Summary of 820714 Meeting W/Applicant,Ge,Bechtel & Consultants in Bethesda,Md Re Mark III Containment Concerns of J Humphrey.Details of Action Plan & Schedule & Tentative Agenda for ACRS 820729-30 Meeting Encl
ML20062B558
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 07/26/1982
From: Houston D
Office of Nuclear Reactor Regulation
To: Schwencer A
Office of Nuclear Reactor Regulation
References
NUDOCS 8208040581
Download: ML20062B558 (24)


Text

, -. .- . . - - - . - - - _

Y .

an= =" y s- c/G Docket Nos.: 50-416/417 '

MEMORANDUM FOR: A. Schwencer, