application Project stage: Other ML12271A4232012-08-13013 August 2012 Responses to Environmental RAI Set #1 to the Callaway LRA Project stage: Other ML12216A3382012-08-16016 August 2012 Request for Additional Information for the Review of the Callaway Plant Unit 1 License Renewal Application, Set 7 Project stage: RAI ML12233A6132012-08-23023 August 2012 Request for Additional Information for the Review of the Callaway Plant, Unit 1, License Renewal Application, Set 8, Electrical Project stage: RAI ML12244A5712012-08-30030 August 2012 Responses to E-RAI Set 2 to the License Renewal Application Project stage: Other ML12233A5702012-09-0606 September 2012 Request for Additional Information for the Review of the Callaway Plant Unit 1 License Renewal Application, Set 9 Project stage: RAI ML12284A4542012-09-12012 September 2012 Request for Additional Information for the Review of the Callaway Plant Unit 1 License Renewal Application, Set 10, Public Version Project stage: RAI ML12240A1742012-09-18018 September 2012 Review of the 2011 Refueling Outage Steam Generator Tube Inservice Inspection Reports Project stage: Approval ML12244A4292012-09-18018 September 2012 Summary of Telephone Conference Call Held on August 29, 2012, Between the U.S. Nuclear Regulatory Commission and Union Electric Company, Concerning the Request for Additional Information Pertaining to the Callaway Plant, Unit 1, License Ren Project stage: RAI ML12250A7702012-09-20020 September 2012 Request for Additional Information for the Review of the Callaway Plant Unit 1 License Renewal Application, Set 11 Project stage: RAI ML12256A8952012-09-25025 September 2012 RAI for the Review of the Callaway Plant, Unit 1, LRA, Set 12 Project stage: RAI ML12255A2872012-10-0101 October 2012 Request for Additional Information for the Review of the Callaway Plant Unit 1, License Renewal Application, Set 13 Project stage: RAI ML12262A3112012-10-0202 October 2012 Summary of Telephone Conference Call Held on September 14, 2012, Between NRC and Union Electric Company, Concerning the SAMA RAI for the Callaway Plant, Unit 1, LRA Project stage: RAI ML12270A1472012-10-0303 October 2012 Request for Additional Information for the Review of the Callaway Plant Unit 1 License Renewal Application, Set 14 Project stage: RAI ML12276A3732012-10-12012 October 2012 RAI for the Review of the Callaway Plant Unit 1, LRA Set 15 Project stage: RAI ML12299A2482012-10-24024 October 2012 Responses to RAI Set #11 & #12 and Amendment 13 to the Callaway LRA Project stage: Response to RAI ULNRC-05928, Enclosure 2 to ULNRC-05928, Amendment 15, LRA Updates2012-11-0808 November 2012 Enclosure 2 to ULNRC-05928, Amendment 15, LRA Updates Project stage: Other ML12314A1412012-11-0808 November 2012 Responses to RAI Set #15 and Amendment 15 to the Callaway LRA Project stage: Response to RAI ML12321A1992012-11-29029 November 2012 9/27/12 - Summary of Telephone Conference Call Held Between the NRC and Union Electric Company (Ameren Missouri), Concerning RAIs Pertaining to the Callaway Plant, Unit 1, License Renewal Application Project stage: RAI ML12326A9152012-12-0707 December 2012 RAI for the Review of the Callaway Plant Unit 1, LRA, Set 18 Project stage: RAI ML12342A1722012-12-27027 December 2012 Request for Additional Information for the Review of the Callaway Plant Unit 1 License Renewal Application Project stage: RAI ML13009A2112013-01-14014 January 2013 Request for Additional Information for the Review of the Callaway Plant 1 License Renewal Application Project stage: RAI ULNRC-05950, Responses to RAI Set 19 & Set 20 and Amendment 20 to the Callaway LRA2013-01-24024 January 2013 Responses to RAI Set 19 & Set 20 and Amendment 20 to the Callaway LRA Project stage: Response to RAI ML13025A0312013-01-30030 January 2013 Request for Additional Information for the Review of the Callaway Plant, Unit 1, License Renewal Application, Set 21 Project stage: RAI ML13029A0162013-02-12012 February 2013 Summary of Telephone Conference Call Held on January 22, 2013, Between the U.S. Nuclear Regulatory Commission Project stage: Other ML13029A6592013-02-12012 February 2013 Summary of Telephone Conference Call Held on December 6, 2012, Between the NRC and Union Electric Company, Concerning Request for Additional Information Pertaining to the Callaway Plant Unit 