Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Summary of 820831-0903 Instrument & Control Site Audit". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML17139A953  + (Summary of 820713 Meeting W/Util & Bechtel & Structural Mechanics Assoc Re Revisions to Horizontal Dynamic Analysis)
  • ML20058F576  + (Summary of 820713 Meeting W/Util & Westinghouse Re Accuracy of Control Rod Position Indication.Technical Rept Requested by 820930)
  • ML17341B310  + (Summary of 820713-15 Exit Interview Following Audit of Pressurized Thermal Shock in-plant Training Program & Operating Procedures)
  • ML20062B558  + (Summary of 820714 Meeting W/Applicant,Ge,Bechtel & Consultants in Bethesda,Md Re Mark III Containment Concerns of J Humphrey.Details of Action Plan & Schedule & Tentative Agenda for ACRS 820729-30 Meeting Encl)
  • ML20058F535  + (Summary of 820714 Meeting W/Exxon Nuclear Co in Bethesda,Md Re Status of NRC Review of Generic & plant/cycle-specific Topical Repts on Fuel Reloads & BWR Reload Licensing Procedure.List of Attendees & Viewgraphs Encl)
  • ML20062B617  + (Summary of 820714 Meeting W/Util & Westinghouse in Bethesda, MD Re Exams & Evaluations Concerning Thermal Sleeves)
  • ML18017B973  + (Summary of 820715 & 16 Meetings W/Util in Raleigh,Nc Re NRC Questions Resulting from Review of QA Program)
  • ML20027B959  + (Summary of 820715 Meeting W/Util Re Facility QA Concerning Recent Design & Const Deficiencies.Applicant Considering Another Independent Design Review Re Core Spray Sys)
  • ML17139A979  + (Summary of 820716 Meeting W/Teledyne Engineering Svcs,Util & Bechtel Re Independent Design Review of Feedwater Sys)
  • ML20058F187  + (Summary of 820720 Meeting W/Util Re Facility Plans for ATWS)
  • ML20058F186  + (Summary of 820720 Meeting W/Util in Bethesda,Md Re Applicant Cold License Operator Training Program.Training of Initial Senior Operator Candidates Will Start in Aug 1982.Applicant Training Program Acceptable)
  • ML20027B992  + (Summary of 820720 Meeting W/Utils & United Engineers & Constructors in Bethesda,Md Re Associated Circuits. Presentation Outline & Details of Preliminary Review & Analysis of Associated Circuits FSAR Change Encl)
  • ML20062B209  + (Summary of 820721 Meeting W/Westinghouse,Anl,Bechtel,Tsi, Cnasco & Utils in Bethesda,Md Re Progress in Resolving Accelerated Tube Wear at Operating Plants W/Westinghouse Model D Steam Generators)
  • ML20126B684  + (Summary of 820721 Meeting w/util,B&W,Foster-Wheeler (F-W) & Franklin Research Ctr in Livingston,Nj to Discuss Qualification Test Program for F-W Sleeving Process Used in Steam Generator Restoration Program.Agenda Encl)
  • ML13308A176  + (Summary of 820729 Meeting W/Util & Contractors Re ESF Actuation Sys Surveillance Requirements.Addl Info Requested to Support Proposed Tech Spec Changes)
  • ML13324A157  + (Summary of 820729 Meeting W/Util in Bethesda,Md Re Inadequate Core Cooling Instrumentation & Status of Design, Const & Startup Schedule)
  • ML17297B662  + (Summary of 820803-05 Site Audit W/Util,Eg&G,Bechtel & C-E Re Pump & Valve Operability)
  • ML13333B779  + (Summary of 820804 Meeting W/Util,Consultants & Sierra Geophysical in Bethesda,Md Re Appropriate Facility Ground Motion Spectrum.Licensee Conducting Seismic re-evaluation Per SEP Topic III-6.List of Attendees & Viewgraphs Encl)
  • ML17319B495  + (Summary of 820805 Meeting W/Exxon Nuclear Co & American Electric Power Co Re Cycle 4 Reload Application)
  • ML17319B486  + (Summary of 820805 Meeting W/Util & Exxon Nuclear Co in Bethesda,Md Re Application for Uprating of Power & Change of Fuel from Westinghouse to Exxon for Cycle 4 Reload)
  • ML17139B007  + (Summary of 820805 Meeting W/Util,Bechtel & Henry Pratt Co Re Qualification of Containment Purge & Vent Valves)
  • ML20126B592  + (Summary of 820809 Meeting W/Util Re Steam Generator Eddy Current Testing Program.Supporting Documentation Encl)
  • ML20086P034  + (Summary of 820813 Meeting W/Util at Site Re Cracking & Recirculation Loop Piping Replacement Plans)
  • ML18018A364  + (Summary of 820816-19 Meeting W/Util,Ebasco & Westinghouse Re Design Review of Instrumentation & Control Sys for Facilities.Followup Meeting Scheduled for 820914-16 in New York City,Ny)
