|
---|
Category:Inspection Plan
MONTHYEARIR 05000334/20240052024-08-29029 August 2024 Updated Inspection Plan for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2024005 and 05000412/2024005) ML24136A0622024-05-15015 May 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000334/2024010 and 05000412/2024010 IR 05000334/20230062024-02-28028 February 2024 Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2023006 and 05000412/2023006) IR 05000334/20230052023-08-31031 August 2023 Updated Inspection Plan for Beaver Valley Power Station Units 1 and 2 (Report 05000334/2023005 and 05000412/2023005) ML23090A0192023-03-31031 March 2023 Information Request for the Cyber Security Baseline Inspection; Notification to Perform Inspection 05000334/2023401 and 05000412/2023401 IR 05000334/20220062023-03-0101 March 2023 Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2022006 and 05000412/2022006) IR 05000334/20220052022-08-31031 August 2022 Updated Inspection Plan for Beaver Valley Power Station, Units 1 and 2 (Report 05000334/2022005 and 05000412/2022005) IR 05000334/20210062022-03-0202 March 2022 Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2021006 and 05000412/2021006) IR 05000334/20210052021-09-0101 September 2021 Updated Inspection Plan for the Beaver Valley Power Station, Units 1 and 2 (Report 05000334/2021005 and 05000412/2021005) ML21124A1322021-05-0404 May 2021 Notification of Conduct of a Fire Protection Team Inspection IR 05000334/20200062021-03-0303 March 2021 Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2020006 and 05000412/2020006) IR 05000334/20200052020-08-31031 August 2020 Updated Inspection Plan (Inspection Report 05000334/2020005 and 05000412/2020005) IR 05000334/20190062020-03-0303 March 2020 Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2 (Report 05000334/2019006 and 05000412/2019006) IR 05000334/20190052019-08-28028 August 2019 Updated Inspection Plan Inspection Report 05000334/2019005 and 05000412/2019005 IR 05000334/20180062019-03-0404 March 2019 Annual Assessment Letter for Beaver Valley Power Station, Unit Nos. 1 and 2 (Reports 05000334/2018006 and 05000412/2018006) IR 05000334/20180052018-08-28028 August 2018 Updated Inspection Plan Inspection Report 05000334/2018005 and 05000412/2018005 IR 05000334/20170062018-02-28028 February 2018 Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2(Reports 05000334/2017006 and 0500412/2017006; 05000334/2017402 and 05000412/2017402 and 05000334-2017501 and 05000412/2017501) ML17271A0662017-09-28028 September 2017 Information Request for the Cyber Security Baseline Inspection Notification to Perform Inspection 05000334/2018403 and 05000412/2018403 IR 05000334/20160062017-03-0101 March 2017 Annual Assessment Letter for Beaver Valley Power Station, Unit Nos. 1 and 2 (Report 05000334/2016006 and 05000412/2016006) with Report 22 IR 05000334/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Beaver Valley Power Station Units 1 and 2 (Report 05000334/2016005 and 05000412/2016005) IR 05000334/20150062016-03-0202 March 2016 ROP 16 Annual Assessment Letter for Beaver Valley Power Station, Units 1 & 2 (Report 05000334/2015006 and 05000412/2015006) IR 05000334/20150052015-09-0101 September 2015 ROP-16 Mid-Cycle Assessment Letter for Beaver Valley Power Station (Report 05000334/2015005 and 05000412/2015005) IR 05000334/20140012015-03-0404 March 2015 ROP 15 Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2, (Report 05000334/2014001 and 05000412/2014001) IR 05000334/20140062014-09-0202 September 2014 ROP-15 Mid-Cycle Performance Review and Inspection Plan Report 05000334/2014006 and 05000412/2014006 IR 05000334/20130012014-03-0404 March 2014 ROP-14 2013 Beaver Valley Power Station Units 1 and 2, Annual Assessment Letter, Report 05000334/2013001 and 05000412/2013001, and Inspection Plan IR 05000334/20130062013-09-0303 September 2013 Mid-Cycle Performance Review and Inspection Plan Report 05000334/2013006 and 05000412/2013006 IR 05000334/20120012013-03-0404 March 2013 Annual Assessment Letter for Beaver Valley Units 1 and 2 (Report 05000334/2012001 and 05000412/2012001) IR 05000334/20120062012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan 2012 - Beaver Valley Power Station (Report 05000334/2012006 and 05000412/2012006) IR 05000334/20110012012-03-0505 March 2012 Annual Assessment Letter for Beaver Valley Power Station Units 1 and 2 (Report 05000334-11-001 and 05000412-11-001) ML1124206842011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Beaver Valley Units 1 and 2 IR 05000334/20100012011-03-0404 March 2011 Annual Assessment Letter for Beaver Valley Units 1 and 2, EOC 11 (Report 05000334/2010001 and 