Summary of 820721 Meeting w/util,B&W,Foster-Wheeler (F-W) & Franklin Research Ctr in Livingston,Nj to Discuss Qualification Test Program for F-W Sleeving Process Used in Steam Generator Restoration Program.Agenda Encl
ML20126B684
Person / Time
Site: Crane Constellation icon.png
Issue date: 07/30/1982
From: Ebneter S
NRC
To:
NRC
Shared Package
ML20126B295 List: ... further results
References
FOIA-84-897 NUDOCS 8506140182
Download: ML20126B684 (5)


Text

. _ _ _ _

.g

,...f.

(

i~

g JUL 3 0'1982 MEMORANDUM FOR:

FILE - Docket No. 50-289

FROM

Stewart D. Ebneter, Chief

-Engineering Programs Branch

SUBJECT:

MEETING - TMI-1 STEAM GENERATOR REPAIR Purpose of Meeting A meeting was held at the Foster-Wheeler (F-W) offices located in Livingston, New Jersey on July 21, 1982 to discuss the qualification test prcgram for the.F-W sleeving process to be used in the TMI-1 steam generator restoration program. The objectivesof the meeting were to:

,1.

Present status of GPU, B&W and F-W sleeving program.

2.

Coordinate GPU program with NRC contractor program.

Attendees NRC S. D. Ebneter - Region I-R. Jacobs - NRR C. McCracken - NRR

" General Public Utilities (GPU)

M. J. Graham - Licensing Babcock and Wilcox'(B&W)-

Philip Troy R. Coe Foster Wheeler (F-W)

~

David Pai Irwin Berman C. F. Nash Wayne Schroeder K. S. Ahluwalia Franklin Research Center (FRC)

-Ted Shook Charles T. Davey

"~

8506140182 850125 PDR FOIA DET6-397 PDR

=

S*a2.

. ~..

7_

p.

o

~ Aaenda'-

The meeting agenda'is attached hereto as enclosure 1.

. Significant Items The B&W test program should -provide objective data to support a confidence level of.99% in_the sleeving process based on quantitive pull test loads and leak ~ rate tests.

'B&W. test blocks are in preparation. Blocks C, D'and'E are on the critical path to: demonstrate acceptability prior to intiation of repairs. Se attached schedule - enclosure 2.

.B&W will prepare test blocks for the NRC program and F-W.

These blocks are behind schedule.

Preliminary, tests and evaluation by.B&W and F-W have been positive. Accept-ance criteria for pullout tests and leak rate have beep met. The expansion length has been established and explosive charge volumes determined.

F-W t

and B&W are ready to proceed to the QA. controlled test program.

The QA controlled. test program sequence, applied stress and sample size have been determined. Minor changes may be made as a result of NRC concerns.

The-test program details,-including procedures, are considered proprietary E-and will be transmitted to NRC with the appropriate affidant in accordance with 10 CFR 2.790 provisions.

'A meeting is scheduled at TMI-l on August 29, 1982 to discuss eddy current test results.-

.There will be a demonstration of the F-W explosively expanded sleeving process on a mock up SG at B&W, Mt. Vernon, Indiana facility on August 5,1982.

Y Stewart D. Ebneter, Chief Engineering Programs Branch cc:

i T. T.' Martin-1 R. W.-Starpstecki H. Grayf /

J.-P. Durr e

l u

-~~i_

TMI-1 TUBE REPAIR QUALIFICATION PROGRAM SCHEDULE i

t WEEK BEGINNING-+

JULY AUGOST SEPTEMBER TEST 19 26 2

9 16 l

23 30 l

6 13 20

,plJoJ"

,a osF /u do u hadere ogs'n s'In ei-F'C,D,E 1,2

,3, 4

5 8,

4 B

',1,2 8.

,o))

Vo C

A

.1,2.3, 5

. 2. 5 4

5

.8.

8 F

, 1,2

,3, 4

5

'8 a.

SP2 1,2, 3,

4

,5

,5

, 8, g

x P

SP1 1,2,3 5

4 6

5 5

,7 8

g e

A

'RESbTRESS'

.le R 9

9 i

3.,i,(

IND. STRAIN 1,2,9 ACTIVITY (6',P 1.

' RECEIVE AND PREPARE p, '

ANNULUS SIZE

.1,2,

8 2.

EXPAND

-d 3.

PROOF TEST l

f/p 4.

THERMAL CYCLE l

. CORR. CREVICE

.L 2.

8 5.

LEAK TEST

[

9F 6.

AXIAL LOAD CONDITION DV 7.

BUBBLE TEST ORD. CORD

-8.

PULLOUT TEST f

9.

TEST MEASUREMENTS t

G ~~,

?-

W.-

g:

(',

u.

ENCLSOURE 1 NRC/ FRANKLIN INSTITUTE JULY 2L 1982 MEETING AGENDA (1)

DECI'SIONS.MADE TO-DATE WITH REGARD TO THE REPAIR PROGRAM AND THOSE REMAINING.

(2)

STATUS OF QUALIFICATION PROGRAM.

~ (3)

PRELIMINARY RESULTS.OF THE QUALIFICATION PROGRAM.

(4)

SCHEDULE OF THE-QUALIFICATION-PROGRAM.

(5)

DATE'.FOR' FRANKLIN INSTITUTE'S RECEIPT OF TEST BLOCKS.

(6)

PROCEDURES AVAILABLE FOR FRANKLIN INSTITUTE INFORMATION.

--,.-..~s-

- -. - - - - - - - _. - - - - - _ _ - - -. -. _, - - - -. - = = - -. - - - - - =. ~ - -.

a l '

J d h.h O

G

_ey 3

o 9

. c, o

e

~.

4 m

9 9

A G

9 e

4 1

'l

/

M,.JA -

h/C -

y

-~

aA (2/d "p

(

124 ~/0 Am" M

c. C. h 7:

tycA..#

d4-y_ aus 6M

(

a 8

O 6

8 9

.. =,

e p

s d

s*, ?-,

g,

  • 5
  • .?,9
  • 4_

y g

~

~

m,~~<.-

.. _.