Text
~gp AEgg 0
0
+ uk**+
UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 August 'll, 'l982 ENCLOSURE 2
Docket Nos. 50-315 50-316 LICENSEE:
FACILITY:
SUBJECT:
Indiana and Michigap Electric Company Donald C. Cook Nuclear Plant Unit No.
2
SUMMARY
OF MEETING HELD ON AU& S~
)982 TO DISCUSS THE D. C.
COOK UNIT 2 CYCLE 4 RELOAD APPLICATION
~Back round The meeting was held in room P-110 in the NRC headquarters at 7920 Norfolk Avenue, Bethesda, Maryland.
Attendees are listed in Enclosure l.
By letter dated'pril 7, 1982, the licensee applied for an uprating of power and change of fuel from Westinghouse to EXXON (ENC} for the cycle 4 reloading of the D. C.
Cook Nuclear Plant Unit No. 2.
The licensee requested an increase in the reactor thermal power limit of Unit 2 from its present value of 3391 MWt to 3411 MWt (Approximate increase of 0.6%)
to become effective at the Cycle 4 Restart of Unit 2 on December 10, 1982.
Cycle 4 will include seventy-two 17xl7 ENC fuel assemblies in Region 6, in addition to the Westinghouse fuel assemblies remaining in the core from fuel Regions 3,
4 and 5.
There will be approximately 544 burnable poison rodlets employed in Cycle 4.
The nominal cycle 4 design burnup is 14,150 MWD/MTU.
This application consists of six attachments as follows:
Attachment 1.
2.
3.
4 ~
5.
6.
Contents Description Table of Cycle 4
List of ENC Topical Reports Tech Spec change for Section 1.3 Tech Spec change to Table 2.2-1 Summary of new and 'spent fuel storage array criticality safety analyses Tech Spec changes to 5.3.1, 5.6.1.1, 5.6.1.2 and 5.6.2 NRR Technical review of this application was initiated by ORB II1 on April 28,
- 1982, and accepted by the Core Performance Branch (CPB) on May 28, 1982, and the Reactor Systems Branch on July 14, 1982.
8209020102 820819 PDR ADOCK 05000316 P
,. P.DR
On August 2, 1982 the CPB and the RSB advised Varga and Cilimberg that NRR does not have the information from the licensee to support the review in time to permit restart of Unit 2 on 12/10/82.
On August 3, 1982, Varga and Cilinfberg advised the licensee (R. M. Hunter) that information was lacking in support of the December 10, 1982 restart of Unit 2.
The licensee requested the subject meeting with NRR to determine what action is needed by American Electric Power Corporation (AEP) and EXXON Nuclear Co.
(ENC) to ensure that the restart schedu'le is supported by NRR.
Meeti n Summa r Howard Sobel of AEP stated that D. C.
Cook Unit 2 cannot restart on December 10, 1982, if NRR does not approve the Cycle 4 Reload application.
The NRR technical reviewers described existing deficiencies and AEP and EXXON committed to providing the needed information on September 1, 1982 with the latest material to be in NRR hands no later than September 30, 1982.
Enclosure 2 documents specific information needed by CPB.
Other needed information was discussed by NRR reviewers with AEP and ENC committing to provide this information.
Les Rubenstein stated that his staff will do whatever is necessary to support the restart schedule.
Future Actions Responses to NRR requests for additional information will be expedited by AEP and ENC to meet the December 10, 1982, restart of D. C.
Cook Unit 2.
Technical issues will be resolved directly between the NRR technical reviewers and ENC.
Any new problems which could affect the schedule should be communicated to the NRR Project Manager for D. C.
Cook.
Tar et Dates 9/30/82 11/10/82 9/1/82 12/lo/82 12/10/82 fi'-. )
~ >+f+ ~~
Ramon L. Cilimberg, Prgect Manager Operating Reactors Branch Pl Division of Licensing Enc1osures:
As stated All AEP and Exxon Submittals to NRR NRR SER(s)
Complete NRC Fuel Pool Amendment Issued Other NRC Issued Amendments Unit 2 Cycle 4 Restart
Mr. John Dolan Indiana and Michigan Electric Company cc:
Mr. Robert W. Jurgensen Chief Nuclear Engineer American Electric Power Service Corporation 2 Broadway New York, New York 10004 Gerald Charnoff; Esquire Shaw, Pittman, Potts and Trowbridge 1800 M Street, N.W.
Washington, D. C.
20036 Maude Preston Palenske Memorial Library 500 Market Str eet St. Joseph, Michigan 49085 W.
G. Smith, Jr'., Plant Manager Donald C. Cook Nuclear Plant P. 0.
Box 458 Bridgman, Michigan 49105 U. S. Nuclear Regulatory Commission Resident Inspectors Office 7700 Red Arrow Highway Stevensville, Michigan 49127 William J. Scanlon, Esquire 2034 Pauline Boulevard Ann Arbor, Michigan 48103 The Honorable Tom Corcoran United States House of Representatives Washington, D. C.
20515 James G. Keppler Regional Administrator - Region III
. U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137
osure 1
ATTENDEES LIST D.
C.
COOK UNIT 2 CYCLE 4 RELOAD MEETING AUGUST 5, 1982, 1:00 P.H.
Room P-110 R.
L L.
J.
~ G.
D W.
H.
S.
F.
R.
~ J M.
H.
J.
J.
G.
T.
G.
J.
Cilimberg Rubenstein Phillips Holonich Schwenk Fieno Brooks Tokar Wu Orr Licciardo Mitchell Alexich Sobel Weiss DelPercio Owsley Patten Cooke Morgan ORGANIZATION NRR/DL/ORB Pl NRR/AD/Core and P
NRR/CPS/CPB NRR/CPS/CPB NRR/CPS/CPB NRR/CPS/CPB NRR/CPS/CPB
'RR/CPS/CPB NRR/CPS/CPB NRR/RS/RSB NRR/RS/RSB NRR/RD/AEB American Electric American Electric American Electric American Electric Exxon Nuclear Co.
Exxon Nuclear Co.
Exxon Nuclear Co.
Exxon Nuclear Co.
lant Systems Power (AEP)
Power (AEP)
Power (AEP)
Power (AEP)
(ENC)
(ENC)
(ENC)
(.ENC)