05000412/2010001) ML1024406392010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan 2010 - Beaver Valley Units 1 and 2 IR 05000334/20010012010-03-0303 March 2010 Annual Performance Review and Inspection Plan - Beaver Valley Power Station (Beaver Valley) Units 1 and 2 (05000334-01-001 and 05000412-01-001) ML0924401272009-09-0101 September 2009 Mid-Cycle Performance Review and Inspection Plan - Beaver Valley Units 1 and 2 IR 05000334/20090012009-03-0404 March 2009 Annual Assessment Letter - Beaver Valley Power Station Units 1 and 2 (05000334/2009001 and 05000412/2009001) ML0824704722008-09-0202 September 2008 2008 Mid-Cycle Performance Review and Inspection Plan - Beaver Valley IR 05000334/20080012008-03-0303 March 2008 (05000334-08-001, 05000412-08-001), Annual Assessment Letter ML0734706972007-12-13013 December 2007 ROP 8 - Beaver Valley - Change to Inspection Plan, 12/13/07 ML0724309412007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan ML0706104772007-03-0202 March 2007 Annual Assessment Letter EOC 2006 - Beaver Valley Station ML0624305972006-08-31031 August 2006 Mid-cycle Performance Review and Inspection Plan - Beaver Valley Power Station Units 1 and 2 ML0606201582006-03-0202 March 2006 2006-001 - Annual Assessment Letter - Beaver Valley Power Station Units 1 and 2 (Reports 05-334-2006001 and 05-412-2006001) ML0524207222005-08-30030 August 2005 2005 Mid-Cycle Review and Inspection Plan - Beaver Valley ML0406301322004-03-0202 March 2004 2003-04 Annual Assessment Letter - Beaver Valley ML0323906412003-08-27027 August 2003 2003 Mid-Cycle Performance Review and Inspection Plan for Beaver Valley Power Station ML0306205872003-03-0303 March 2003 2003 Annual Assessment Letter - Beaver Valley Power Station, Units 1 & 2 IR 05000334/20020012002-03-0101 March 2002 2002 Annual Assessment Letter - Beaver Valley Power Station Units 1 & 2 (Report 50-334/02-01, 50-412/02-01) 2024-08-29
[Table view] Category:Letter
MONTHYEARIR 05000334/20240112024-10-17017 October 2024 License Renewal Phase IV Inspection Report 05000334/2024011 L-24-038, License Amendment Request to Remove the Expired One-Time Action for Valve Leak Repair in Technical Specification (TS) 3.5.2 and to Correct Core Operating Limits Rep Ort (COLR) References2024-09-17017 September 2024 License Amendment Request to Remove the Expired One-Time Action for Valve Leak Repair in Technical Specification (TS) 3.5.2 and to Correct Core Operating Limits Rep Ort (COLR) References ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter L-24-015, Twenty-Ninth Refueling Outage Inservice Inspection Summary Report2024-09-17017 September 2024 Twenty-Ninth Refueling Outage Inservice Inspection Summary Report ML24260A1912024-09-16016 September 2024 Operator Licensing Examination Approval IR 05000334/20240052024-08-29029 August 2024 Updated Inspection Plan for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2024005 and 05000412/2024005) L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 L-24-199, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-08-22022 August 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 IR 05000334/20244022024-08-22022 August 2024 Security Baseline Inspection Report 05000334/2024402 and 05000412/2024402 (Cover Letter Only) IR 05000334/20240102024-08-20020 August 2024 Comprehensive Engineering Team Inspection - Inspection Report 05000334/2024010 and 05000412/2024010 L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000334/20240022024-08-0505 August 2024 Integrated Inspection Report 05000334/2024002 and 05000412/2024002 ML24208A0462024-07-26026 July 2024 NRC Office of Investigations Case No. 1-2023-005 L-24-182, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-07-23023 July 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-24-161, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-07-19019 July 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 05000334/LER-2024-004, Reactor Trip Due to Bypass Feedwater Regulating Valve Failure to Control2024-07-17017 July 2024 Reactor Trip Due to Bypass Feedwater Regulating Valve Failure to Control L-24-014, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling Svstem Evaluation Models2024-07-16016 July 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling Svstem Evaluation Models ML24193A2912024-07-16016 July 2024 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule IR 05000334/20245012024-07-0808 July 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000334/2024501 and 05000412/2024501 05000334/LER-2024-003, Unanalyzed Containment Bypass Condition Due to Degraded River Water Piping2024-07-0202 July 2024 Unanalyzed Containment Bypass Condition