Summary of 820816-19 Meeting W/Util,Ebasco & Westinghouse Re Design Review of Instrumentation & Control Sys for Facilities.Followup Meeting Scheduled for 820914-16 in New York City,Ny
ML18018A364
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 09/08/1982
From: Licitra E
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8210130053
Download: ML18018A364 (7)


Text

Docket Nos.:

50-400 and 50-401

.SEP 8

f982 APPLICANT:

Carolina Power 5 Light Company FACILITY:

Shearon Harris. Units 1 and 2

SUBJECT:

SUI/LMARY OF TK DESIGN REVIEW IIEETING FOR SHEARON HARRIS A meeting was held,it the Shearon Harrispsite on August 16-19; 1982.

The purpose of the meeting was to conduct a/design review of the l8C systems for Shearon Harris as presented in the FSAR.

The agenda for the meeting was transmitted to the applicant by letter dated. July 30, 1982.

Meeting attendees are listed in Enclosures 1 and 2.

The meeting is summarized as follows:

~Summal The applicant and its contractors, Westinghouse and Ebasco, made presen-tations with the use of detailed drawings to address a number of the 56 items included as an enclosure to the July 30, 1982 'letter.

As a result, the staff determined that Items 2(e), 2(f), 3, 9, 23(a), 25, 26, 31, 34(d),

34(f), 35, 36, 39, 40, 43, 52, 53 and 56 were sufficiently described in the FSAR so that no further information was required for those items.

For a number of items (i.e., remainder.of 2, 10, 13-16, 18-21. 27, 47-49, and 51), additional clarifying information is required which the applicant agreed to provide by September 30, 1982.

The remaining items will be discussed with the applicant at a follow-up meeting to.be held in mid-September at the office of Ebasco in New York City.

Subsequently, the follow-up meeting was scheduled for September 14-16, 1982.

Orna~ Saba Z<:

OFFICE/

SURNAME/

¹3

~ ~ 0

~Otti

~

glia

/0 )0 Ps 0 ~ ~ ~ ~ ~

HLicitra:ph f/f/82 DATEQ

Enclosures:

1.

Meeting Attendees - 8/16, 17/82 2.

IIeeting Attendees -. 8/18, 19/82

~:~ne.d ~

I 8210i30053 820908 I PDR ADOCK 05000400 A...,.

PDR pL:LB@//(, -pt~gg p

~ee-E. A. Licitra, Project Manager Licensing Branch No. 3 Division of Licensing E

~ 0 ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 ~ ~ a ~I~ 0 ~ 0 ~ 0 ~

~ 0 ~ ~ ~ ~ ~ ~ 0tt0 ~ a ~ 0 ~ 0 ~ 0 ~ 00 ~

NRC FORM 318 tIO-80) NRCM 0240 OF ICIALRECORD COPY USO PO: 198 I~~i980

T I

SHEARON HARRIS Nr. J. A. Jones Vice Chairman Carolina Power 5 Light Company Post Office Box 1551

Raleigh, North Carolina 27602 George F. Trowbridge, Esq.
Shaw, Pittman, Potts 8

Trowbridge 1800 N Street, N. M.

Mashington, D. C.

20036 Richard E. Jones, Esq.

Associate General Counsel Carolina Power 5 Light Company 411 Fayetteville Street Mall

Raleigh, North Carolina 27602 Thomas S. Erwin, Esq.

115 M. Morgan Street

Raleigh, North Carolina 27602 N. David Gordon Attorney Associate General State of North Carolina P. 0.

Box 629

Raleigh, North Carolina 27602 George maxwell Resident Inspector/Harris NPS c/o U. S. Nuclear Regulatory Coranission Route 1, Box 3158 New Hill, North Carolina 27562 Charles D. Barham, Jr.

Vice President and Senior Counsel Carolina Power 5 Light Company Post Office Box 1551

Raleigh, North Carolina 27602 John Runkle, Executive Coordinator Conservation Council of North Carolina 307 Granville Rd.

Chapel Hill, North Carolina 27514 Mells Eddleman 718-A Iredell Street Durham, North Carolina 27705 George Jackson, Secretary Environmental Law Project School of Law, 064-A University of North Carolina Chapel Hill, North Carolina 27514 Dr. Phyllis Lotchin 108 Bridle Run Chapel Hill, North Carolina 27514 Nr. Travis Payne, Esq.

723 M. Johnson Street P. 0.

Box 12643

Raleigh, North Carolina 27605 Daniel F. Read, President CHANGE P. 0.

Box 524 Chapel Hill, N.C.

27514 Patri ci a T.

Newman, Co-Coordi nator Slater E.

Newman, Co-Coordinator Citizens Against Nuclear Power 2309 Meymouth Ct.

Raleigh, N.C.

27612 Richard D. Milson, N.D.

725 Hunter St.

Apex, N.C.

27502 Regional Administrator-Regional II U.S. Nuclear Regulatory 101 Marietta Street Suite 3100 Atlanta, Georgia 30303

4

~

~

~%

ENCLOSURE 1

I&C MEETING ON SHEARON HARRIS ATTENDEES - 8/16

& 17/82 NAME Andrea Sterdis J.

C. Mesmeringer P. I. Hayford G. J.

Corpora D.

S.

Ackerson F.

W. Marasco Shamsul Abedin M. A. Weaver T.

G.

Dunning H.

C. Li J.

S.

Pfabe J.

F. Garibaldi W. J.

Pehush M. Mazurek R.

W. Prunty John Eads Bob Delcastilho*

COMPANY W

W W

W W

W W

W NRC NRC Ebasco Ebasco Ebasco Ebasco CP&L CP&L CP&L

  • 8/17/82 only

< ~

J

~

~

ENCLOSURE 2

ISC MEETING ON SHEARON HARRIS ATTENDEES - 8/18 5'19/82 NAME J.

H.

Eads R.

W. Prunty Bob DelCastilho E. A. Licitra H.

C. Li T.

G. Dunning Myron Mazurek John Pfabe W. J.

Pehush John F. Garibaldi R. I. Hayford*

J.

C. Mesmeringer*

M. A. Weaver*

COMPANY CPS(L CPSL CPSL NRC NRC NRC Ebasco Ebasco Ebasco Ebasco W

W W

  • 8/18/82 only

DISTRIBUTION:

meeting Summary (Shearon Harris) glocament Control 50-400/401 NRC PDR L PDR TERA NSIC LB83 File JLee NLicitra CBarth ISE Regional Admin., Region II Resident Inspector NRC

Participants:

T.G, Dunning H.C. Li cc; Service List