g JUL 3 0'1982 MEMORANDUM FOR:
FILE - Docket No. 50-289
- FROM
Stewart D. Ebneter, Chief
-Engineering Programs Branch
SUBJECT:
MEETING - TMI-1 STEAM GENERATOR REPAIR Purpose of Meeting A meeting was held at the Foster-Wheeler (F-W) offices located in Livingston, New Jersey on July 21, 1982 to discuss the qualification test prcgram for the.F-W sleeving process to be used in the TMI-1 steam generator restoration program. The objectivesof the meeting were to:
,1.
Present status of GPU, B&W and F-W sleeving program.
2.
Coordinate GPU program with NRC contractor program.
Attendees NRC S. D. Ebneter - Region I-R. Jacobs - NRR C. McCracken - NRR
" General Public Utilities (GPU)
M. J. Graham - Licensing Babcock and Wilcox'(B&W)-
Philip Troy R. Coe Foster Wheeler (F-W)
~
David Pai Irwin Berman C. F. Nash Wayne Schroeder K. S. Ahluwalia Franklin Research Center (FRC)
-Ted Shook Charles T. Davey
"~
8506140182 850125 PDR FOIA DET6-397 PDR
=
S*a2.
. ~..
7_
p.
o
~ Aaenda'-
The meeting agenda'is attached hereto as enclosure 1.
. Significant Items The B&W test program should -provide objective data to support a confidence level of.99% in_the sleeving process based on quantitive pull test loads and leak ~ rate tests.
'B&W. test blocks are in preparation. Blocks C, D'and'E are on the critical path to: demonstrate acceptability prior to intiation of repairs. Se attached schedule - enclosure 2.
.B&W will prepare test blocks for the NRC program and F-W.
These blocks are behind schedule.
Preliminary, tests and evaluation by.B&W and F-W have been positive. Accept-ance criteria for pullout tests and leak rate have beep met. The expansion length has been established and explosive charge volumes determined.
F-W t
and B&W are ready to proceed to the QA. controlled test program.
The QA controlled. test program sequence, applied stress and sample size have been determined. Minor changes may be made as a result of NRC concerns.
The-test program details,-including procedures, are considered proprietary E-and will be transmitted to NRC with the appropriate affidant in accordance with 10 CFR 2.790 provisions.
'A meeting is scheduled at TMI-l on August 29, 1982 to discuss eddy current test results.-
.There will be a demonstration of the F-W explosively expanded sleeving process on a mock up SG at B&W, Mt. Vernon, Indiana facility on August 5,1982.
Y Stewart D. Ebneter, Chief Engineering Programs Branch cc:
i T. T.' Martin-1 R. W.-Starpstecki H. Grayf /
J.-P. Durr e
l u
-~~i_
TMI-1 TUBE REPAIR QUALIFICATION PROGRAM SCHEDULE i
t WEEK BEGINNING-+
JULY AUGOST SEPTEMBER TEST 19 26 2
9 16 l
23 30 l
6 13 20
,plJoJ"
,a osF /u do u hadere ogs'n s'In ei-F'C,D,E 1,2
,3, 4
5 8,
4 B
',1,2 8.
,o))
Vo C
A
.1,2.3, 5
. 2. 5 4
5
.8.
8 F
, 1,2
,3, 4
5
'8 a.
SP2 1,2, 3,
4
,5
,5
, 8, g
x P
SP1 1,2,3 5
4 6
5 5
,7 8
g e
A
'RESbTRESS'
.le R 9
9 i
- 3.,i,(
IND. STRAIN 1,2,9 ACTIVITY (6',P 1.
' RECEIVE AND PREPARE p, '
ANNULUS SIZE
.1,2,
8 2.
EXPAND
-d 3.
PROOF TEST l
f/p 4.
THERMAL CYCLE l
. CORR. CREVICE
.L 2.
8 5.
LEAK TEST
[
9F 6.
AXIAL LOAD CONDITION DV 7.
BUBBLE TEST ORD. CORD
-8.
PULLOUT TEST f
9.
TEST MEASUREMENTS t
G ~~,
- ?-
W.-
- g:
(',
u.
ENCLSOURE 1 NRC/ FRANKLIN INSTITUTE JULY 2L 1982 MEETING AGENDA (1)
DECI'SIONS.MADE TO-DATE WITH REGARD TO THE REPAIR PROGRAM AND THOSE REMAINING.
(2)
STATUS OF QUALIFICATION PROGRAM.
~ (3)
PRELIMINARY RESULTS.OF THE QUALIFICATION PROGRAM.
(4)
SCHEDULE OF THE-QUALIFICATION-PROGRAM.
(5)
DATE'.FOR' FRANKLIN INSTITUTE'S RECEIPT OF TEST BLOCKS.
(6)
PROCEDURES AVAILABLE FOR FRANKLIN INSTITUTE INFORMATION.
--,.-..~s-
- -. - - - - - - - _. - - - - - _ _ - - -. -. _, - - - -. - = = - -. - - - - - =. ~ - -.
a l '
J d h.h O
G
_ey 3
o 9
. c, o
e
~.
4 m
9 9
A G
9 e
4 1
'l
/
M,.JA -
h/C -
y
-~
aA (2/d "p
(
124 ~/0 Am" M
- c. C. h 7:
tycA..#
d4-y_ aus 6M
(
a 8
O 6
8 9
.. =,
e p
s d
s*, ?-,
g,
- 5
- .?,9
- 4_
y g
~
~
m,~~<.-
.. _.