Due to Degraded River Water Piping L-24-164, BV-2, Post Accident Monitor Report2024-06-27027 June 2024 BV-2, Post Accident Monitor Report IR 05000334/20244012024-06-26026 June 2024 Material Control and Accounting Program Inspection Report 05000334/2024401 and 05000412/2024401 (Cover Letter Only) L-24-094, Reactor Vessel Surveillance Capsule Withdrawal Schedule2024-06-24024 June 2024 Reactor Vessel Surveillance Capsule Withdrawal Schedule L-24-152, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-06-17017 June 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations 05000334/LER-2024-002, Automatic Reactor Trip Due to Low Reactor Coolant Flow Caused by Transformer Overexcitation Protection Relay Actuation2024-06-11011 June 2024 Automatic Reactor Trip Due to Low Reactor Coolant Flow Caused by Transformer Overexcitation Protection Relay Actuation 05000334/LER-2024-001, Offsite AC Power Source Inoperable Due to Breaker Failure Resulting in Condition Prohibited by Technical Specification2024-06-0606 June 2024 Offsite AC Power Source Inoperable Due to Breaker Failure Resulting in Condition Prohibited by Technical Specification ML24135A1702024-05-29029 May 2024 – Steam Generator Tube Inspection - Review of the Spring 2023 Tube Inspection Reports ML24135A2282024-05-29029 May 2024 Review of the Spring 2023 Outage Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F Star Reports L-24-021, Cycle 30 Core Operating Limits Report2024-05-23023 May 2024 Cycle 30 Core Operating Limits Report L-24-121, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-05-23023 May 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 ML24141A1052024-05-20020 May 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24136A0622024-05-15015 May 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000334/2024010 and 05000412/2024010 L-24-107, CFR 50.55a Request 1-TYP-5-RRP-l, for Alternative Method of Nondestructive Examination for River Water Outlet Piping Weld Repair2024-05-13013 May 2024 CFR 50.55a Request 1-TYP-5-RRP-l, for Alternative Method of Nondestructive Examination for River Water Outlet Piping Weld Repair IR 05000334/20240012024-05-0808 May 2024 Integrated Inspection Report 05000334/2024001 and 05000412/2024001 L-23-269, Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions2024-05-0707 May 2024 Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions L-24-054, Submittal of 2023 Annual Radioactive Effluent Release Report 2023 Annual Radiological Environmental Operating Report and 2023 Annual Environmental Operating Report (Non-Radiological)2024-04-29029 April 2024 Submittal of 2023 Annual Radioactive Effluent Release Report 2023 Annual Radiological Environmental Operating Report and 2023 Annual Environmental Operating Report (Non-Radiological) L-24-089, Emergency Preparedness Plan2024-04-23023 April 2024 Emergency Preparedness Plan L-24-088, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for March 20242024-04-22022 April 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for March 2024 ML24101A2752024-04-10010 April 2024 Response to Request for Additional Information Regarding Spring 2023 180-Day Steam Generator Tube Inspection Report L-24-082, Withdrawal of Exemption Request2024-04-0303 April 2024 Withdrawal of Exemption Request L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage L-24-064, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152024-03-13013 March 2024 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 ML24044A0662024-03-0404 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0083 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24057A0752024-03-0101 March 2024 the Associated Independent Spent Fuel Storage Installations IR 05000334/20230062024-02-28028 February 2024 Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2023006 and 05000412/2023006) CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee IR 05000334/20230042024-02-12012 February 2024 Integrated Inspection Report 05000334/2023004 and 05000412/2023004 ML24025A0922024-01-25025 January 2024 Requalification Program Inspection 2024-09-17
[Table view] |
Text
August 29, 2024
SUBJECT:
UPDATED INSPECTION PLAN FOR BEAVER VALLEY POWER STATION, UNITS 1 AND 2 (REPORTS 05000334/2024005 AND 05000412/2024005)
Dear Barry Blair:
The enclosed inspection plan lists the inspections scheduled through June 30, 2026, for Beaver Valley Power Station, Units 1 and 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
As noted in the attached inspection plan, in addition to baseline inspections, the NRC will implement Inspection Procedure 71003, Post-Approval Site Inspection for License Renewal, Phase 1 and 4, at your facility.