  • ML13333B776  + (Summary of 820819 Meeting W/Util,Bechtel & Eds Nuclear Re Licensee Evaluation of Effects of Pipe Breaks,In Particular, Review Assumptions,Criteria & Methods (SEP Topics III-5.A & III-5.B).List of Attendees Encl)
  • ML17213A775  + (Summary of 820831-0903 Instrument & Control Site Audit)
  • ML20028B815  + (Summary of 820903 Meeting W/Util,Ge,Fauske & Associates,Inc, Bnl,Nus,Science Applications,Inc,Commonwealth of PA, Limerick Ecology Action & Applicant Counsel in Bethesda,Md Re PRA)
  • ML13308A191  + (Summary of 820906-09 Meeting W/Util in Anaheim,Ca Re Natural Circulation Test Conducted at Low Power.Trip Rept Encl)
  • ML13333B783  + (Summary of 820908 Meeting W/Util Re Licensee Proposed Mods to Safety Injection Sys,Developed in Response to 810903 Event Involving Failure of Valves to Open.Current & Proposed Modified Sys Encl)
  • ML20027C023  + (Summary of 820908 Steering Committee Meeting W/Idns,State of Il,Usgs & Us Ecology to Discuss Results of Phase II Portion of Tritium Migration Study & to Determine Need for Phase II Investigations.Exhibits Encl)
  • ML13333B788  + (Summary of 820909 Meeting W/Util & Consultants Re Licensee Analyses of Steam Generator Tube Vibration,Fretting & Nonlinear Vibration,Foreign Matls Insp & Steam Generator Wrapper Supports Investigation.Viewgraphs Encl)
  • ML17139B113  + (Summary of 820909 Meeting W/Util & Stannard & Co Re Configuration of Gas Pipeline Near Plant Site)
  • ML17139B111  + (Summary of 820909 Meeting W/Util,Teledyne Engineering Svcs (Tes),Bechtel & Nutech Re Conclusion of Tes Final Rept Issued on Review of Feedwater Sys Inside Containment.List of Attendees Encl)
  • ML17095A455  + (Summary of 820910 Meeting W/Util & Rf Reedy,Inc Re QA Audit of in-house Design)
  • ML17276B712  + (Summary of 820913-14 Meetings in Walnut Creek,Ca Re Cable Separation Criteria)
  • ML13308A187  + (Summary of 820914 & 20 Meetings W/Util Re Util 820802 Request That NRC Waive Required Written & Oral Tests & Grant Unit 3 Reactor Operator & Senior Reactor Operator Licenses to Currently Licensed Unit 2 Operators)
  • ML17213A509  + (Summary of 820914 Meeting W/Util in Bethesda,Md Re App R Review of Alternate Safe Shutdown Capability)
  • ML20127A390  + (Summary of 820914 Meeting W/Util,Southern Co Svcs,Inc & Bechtel in Bethesda,Md Re Millett Fault Study)
  • ML17213A638  + (Summary of 820914 Meeting w/util,C-E & Ebasco in Bethesda,Md Re Engineering Verification Program)
  • ML18018A378  + (Summary of 820914-16 Meetings W/Util,Westinghouse & Ebasco at Ebasco Ofc Re Design Review of Instrumentation & Control Sys.Attendance List Encl)
  • ML20132F082  + (Summary of 820915 Meeting W/Util in Chicago,Il Re Proposed Util Investigation Into Gap Allegations Concerning Facilities.Util Agreed to Delay Investigation Until NRC Completes Investigation.Related Info Encl)
  • ML18018A377  + (Summary of 820921 Meeting W/Applicant,Westinghouse,Ebasco & Eg&G at Site Re Reactor Sys Branch 820426 Questions Concerning Fsar.Attendance List Encl)
  • ML17297B751  + (Summary of 820923-24 Meetings W/Util in Bethesda,Md Re Applicant Proposed Radiological Ets.Attendance List Encl)
  • ML20027C359  + (Summary of 820928-30 Meeting & Site Visit W/Util & Bechtel Re Masonry Wall Design.Addl Info Requested Re in-plane Response Effects on out-of-plane Responses & Documentation of Verification of Programs)
  • ML20069K566  + (Summary of 820929-30 Meeting W/Independent Design Review Group of Model D2/D3 Steam Generator Owners & Anl Re Review of Westinghouse Program for Correcting Damaging Tube Vibration)
  • ML13333B800  + (Summary of 821001 Meeting W/Util in Bethesda,Md Re Scope of Seismic re-evaluation Program.Addl Info Re Vent Stack, Electrical Equipment & Instrument Supports Required)
  • ML20127A310  + (Summary of 821001 Meeting W/Util in Bethesda,Md Re Const Completion Date.Based on Present Estimated Core Load Date, OL Should Be Issued in mid-Dec)
  • ML17213A695  + (Summary of 821012 Meeting W/Util & Ebasco in Bethesda,Md Re Closeout of Power Sys Branch Issues Identified During 820830 Visit)
  • ML17213A672  + (Summary of 821012 Meeting W/Util in Bethesda,Md Re Pressure Isolation Valve Leak Testing)
  • ML17213A671  + (Summary of 821013 Meeting W/Util,Ebasco & C-E in Bethesda,Md Re Actions Needed to Resolve Seismic Qualification Review Team & Pvort Issues)
  • ML20027D745  + (Summary of 821013 Meeting W/Utils Re Cycle 7 Reload Submittals.Open Questions Encl)