Text
Docket Nos. ~-N~
50-316 LICENSEE:
FACILITY:
SUBJECT:
Indiana and Michigan Electric Company Donald C. Cook Nuclear Plant Unit No.
2 gw)wsW SUMtSRY OF l1EETING HELD ON JULY 5, 1982 TO DISCUSS THE D. C.
COOK UNIT 2 CYCLE 4 RELOAD APPLICATION Back round The meeting was held in room P-110 in the NRC headquarters at 7920 Norfolk Avenue, Bethesda, Maryland.
Attendees are listed in Enclosur e l.
By letter dated April 7, 1982, the licensee applied for an uprating of power and change of fuel from llestinghouse to EXXON (ENC) for the cycle 4 reloading of the D. C.
Cook Nuclear Plant Unit No. 2.
The licensee requested an increase in the reactor thermal power limit of Unit 2 from its present value of 3391 Hilt to 3411 tilt (Approximate increase of 0.6%)
to become effective at the Cycle 4 Restart of Unit 2 on December 10, 1982.
Cycle 4 will include seventy-two 17xl7 ENC fuel assemblies in Region 6, in addition to the Westinghouse fuel assemblies remaining in the core from fuel Regions 3, 4 and 5.
There will be approximately 544 burnable poison rodlets employed in Cycle 4.
The nominal cycle 4 design burnup is 14,150 hIllD/MTU.
This application consists of six attachments as follows:
Attachment l.
2.
3.
5.
6.
Contents Description Table of Cycle 4 List of ENC Topical Reports Tech Spec change for Section 1,3 Tech Spec change to Table 2.2-1 Summary of new and spent fuel storage array criticality safety analyses Tech Spec changes to 5.3.1, 5.6.1.1, 5.6.1.2 and 5.6.2 NRR Technical review of this application was initiated by ORB 81 on April 28,
- 1982, and accepted by the Core Performance Branch (CPB) on May 28, 1982, and the Reactor Systems Branch on July 14, 1982.
8208270622 8208ii PDR ADOCK 050003ih P
PDR OFFICEI SURNAME/
OATE P
~ ~ ~
~
~ ~
o ~ ~
~
NRO FORM 318 (10-80) NRCM 0240 OFFlCIAL RECORD COPY
~
~
~
~ 00 ~ I ~ i~ 0 ~ ~ ~ ~ 0 ~ ~ ~ ~ ~ ~ ~ ~ ~
use pe: 1es1-ss~es0
f il II ~
h
~
~
~
~
Ag J
/
k
On August 2, 1982 the CPB and the RSB advised Varga and Cilimberg that NRR does not have the information from the licensee to support the review in time to permit restart of Unit 2 on 12/10/82.
On August 3, 1982, Varga and Cilimberg advised the licensee (R.
W. Hunter) that information was lacking in support of the December 10, 1982 restart of Unit 2.
The licensee requested the subject meeting with NRR to determine what action is needed by American Electric Power Corporation (AEP) and EXXON Nuclear Co.
(ENC) to ensure that the restart schedule is supported by HRR.
Neetin Summar Howard Sobel of AEP stated that D. C.
Cook Unit 2 cannot restart on December 10, 1982, if NRR does not approve the Cycle 4 Reload application.
The NRR technical reviewers described existing deficiencies and AEP and EXXON committed to providing the needed information on September 1, 1982 with the latest material to be in NRR hands no later than September 30, 1982.
Enclosure 2 documents specific information needed by CPB.
Other needed information was discussed by NRR reviewers with AEP and ENC committing to provide this information.
Les Rubenstein stated that his staff will do whatever is necessary to support the restart schedule.
Future Actions Responses to HRR requests for additional information will be expedited by AEP and ENC to meet the December 10, 1982, restart of D. C. Cook Unit 2.
Technical issues will be resolved directly between the HRR technical reviewers and ENC.
Any new pblems which could affect the schedule should be communicated to the NRR Prodect Manager for D. C.