This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading -rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Please contact me at (610) 337-5205 with any questions you have regarding this letter.
Sincerely, Matt R. Young, Chief Projects Branch 2 Division of Operating Reactor Safety
Docket Nos. 05000334 and 05000412 License Nos. DPR-66 and NPF-73
Enclosure:
As stated
cc w/ encl: Distribution via LISTSERV SUBJECT: UPDATED INSPECTION PLAN FOR BEAVER VALLEY POWER STATION, UNITS 1 AND 2 (REPORTS 05000334/2024005 AND 5000412/2024005)
DATED AUGUST 29, 202 4
DISTRIBUTION RLorson, RA (R1ORAMAIL RESOURCE)
DCollins, DRA (R1ORAMAIL RESOURCE)
BWelling, DORS (R1DORSMAIL RESOURCE)
RMckinley DORS (R1DORSMAIL RESOURCE)
PKrohn, DRSS (R1DRSSMAIL RESOURCE)
JZimmerman, DRSS (R1DRSS MAIL RESOURCE)
MYoung, DORS SElkhiamy, DORS AChristiano, DORS NDay, DORS, SRI ANugent, DORS, RI MEvans, DORS, AA MSimmons, RI OEDO RidsNrrPMBeaverValley Resource RidsNrrDorlLpl1 Resource DORS Specialist Branch Chiefs DRSS Reactor Branch Chiefs DTifft, RI, SLO DScrenci, RI, PAO NSheehan, RI, PAO ROPassessment Resource
DOCUMENT NAME: https://usnrc.sharepoint.com/teams/ROPAssessmentMeetings/Shared Documents/ROP -25 Second Quarter Process/Branch 2/ROP-25 Region I Inspection Plan Transmittal Letter_BV.docx ADAMS Accession No. ML24240A065 SUNSI Review n -Sensitive Publvlle Sensitive n -Publiclyvlable OFFICE RI/DORS RI/DORS ME SElky MYoung TE 8/ 4 /2024 OFFIAL RERD CO Site Inspection Activity Plan Beaver Valley
07/01/2024 - 06/30/2026
Unit Start End Activity CAC Title Staff Count
Comprehensive Engineering Team Inspection - Beaver Valley 7
1,2 7/15/2024 7/19/2024 IP 71111.21M 000713 Comprehensive Engineering Team Inspection
1,2 7/29/2024 8/2/2024 IP 71111.21M 000713 Comprehensive Engineering Team Inspection
Access Control, Protective Strategy, TSR, SPR 4
1,2 8/5/2024 8/8/2024 IP 71130.02 000734 Access Control
1,2 8/5/2024 8/8/2024 IP 71130.05 000737 Protective Strategy Evaluation
1,2 8/5/2024 8/8/2024 IP 71130.09 001656 Security Plan Changes
1,2 8/5/2024 8/8/2024 IP 71130.14 000743 Review of Power Reactor Target Sets
1,2 8/5/2024 8/8/2024 IP 71151 001338 Performance Indicator Verification
License Renewal Phase 4 - Beaver Valley Unit 1 4
1 9/9/2024 9/13/2024 IP 71003 000687 Post-Approval Site Inspection for License Renewal
RP - 71124.08 Rad Waste - BV 1
1,2 9/16/2024 9/20/2024 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation
2024 BV2 Initial Operator Licensing Exam 4
2 8/26/2024 8/30/2024 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
2 10/6/2024 10/11/2024 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
Inservice Inspection - Beaver Valley Unit 2 1
2 10/14/2024 11/1/2024 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
RP - 71151 PI Verification - BV 1
1,2 11/12/2024 11/15/2024 IP 71151 000746 Performance Indicator Verification
RP Airborne 71124.03 and Dose Assessment 71124.04 - BV 1
1,2 1/26/2025 1/31/2025 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation
1,2 1/26/2025 1/31/2025 IP 71124.04 000728 Occupational Dose Assessment
Fire Protection - Beaver Valley 3
1,2 3/3/2025 3/7/2025 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
1,2 3/17/2025 3/21/2025 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
RP RETS 71124.06 - BV 1
1,2 3/3/2025 3/7/2025 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment
Access Control, Maintenance, Sec Trng, SPR, PIs - BV 3
1,2 4/14/2025 4/18/2025 IP 71130.02 000734 Access Control
1,2 4/14/2025 4/18/2025 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance
1,2 4/14/2025 4/18/2025 IP 71130.07 000739 Security Training
