Line 1: |
Line 1: |
| {{Adams|number = ML062160221}} | | {{Adams |
| | | number = ML062160221 |
| | | issue date = 06/30/2006 |
| | | title = IR 05000261-06-006, on 05/19/2006, Carolina Power & Light Company, Physical Security Baseline Inspection |
| | | author name = Bonser B R |
| | | author affiliation = NRC/RGN-II/DRS/PSB1 |
| | | addressee name = Walt T D |
| | | addressee affiliation = Carolina Power & Light Co |
| | | docket = 05000261 |
| | | license number = DPR-023 |
| | | contact person = |
| | | document report number = IR-06-006 |
| | | document type = Inspection Report, Letter |
| | | page count = 4 |
| | }} |
|
| |
|
| {{IR-Nav| site = 05000261 | year = 2006 | report number = 006 }} | | {{IR-Nav| site = 05000261 | year = 2006 | report number = 006 }} |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:DOCUMENT CONTAINS ENCLOSURE CONTAINS UPON SEPARATION THISPAGE IS DECONTROLLED June 30, 2006Carolina Power & Light CompanyATTN:Mr. T. D. WaltVice PresidentH. B. Robinson Steam Electric Plant Unit 2 3581 West Entrance Road Hartsville, SC 29550 | | {{#Wiki_filter:DOCUMENT CONTAINS ENCLOSURE CONTAINS UPON SEPARATION THISPAGE IS DECONTROLLED June 30, 2006Carolina Power & Light CompanyATTN:Mr. T. D. WaltVice PresidentH. B. Robinson Steam Electric Plant Unit 2 3581 West Entrance Road Hartsville, SC 29550 |
|
| |
|
| SUBJECT: H. B. ROBINSON STEAM ELECTRIC PLANT - NRC PHYSICAL SECURITYBASELINE INSPECTION REPORT 05000261/2006006 | | SUBJECT: H. B. ROBINSON STEAM ELECTRIC PLANT - NRC PHYSICAL SECURITYBASELINE INSPECTION REPORT 05000261/2006006 |
|
| |
|
| ==Dear Mr. Walt:== | | ==Dear Mr. Walt:== |
| On May 19, 2006, the NRC completed the onsite portion of an inspection at your H. B. Robinson reactor facility. Portions of inspection procedures 71130.01, AccessAuthorization, and 71130.08, Fitness for Duty, were completed at the Carolina Power & LightCorporate Office on February 10, 2006. The enclosed report documents the inspectionfindings, which were discussed with Mr. E. Martin, at the corporate office, on February 10,2006, and with Mr. C. Baucom, and other members of your staff on May 19, 2006. A re-exitwas conducted on June 13, 2006, with Mr. G. Sanders, and other members of your staff.This inspection examined activities conducted under your license as they relate to safety andcompliance with the Commission's rules and regulations and with the conditions of your license. | | On May 19, 2006, the NRC completed the onsite portion of an inspection at your H. B. Robinson reactor facility. Portions of inspection procedures 71130.01, AccessAuthorization, and 71130.08, Fitness for Duty, were completed at the Carolina Power & LightCorporate Office on February 10, 2006. The enclosed report documents the inspectionfindings, which were discussed with Mr. |
| | |
| | E. Martin, at the corporate office, on February 10,2006, and with Mr. C. Baucom, and other members of your staff on May 19, 2006. A re-exitwas conducted on June 13, 2006, with Mr. G. Sanders, and other members of your staff.This inspection examined activities conducted under your license as they relate to safety andcompliance with the Commission's rules and regulations and with the conditions of your license. |