1, LRA Project stage: RAI ULNRC-05957, Enclosure 2 to ULNRC-05957, Amendment 21, LRA Changes from RAI Responses2013-02-14014 February 2013 Enclosure 2 to ULNRC-05957, Amendment 21, LRA Changes from RAI Responses Project stage: Other ML13046A3072013-02-14014 February 2013 Enclosure 1 to ULNRC-05957, License Renewal Application, Request for Additional Information (RAI) Set #21 Responses Project stage: Request ML13046A3062013-02-14014 February 2013 Response to RAI Set #21 and Amendment 21 to the Callaway LRA Project stage: Response to RAI ML13038A3082013-02-21021 February 2013 RAI for the Review of the Callaway Plant Unit 1, LRA, Set 22 Project stage: RAI ML12307A3912013-02-26026 February 2013 Schedule Revision for the Environmental Review of the Callaway Plant, Unit 1 License Renewal Application (TAC Nos. ME7715 and ME7716) Project stage: Approval ML13063A4762013-02-28028 February 2013 Response to RAI Set #22 and Amendment 22 to the Callaway LRA Project stage: Response to RAI ML13059A8002013-03-11011 March 2013 Summary of Telephone Call Held on 11/5/12, Between NRC and Union Electric Company, Regarding Request for Clarification of Responses to the SAMA RAI Concerning Callaway Plant, Unit 1, LRA Project stage: RAI ML13042A0422013-03-26026 March 2013 Request for Additional Information for the Review of the Callaway Plant Unit 1 License Renewal Application, Set 23 Project stage: RAI ML13058A1242013-03-29029 March 2013 Request for Additional Information for the Review of the Callaway Plant, Unit 1, License Renewal Application, Set 24 Project stage: RAI ULNRC-05979, Enclosure 2 to ULNRC-05979, Amendment 23, LRA Changes from RAI Responses and Commitment Updates Enclosure 2 Summary Table2013-04-26026 April 2013 Enclosure 2 to ULNRC-05979, Amendment 23, LRA Changes from RAI Responses and Commitment Updates Enclosure 2 Summary Table Project stage: Other 2012-08-30
[Table View] |
|
---|
Category:Letter
MONTHYEARULNRC-06853, Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.7172024-01-29029 January 2024 Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.717 IR 05000483/20230042024-01-19019 January 2024 Integrated Inspection Report 05000483/2023004 ML24008A0552024-01-19019 January 2024 Acceptance of Requested Licensing Action - Proposed Alternative to the Requirements of the ASME Code (EPID L-2023-LLR- 0061) ML23353A1712024-01-18018 January 2024 Issuance of Amendment No. 237 to Clarify Support System Requirements for the Residual Heat Removal System and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23317A0012024-01-12012 January 2024 Audit Summary Regarding LAR to Clarify Support System Requirements for the Residual Heat Removal and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23347A1212024-01-11011 January 2024 Issuance of Amendment No. 236 to Adopt TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Volume Values to Licensee Control EPID L-2023-LLA-0046) ML24011A1492024-01-11011 January 2024 Notification of Post-Approval Site Inspection for License Renewal and Request for Information (05000483/2024011) ULNRC-06847, Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01)2023-12-21021 December 2023 Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01) ULNRC-06849, License Renewal Resolution for Commitments 34 and 35 Perform Evaluation of Crack Initiation and Propagation in Steam Generator Divider Plate and Tube-To-Tubesheet Welds2023-12-20020 December 2023 License Renewal Resolution for Commitments 34 and 35 Perform Evaluation of Crack Initiation and Propagation in Steam Generator Divider Plate and Tube-To-Tubesheet Welds ML23346A0392023-12-14014 December 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Request for Relief from Requirements of ASME Code, Section Xl, Examination and Testing Unbonded Post-Tensioning System ULNRC-06844, Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification2023-12-0707 December 2023 Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification 05000483/LER-2023-001, Submittal of LER 2023-001-00 for Callaway, Unit 1, Inoperable Instrument Tunnel Sump Level Indication Resulted in Condition Prohibited by Technical Specifications2023-11-29029 November 2023 Submittal of LER 2023-001-00 for Callaway, Unit 1, Inoperable Instrument Tunnel Sump Level Indication Resulted in Condition Prohibited by Technical