Prepared on 8/14/2024 2:20:58 PM 1 of 3 Site Inspection Activity Plan
1,2 4/14/2025 4/18/2025 IP 71130.09 001656 Security Plan Changes
1,2 4/14/2025 4/18/2025 IP 71151 001338 Performance Indicator Verification
PI&R Biennial Team Inspection - Beaver Valley 4
1,2 4/28/2025 5/2/2025 IP 71152B 000747 Problem Identification and Resolution
1,2 5/12/2025 5/16/2025 IP 71152B 000747 Problem Identification and Resolution
EP Program Inspection - Beaver Valley 2
1,2 5/5/2025 5/9/2025 IP 71114.02 000717 Alert and Notification System Testing
1,2 5/5/2025 5/9/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System
1,2 5/5/2025 5/9/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
1,2 5/5/2025 5/9/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness
1,2 5/5/2025 5/9/2025 IP 71151 001397 Performance Indicator Verification
RP REMP 71124.07 - BV 1
1,2 5/19/2025 5/23/2025 IP 71124.07 000731 Radiological Environmental Monitoring Program
BV2 Requal Inspection with P/F Results 2
2 7/21/2025 7/25/2025 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance 2 7/21/2025 7/25/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance
Cyber Security - Beaver Valley 4
1,2 8/18/2025 8/22/2025 IP 71130.10 000741 Cybersecurity
FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - BV 5
1,2 8/4/2025 8/8/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing
1,2 8/25/2025 8/29/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing
2025 BV2 Initial Operator Licensing Exam 5
2 9/7/2025 9/13/2025 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
2 10/5/2025 10/11/2025 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
Inservice Inspection - Beaver Valley Unit 1 1
1 10/6/2025 10/17/2025 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
RP Rad Hazard Assessment and Exposure Control 71124.01 - BV 1
1,2 10/19/2025 10/24/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
AA, FFD - BV 2
1,2 12/8/2025 12/12/2025 IP 71130.01 000733 Access Authorization
1,2 12/8/2025 12/12/2025 IP 71130.08 000740 Fitness-For-Duty Program
RP PI Verification 71151 - BV 1
1,2 12/15/2025 12/19/2025 IP 71151 000746 Performance Indicator Verification
Commercial Grade Dedication - Beaver Valley 3
1,2 2/9/2026 2/13/2026 IP 71111.21N.03 001808 Commercial Grade Dedication
Prepared on 8/14/2024 2:20:58 PM 2 of 3 Site Inspection Activity Plan
1,2 2/23/2026 2/27/2026 IP 71111.21N.03 001808 Commercial Grade Dedication
BV1 Biennial Requal Inspection 2
1 3/9/2026 3/13/2026 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance
License Renewal Phase 1 - Beaver Valley Unit 2 1
2 4/27/2026 5/8/2026 IP 71003 000687 Post-Approval Site Inspection for License Renewal
Inservice Inspection - Beaver Valley Unit 2 1
2 4/27/2026 5/8/2026 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
RP Rad Hazard Assessment and Exposure Control 71124.01 - BV 1
1,2 4/27/2026 5/1/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
Sec - Access Control, Equipment Testing and Maintenance, Training, SPR, PI Verification - BV 3
1,2 6/1/2026 6/5/2026 IP 71130.02 000734 Access Control
1,2 6/1/2026 6/5/2026 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance
1,2 6/1/2026 6/5/2026 IP 71130.07 000739 Security Training
1,2 6/1/2026 6/5/2026 IP 71130.09 001656 Security Plan Changes
1,2 6/1/2026 6/5/2026 IP 71151 001338 Performance Indicator Verification
EP Exercise Inspection - Beaver Valley 5
1,2 6/8/2026 6/12/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
1,2 6/8/2026 6/12/2026 IP 71114.07 000722 Exercise Evaluation - Hostile Action (HA) Event
1,2 6/8/2026 6/12/2026 IP 71151 001397 Performance Indicator Verification
Prepared on 8/14/2024 2:20:58 PM 3 of 3