|
| |
|
| The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.Based on the results of this inspection no findings of significance were identified. | | The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.Based on the results of this inspection no findings of significance were identified. |
Line 24: |
Line 40: |
|
| |
|
| ===w/Attachment:=== | | ===w/Attachment:=== |
| Supplemental Information (Safeguards Information)cc w/encl:William G. Noll Director, Site Operations Carolina Power & Light Company H. B. Robinson Steam Electric Plant 3581 West Entrance Road Hartsville, SC 29550Daniel G. StoddardPlant General Manager Carolina Power & Light Company H. B. Robinson Steam Electric Plant 3581 West Entrance Road Hartsville, SC 29550C. T. Baucom, SupervisorLicensing/Regulatory Programs H. B. Robinson Steam Electric Plant 3581 West Entrance Road Hartsville, SC 29550cc w/o encl: (See page 3) | | Supplemental Information (Safeguards Information)cc w/encl:William G. Noll Director, Site Operations Carolina Power & Light Company H. B. Robinson Steam Electric Plant 3581 West Entrance Road Hartsville, SC 29550Daniel G. StoddardPlant General Manager Carolina Power & Light Company H. B. Robinson Steam Electric Plant 3581 West Entrance Road Hartsville, SC 29550C. T. Baucom, SupervisorLicensing/Regulatory Programs H. B. Robinson Steam Electric Plant 3581 West Entrance Road Hartsville, SC 29550cc w/o encl: (See page 3) |
| DOCUMENT CONTAINS CP&L3DOCUMENT CONTAINS ENCLOSURE CONTAINS UPON SEPARATION THISPAGE IS DECONTROLLEDcc w/o encl:Chris L. Burton, Manager Performance Evaluation and Regulatory Affairs CPB 9 Carolina Power & Light Company P. O. Box 1551 Raleigh, NC 27602-1551J. F. Lucas, ManagerSupport Services - Nuclear Carolina Power & Light Company H. B. Robinson Steam Electric Plant 3581 West Entrance Road Hartsville, SC 29550Henry J. Porter, DirectorDiv. of Radioactive Waste Mgmt. | | DOCUMENT CONTAINS CP&L3DOCUMENT CONTAINS ENCLOSURE CONTAINS UPON SEPARATION THISPAGE IS DECONTROLLEDcc w/o encl:Chris L. Burton, Manager Performance Evaluation and Regulatory Affairs CPB 9 Carolina Power & Light Company P. O. Box 1551 Raleigh, NC 27602-1551J. F. Lucas, ManagerSupport Services - Nuclear Carolina Power & Light Company H. B. Robinson Steam Electric Plant 3581 West Entrance Road Hartsville, SC 29550Henry J. Porter, DirectorDiv. of Radioactive Waste Mgmt. |
| | |
| | Dept. of Health and Environmentalx Control 2600 Bull Street Columbia, SC 29201Beverly Hall, Acting DirectorDivision of Radiation Protection N. C. Department of Environment, Health and Natural Resources 3825 Barrett Drive Raleigh, NC 27609-7721David T. ConleyAssociate General Counsel - Legal Dept. |
|
| |
|
| Dept. of Health and Environmentalx Control 2600 Bull Street Columbia, SC 29201Beverly Hall, Acting DirectorDivision of Radiation Protection N. C. Department of Environment, Health and Natural Resources 3825 Barrett Drive Raleigh, NC 27609-7721David T. ConleyAssociate General Counsel - Legal Dept.