Specifications ULNRC-06827, Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029)2023-11-20020 November 2023 Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029) IR 05000483/20230102023-11-15015 November 2023 NRC License Renewal Phase 1 Inspection Report 05000483 2023010 IR 05000483/20233012023-11-0909 November 2023 NRC Examination Report 05000483-2023301 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23297A2502023-11-0606 November 2023 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination and Opportunity for a Hearing (EPID L-2022-LLA-0176) - Letter IR 05000483/20240122023-10-24024 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (05000483/2024012) ML23293A2652023-10-24024 October 2023 3rd Quarter 2023 Integrated Inspection Report ML23240A3692023-10-0505 October 2023 Issuance of Amendment No. 235 to Revise Technical Specifications to Use of Framatome Gaia Fuel (EPID L-2022-LLA-0150) (Non-Proprietary) ML23234A1522023-10-0505 October 2023 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2022-LLE-0030) (Letter) ML23305A0942023-10-0202 October 2023 10-CW-2023-09 Post-Exam Submittal ML23270B9662023-09-27027 September 2023 10 CFR 50.55a(z)(I) Request for Relief from ASME OM Code Pump and Valve Testing Requirements for Fifth 120-Month Inservice Testing Interval ML23228A0252023-09-25025 September 2023 Issuance of Amendment No. 234 to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23261C3852023-09-25025 September 2023 Safety Evaluation for Operating Quality Assurance Manual Revision 36A ML23166B0882023-09-20020 September 2023 Issuance of Amendment No. 233 for Adoption of Alternative Source Term and Revision of Technical Specifications ML23206A1992023-09-15015 September 2023 Regulatory Audit Summary Regarding License Amendment and Regulatory Exemptions Request for Fuel Transition to Framatome Gaia Fuel (Epids L-2022-LLA-0150 and L-2022-LLE-0030) IR 05000483/20234012023-09-13013 September 2023 NRC Security Baseline Inspection Report 05000483/2023401 ML23240A7572023-08-31031 August 2023 NRC Initial Operator Licensing Examination Approval 05000483/2023301 IR 05000483/20230052023-08-23023 August 2023 Updated Inspection Plan for Callaway Nuclear Power Plant, Unit 1 (Report 05000483/2023005) - Mid Cycle Letter 2023 ULNRC-06824, Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A2023-08-17017 August 2023 Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A ML23219A1392023-08-15015 August 2023 Request for Withholding Information from Public Disclosure ULNRC-06830, Transmittal of Updated Technical Specification Markup and Clean Pages for License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak2023-08-15015 August 2023 Transmittal of Updated Technical Specification Markup and Clean Pages for License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak ML23215A1972023-08-0303 August 2023 Supplement to License Amendment and Exemption Request Regarding Use of Framatome Gaia Fuel (LDCN 22-0002) ULNRC-06223, Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004)2023-07-25025 July 2023 Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004) ULNRC-06799, Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications2023-07-13013 July 2023 Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications IR 05000483/20230022023-07-10010 July 2023 Integrated Inspection Report 05000483/2023002 ML23174A1272023-06-23023 June 2023 Cw FFD Document Request List 2023 ML23171A9942023-06-22022 June 2023 Acceptance of Request for Approval of Operating Quality Assurance Manual Revision 36a ULNRC-06821, Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301)2023-06-21021 June 2023 Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301) IR 05000483/20230112023-06-15015 June 2023 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000483/2023011 ULNRC-06822, Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a2023-06-14014 June 2023 Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a ML23158A1462023-06-13013 June 2023 Notification of Post-Approval Site Inspection for License Renewal and Request for Information Inspection (05000483/2023010) ULNRC-06815, Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a2023-06-0505 June 2023 Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a ULNRC-06818, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate .2023-06-0505 June 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate . ML23093A0952023-05-10010 May 2023 Issuance of Amendment No. 232 Regarding Technical Specification Changes for Spent Fuel Storage ULNRC-06816, Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015)2023-05-0909 May 2023 Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015) ML23129A7942023-05-0909 May 2023 Post-Audit Supplement to License Amendment Request and Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (Iepid L-2022-LLA-0150 and EPID L-2022-LLE-0030) ML23122A3172023-05-0808 May 2023 Review of the Spring 2022 Steam Generator Tube Inservice Inspections ML23118A3492023-05-0808 May 2023 Request for Withholding Information from Public Disclosure 2024-01-29
[Table view] |
Text
WAmeren MISSOURI February 28, 2013 ULNRC-05963 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Ladies and Gentlemen:
10 CFR 2.101 10 CFR 2.109(b) 10 CFR 50.4 10 CFR 50.30 10 CFR 51.53(c) 10 CFR 54 DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO. FACILITY OPERATING LICENSE NPF-30 Callaway Plant RESPONSE TO RAI SET #22 AND AMENDMENT 22 TO THE CALLAWAY LRA
References:
- 1) ULNRC-05830 dated December 15, 2011 2) NRC Letter, "Request for Additional Information for the Review of the Callaway Plant, Unit 1 License Renewal Application, Set 22 (TAC No. ME7708)," dated February 21,2013 3) ULNRC-05939 dated December 19, 2012 By the Reference 1 letter, Union Electric Company (Ameren Missouri) submitted a license renewal application (LRA) for Callaway Plant Unit 1. Reference 2 dated February 21, 2013 transmitted the twenty-second Request for Additional Information (RAI) related to our application.
Enclosure 1 contains Ameren Missouri's responses to the individual requests contained in the February 21,2013 RAI. Enclosure 2 contains LRA Amendment 22 to reflect changes made as a result of the RAI responses.
Enclosure 2 also transmits corrections to two typographical errors: o Correct a typographical error in Table 3.1.2-2 to revise Table 1 line item referenced from 3.2.1.012 to 3.J 1.012, and *************************************************************************************************************************
PO Box 620 Fulton, MO 65251 AmerenMissouri.com ULNRC-05963 February 28, 2013 Page2 o Revise LRA Table 2.3.2-1 to add Leakage Boundary (spatial) and Structural Integrity (attached) as intended functions for closure bolting to be consistent with changes made to LRA Table 3.2.2-1 by LRA Amendment 18 (Reference 3). We apologize for any inconvenience these oversights may have caused. If you have any questions with regard to these RAI responses, or Amendment 22, please contact me at (314) 954-4319 or Ms. Sarah Kovaleski at (314) 225-1134.
I declare under penalty of perjury that the foregoing is true and correct. Sincerely, Executed on: ;:; btver.r J ZB ZD 13 GregS.Zr Director Engineering Programs DS/SGK/nls
Enclosures:
- 1) Request for Additional Information (RAI) Set #22 Responses
- 2) Amendment 22, LRA Changes from RAI Responses and Typographical Corrections ULNRC-05963 February 28, 2013 Page 3 cc: U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Mr. Elmo E. Collins Regional Administrator U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Samuel Cuadrado De Jesus Project Branch I Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-11F1 Washington, DC 20555 Mr. Fred Lyon Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-8B 1 Washington, DC 20555-2738 Mr. Gregory A. Pick U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 ULNRC-05963 February 28, 2013 Page4 Index and send hardcopy to QA File A160.0761 Hardcopy:
Certrec Corporation 4150 International Plaza Suite 820 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)
Electronic distribution for the following can be made via Tech Spec ULNRC Distribution:
A. C. Heflin F. M. Diya C. 0. Reasoner III D. W. Neterer L. H. Graessle J. S. Geyer S. A. Maglio R. Holmes-Bobo NSRB Secretary L. H. Kanuckel G. S. Kremer S. G. Kovaleski T. B. Elwood G. G. Yates E. Blocher (STARS PAM COB) Mr. Mike Westman (WCNOC) Mr. Tim Hope (Luminant Power) Mr. Ron Barnes (APS) Mr. Tom Baldwin (PG&E) Mr. Mike Murray (STPNOC) Mr. Mark Morgan (SCE) Mr. John O'Neill (Pillsbury Winthrop Shaw Pittman LLP) Missouri Public Service Commission Mr. Dru Buntin (DNR)