~Coo Tar et Dates All AEP and Exxon Submittals to NRR NRR SER(s)
Complete NRC Fuel Pool Amendment Issued Other NRC Issued Amendments Unit 2 Cycle 4 Restart 9/30/82 11/10/82 9/1/82 12/10/82 12/10/82 QRIGIMXiSIC~
Ramon L. Cilimberg, Project Ihnager Operating Reactors Branch ¹1 Division of Licensing OFFICE/
SURNAMEIN As stated
~ ~ ~ ~ ~ ~ ~ ~ o ~ ~ ~ ~ ~ ~ ~ ~ o ~ ~ ~ o ~ o DATE$
~ ~ o ~ oooo ~ ooo oo ~ ~ o ~ oooo oo NRG FORM 318 u0-80) NRCM 0240 L:ORB¹1 o
~
~ o ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
RCi 1 imberg:
8/9 /82 DL:ORB¹1
~ s
,SAVarga, 8/
/82 OFFICIAL RECORD COPY VSGPO: 198)W5.960
1
~
'1
~ ~
K
~ 1 4 f1 1 ~ $
4 4
I KJ ~
'4 4
I I Kl f
~
4 14 4 K Kf, CK t J f
~ 1 114 da 4
.K ~
~ KV C,
KKft
~
J K
II K~
~ ~ '
~
~ KK-Qff KQ K
K ~
ll
~K
~ I 1 ~ Kfl ff K'J,I
- K ~
~ 4-
. ~ jj K
~
1 l KK K 'I ~-
f'WW I
~ f I
~
' *11
MEETING
SUMMARY
DISTRIBUTION OPERATING"REACTORS'BRANCH NO.
1 Docket/Central'ile NRC PDR Local. PDR ORB'8l Rdg.
J. Heltemes,,:
AEOD B. Grimes (Emergency Preparedness)
S. Yarga Project Manager OELD OISE-1 ACRS-10 NRC Participants cc: Licensee w/short cc list
Mr. John Dolan Indiana and Michigan Electric Company cc:
Mr. Robert W. Jurgensen Chief Nuclear Engineer American Electric Power Service. Corporation 2 Broadway New York, New York 10004 Gerald Charnoff; Esquire Shaw, Pittman, Potts and Trowbridge 1800 M Street, N.W.
Washington, D. C.
20036 Maude Preston Palenske Memorial Library 500 Market Street St. Joseph, Michigan 49085 W.
G. Smith, Jr., Plant Manager Donald C. Cook Nuclear Plant P. 0.
Box 458 Bridgman, Michigan 49106 U. S, Nuclear Regulatory Commission Resident Inspectors Office 7700 Red Arrow Highway Stevensville, Michigan 49127 William J. Scanlon, Esquire 2034 Pauline Boulevard Ann Arbor, Michigan 48103 The Honorable Tom Corcoran United States House of Representatives Washington, D. C.
20515 James G. Keppler Regional Administrator - Region III U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137
ATTENDEES LIST D. C.
COOK UNIT 2 CYCLE 4 RELOAD MEETING AUGUST 5, 1982, 1:00'P.M.
Room P-110 NAME R. Cilimberg L. Rubenstein L. Phillips J. Holonich G. Schwenk D. Fieno W. Brooks M. Tokar S.
Mu F. Orr R. Licciardo J. Mitchell M. Alexich H. Sobel J. Heiss J. DelPercio G. Owsley
, T. Patten G.
Cooke J.
Morgan ORGANIZATION NRR/DL/ORB, ¹1 NRR/AD/Core.and Pl NRR/CPS/CPB NRR/CPS/CPB NRR/CPS/CPB NRR/CPS/CPB NRR/CPS/CPB NRR/CPS/CPB NRR/CPS/CPB NRR/RS/RSB NRR/RS/RSB NRR/RD/AEB American Electric American Electric American Electric American Electric Exxon Nuclear Co.
Exxon Nuclear Co.
Exxon Nuclear Co.
Exxon Nuclear Co.
ant Systems Power (AEP)
Power (AEP)
Power (AEP)
Power (AEP)
(ENC)
(ENC)
(.ENC)
(.ENC}