| | Progress Energy Service Company, LLC P. O. Box 1551 Raleigh, NC 27602-1551John H. O'Neill, Jr.Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128(cc w/o encl cont'd - See page 4) |
| | DOCUMENT CONTAINS CP&L4DOCUMENT CONTAINS ENCLOSURE CONTAINS UPON SEPARATION THISPAGE IS DECONTROLLED(cc w/o encl cont'd)Peggy Force Assistant Attorney General State of North Carolina |
|
| |
|
| Progress Energy Service Company, LLC P. O. Box 1551 Raleigh, NC 27602-1551John H. O'Neill, Jr.Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128(cc w/o encl cont'd - See page 4)
| | P. O. Box 629 Raleigh, NC 27602Chairman of the North Carolina Utilities Commission P. O. Box 29510 Raleigh, NC 27626-0510Robert P. GruberExecutive Director Public Staff - NCUC 4326 Mail Service Center Raleigh, NC 27699-4326Public Service CommissionState of South Carolina P. O. Box 11649 Columbia, SC 29211 |
| DOCUMENT CONTAINS CP&L4DOCUMENT CONTAINS ENCLOSURE CONTAINS UPON SEPARATION THISPAGE IS DECONTROLLED(cc w/o encl cont'd)Peggy Force Assistant Attorney General State of North Carolina P. O. Box 629 Raleigh, NC 27602Chairman of the North Carolina Utilities Commission P. O. Box 29510 Raleigh, NC 27626-0510Robert P. GruberExecutive Director Public Staff - NCUC 4326 Mail Service Center Raleigh, NC 27699-4326Public Service CommissionState of South Carolina P. O. Box 11649 Columbia, SC 29211
| |
| }} | | }} |
|
---|
Category:Inspection Report
MONTHYEARIR 05000261/20230042024-01-31031 January 2024 Integrated Inspection Report 05000261/2023004 IR 05000261/20234202023-11-30030 November 2023 Security Baseline Inspection Report 05000261/2023420 (Cover Letter with Report) IR 05000261/20230102023-11-28028 November 2023 Fire Protection Team Inspection Report 05000261/2023010 IR 05000261/20230032023-11-0707 November 2023 Integrated Inspection Report 05000261 2023003 and 07200060 2023001 IR 05000261/20230052023-08-21021 August 2023 Updated Inspection Plan for H.B. Robinson Steam Electric Plant (Report 05000261/2023005) IR 05000261/20230022023-08-0707 August 2023 Integrated Inspection Report 05000261/2023002 IR 05000261/20234022023-05-30030 May 2023 Cyber Security Inspection Report 05000261/2023402 IR 05000261/20230012023-05-0202 May 2023 Integrated Inspection Report 05000261/2023001 IR 05000261/20220062023-03-0101 March 2023 Annual Assessment Letter for H.B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2022006) ML23041A2272023-02-13013 February 2023 2022 Q4 Robinson_Workflow Final IR 05000261/20220032022-11-0303 November 2022 Integrated Inspection Report 05000261 2022003 IR 05000261/20224022022-10-19019 October 2022 Security Baseline Inspection Report 05000261/2022402 IR 05000261/20220102022-09-26026 September 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000261/2022010 IR 05000261/20223012022-09-23023 September 2022 301 Operator License Exam Approval Letter (05000261/2022301) IR 05000261/20220052022-08-26026 August 2022 Updated Inspection Plan for the H.B Robinson Steam Electric Plant - Report 05000261/2022005-Final IR 05000261/20214042022-08-10010 August 2022 Reissue - H.B. Robinson Steam Electric Plant Security Baseline Inspection Report 05000261/2021404 IR 05000261/20220022022-08-0909 August 2022 Integrated Inspection Report 05000261 2022002, 07200060 2022001 and Exercise of Enforcement Discretion IR 05000261/20220112022-07-19019 July 2022 Biennial Problem Identification and Resolution Inspection Report 05000261/2022011 IR 05000261/20220012022-05-0202 May 2022 Integrated Inspection Report 05000261/2022001 IR 05000261/20224012022-04-19019 April 2022 Security Baseline Inspection Report 05000261/2022401 IR 05000261/20210062022-03-0202 March 2022 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 (Report No. 05000261/2021006) IR 05000261/20210042022-01-25025 January 2022 Integrated Inspection Report 050000261/2021004 ML21342A2122021-12-0808 December 2021 Security Baseline Inspection Report 05000261/2021404 IR 05000261/20214032021-11-29029 November 2021 Material Control and Accounting Program Inspection Report 05000261/2021403 (OUO Removed) IR 05000261/20213012021-11-19019 November 2021 NRC Operator License Examination Report 05000261/2021301 IR 05000261/20210032021-11-0404 November 2021 Integrated Inspection Report 05000261/2021003 IR 05000261/20214022021-11-0303 November 2021 Security Baseline Inspection Report 05000261/2021402 IR 05000261/20210052021-08-25025 August 2021 Updated Inspection Plan for H. B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2021005) IR 05000261/20210022021-08-0303 August 2021 Integrated Inspection Report 05000261/2021002 IR 05000261/20214012021-07-0808 July 2021 Cyber Security Inspection Report 05000261/2021401 (Public) IR 05000261/20210012021-05-10010 May 2021 Integrated Inspection Report 05000261/2021001 IR 05000261/20210102021-03-22022 March 2021 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000261/2021010 IR 05000261/20200062021-03-0303 March 2021 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 Report 05000261/2020006 IR 05000261/20200042021-02-0909 February 2021 Integration Inspection Report 05000261/2020004 and Independent Spent Fuel Storage Fuel Storage Installation Inspection (ISFSI) Report 0720060/2020002 IR 05000261/20200112020-12-21021 December 2020 Design Basis Assurance Inspection (Programs) Inspection Report 05000261/2020011 ML20351A2682020-12-15015 December 2020 Requalification Program Inspection Notification Letter W Materials List IR 05000261/20200032020-10-30030 October 2020 Integrated Inspection Report 05000261/2020003 IR 05000261/20204012020-10-28028 October 2020 Security Baseline Inspection Report 05000261/2020401 ML20289A6362020-10-21021 October 2020 Security Inspection Report 05000261/2020420 - Cover Letter IR 05000261/20204202020-10-14014 October 2020 Security Inspection Report 05000261/2020420 - IP 92707 IR 05000261/20200122020-09-30030 September 2020 Fire Protection Team Inspection Report 05000261/2020012 IR 05000261/20200022020-07-23023 July 2020 Integrated Inspection Report 05000261-2020002, and Independent Spent Fuel Storage Installation Inspection Isfi Report 0720060-2020001 IR 05000261/20200012020-04-15015 April 2020 Integrated Inspection Report 05000261/2020001 IR 05000261/20200102020-03-18018 March 2020 Biennial Problem Identification and Resolution Inspection Report 05000261/2020010 IR 05000261/20190062020-03-0303 March 2020 Annual Assessment Letter for H. B. Robinson Steam Electric Plant Unit 2 NRC Report 05000261/2019006 IR 05000261/20190042020-02-13013 February 2020 Integrated Inspection Report 05000261/2019004, and Independent Spent Fuel Storage Installation Inspection (ISFSI) Report 0720060/2019002 IR 05000261/20204022020-01-23023 January 2020 Information Request for the Cyber-Security Baseline Security Inspection, Notification to Perform Inspection 05000261/2020402 IR 05000261/20193012019-11-19019 November 2019 NRC Operator License Examination Report 05000261/2019301 IR 05000261/20190032019-11-14014 November 2019 Integrated Inspection Report 05000261/2019003 IR 05000261/20190122019-09-19019 September 2019 NRC Inspection Report 05000261/2019012, and Investigation Report 2-2018-004; and Apparent Violations 2024-01-31
[Table view] Category:Letter
MONTHYEARIR 05000261/20230042024-01-31031 January 2024 Integrated Inspection Report 05000261/2023004 ML24009A2432024-01-25025 January 2024 Unit, No. 2 - Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0047 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24009A2712024-01-24024 January 2024 Revision to Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML23354A0052024-01-0808 January 2024 Request for Withholding Information from Public Disclosure, H. B. Robinson Steam Electric Plant, Unit No. 2 ML23342A0902023-12-0808 December 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000261/20234202023-11-30030 November 2023 Security Baseline Inspection Report 05000261/2023420 (Cover Letter with Report) IR 05000261/20230102023-11-28028 November 2023 Fire Protection Team Inspection Report 05000261/2023010 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000261/20230032023-11-0707 November 2023 Integrated Inspection Report 05000261 2023003 and 07200060 2023001 ML23226A0862023-10-12012 October 2023 Issuance of Amendment No. 277 Regarding Revision of TSs to Add High-High Steam Generator Level Function to Table 3.3.2-1 and Remove Obsolete Content from TSs 2.1.1.1 and 5.6.5.b ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML23235A0552023-08-23023 August 2023 Notification of an Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000261/2023010) and Request for Information (RFI) IR 05000261/20230052023-08-21021 August 2023 Updated Inspection Plan for H.B. Robinson Steam Electric Plant (Report 05000261/2023005) IR 05000261/20230022023-08-0707 August 2023 Integrated Inspection Report 05000261/2023002 IR 05000261/20234022023-05-30030 May 2023 Cyber Security Inspection Report 05000261/2023402 ML23145A1602023-05-25025 May 2023 Submittal of Updated Final Safety Analysis Report (Revision No. 30), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 28), Technical Specifications Bases Revisions, Quality IR 05000261/20230012023-05-0202 May 2023 Integrated Inspection Report 05000261/2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000261/20220062023-03-0101 March 2023 Annual Assessment Letter for H.B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2022006) ML23047A4512023-02-21021 February 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000261/2023402 ML23041A2272023-02-13013 February 2023 2022 Q4 Robinson_Workflow Final ML22329A2982023-01-19019 January 2023 Issuance of Amendment No. 274 Regarding Revision of Technical Specification 3.8.1 Surveillance Requirement 3.8.1.16 ML22294A0922022-12-15015 December 2022 Issuance of Amendment No. 273 Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML22339A1362022-12-0101 December 2022 2023 Requalification Program Inspection - H.B. Robinson Nuclear Plant ML22322A1322022-11-18018 November 2022 301, NRC Operator License Examination Report & Cover Letter Merged ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000261/20220032022-11-0303 November 2022 Integrated Inspection Report 05000261 2022003 IR 05000261/20224022022-10-19019 October 2022 Security Baseline Inspection Report 05000261/2022402 IR 05000261/20220102022-09-26026 September 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000261/2022010 IR 05000261/20223012022-09-23023 September 2022 301 Operator License Exam Approval Letter (05000261/2022301) ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports IR 05000261/20220052022-08-26026 August 2022 Updated Inspection Plan for the H.B Robinson Steam Electric Plant - Report 05000261/2022005-Final IR 05000261/20214042022-08-10010 August 2022 Reissue - H.B. Robinson Steam Electric Plant Security Baseline Inspection Report 05000261/2021404 IR 05000261/20220022022-08-0909 August 2022 Integrated Inspection Report 05000261 2022002, 07200060 2022001 and Exercise of Enforcement Discretion ML22213A0682022-08-0505 August 2022 Request for Withholding Information from Public Disclosure for H. B. Robinson Steam Electric Plant, Unit 2 ML22193A2122022-08-0404 August 2022 Request of Alternatives to ASME Code Section XI Subsection IWE Requirements for Containment Inspections ML22159A2952022-08-0303 August 2022 Issuance of Amendment No. 271 Regarding Correction to Non-Conservative Technical Specifications Figure 3.4.3-2, Pressure/Temperature Limit Cooldown Curves IR 05000261/20220112022-07-19019 July 2022 Biennial Problem Identification and Resolution Inspection Report 05000261/2022011 ML22167A1702022-07-14014 July 2022 Closeout of Generic Letter 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML22046A0222022-06-14014 June 2022 Issuance of Amendments to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML22125A1942022-05-12012 May 2022 Request for Withholding Information from Public Disclosure for H.B. Robinson Steam Electric Plant, Unit 2 IR 05000261/20220012022-05-0202 May 2022 Integrated Inspection Report 05000261/2022001 IR 05000261/20224012022-04-19019 April 2022 Security Baseline Inspection Report 05000261/2022401 ML22098A2262022-04-11011 April 2022 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML22083A0032022-03-29029 March 2022 Closeout of Bulletin 2012 01, Design Vulnerability in Electric Power System IR 05000261/20210062022-03-0202 March 2022 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 (Report No. 05000261/2021006) 2024-01-08
[Table view] |
Text
DOCUMENT CONTAINS ENCLOSURE CONTAINS UPON SEPARATION THISPAGE IS DECONTROLLED June 30, 2006Carolina Power & Light CompanyATTN:Mr. T. D. WaltVice PresidentH. B. Robinson Steam Electric Plant Unit 2 3581 West Entrance Road Hartsville, SC 29550
SUBJECT: H. B. ROBINSON STEAM ELECTRIC PLANT - NRC PHYSICAL SECURITYBASELINE INSPECTION REPORT 05000261/2006006
Dear Mr. Walt:
On May 19, 2006, the NRC completed the onsite portion of an inspection at your H. B. Robinson reactor facility. Portions of inspection procedures 71130.01, AccessAuthorization, and 71130.08, Fitness for Duty, were completed at the Carolina Power & LightCorporate Office on February 10, 2006. The enclosed report documents the inspectionfindings, which were discussed with Mr.
E. Martin, at the corporate office, on February 10,2006, and with Mr. C. Baucom, and other members of your staff on May 19, 2006. A re-exitwas conducted on June 13, 2006, with Mr. G. Sanders, and other members of your staff.This inspection examined activities conducted under your license as they relate to safety andcompliance with the Commission's rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.Based on the results of this inspection no findings of significance were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will beavailable electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMSis accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the PublicElectronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390 a copy of this letter's enclosure will not beavailable for public inspection.
DOCUMENT CONTAINS CP&L2DOCUMENT CONTAINS ENCLOSURE CONTAINS UPON SEPARATION THISPAGE IS DECONTROLLEDShould you have any questions concerning this letter, please contact us.
Sincerely,/RA/
Brian R. Bonser, ChiefPlant Support Branch Division of Reactor SafetyDocket No.: 50-261License No:DPR-23
Enclosure:
NRC Inspection Report No. 05000261/2006006
w/Attachment:
Supplemental Information (Safeguards Information)cc w/encl:William G. Noll Director, Site Operations Carolina Power & Light Company H. B. Robinson Steam Electric Plant 3581 West Entrance Road Hartsville, SC 29550Daniel G. StoddardPlant General Manager Carolina Power & Light Company H. B. Robinson Steam Electric Plant 3581 West Entrance Road Hartsville, SC 29550C. T. Baucom, SupervisorLicensing/Regulatory Programs H. B. Robinson Steam Electric Plant 3581 West Entrance Road Hartsville, SC 29550cc w/o encl: (See page 3)
DOCUMENT CONTAINS CP&L3DOCUMENT CONTAINS ENCLOSURE CONTAINS UPON SEPARATION THISPAGE IS DECONTROLLEDcc w/o encl:Chris L. Burton, Manager Performance Evaluation and Regulatory Affairs CPB 9 Carolina Power & Light Company P. O. Box 1551 Raleigh, NC 27602-1551J. F. Lucas, ManagerSupport Services - Nuclear Carolina Power & Light Company H. B. Robinson Steam Electric Plant 3581 West Entrance Road Hartsville, SC 29550Henry J. Porter, DirectorDiv. of Radioactive Waste Mgmt.
Dept. of Health and Environmentalx Control 2600 Bull Street Columbia, SC 29201Beverly Hall, Acting DirectorDivision of Radiation Protection N. C. Department of Environment, Health and Natural Resources 3825 Barrett Drive Raleigh, NC 27609-7721David T. ConleyAssociate General Counsel - Legal Dept.
Progress Energy Service Company, LLC P. O. Box 1551 Raleigh, NC 27602-1551John H. O'Neill, Jr.Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128(cc w/o encl cont'd - See page 4)
DOCUMENT CONTAINS CP&L4DOCUMENT CONTAINS ENCLOSURE CONTAINS UPON SEPARATION THISPAGE IS DECONTROLLED(cc w/o encl cont'd)Peggy Force Assistant Attorney General State of North Carolina
P. O. Box 629 Raleigh, NC 27602Chairman of the North Carolina Utilities Commission P. O. Box 29510 Raleigh, NC 27626-0510Robert P. GruberExecutive Director Public Staff - NCUC 4326 Mail Service Center Raleigh, NC 27699-4326Public Service CommissionState of South Carolina P. O. Box 11649 Columbia, SC 29211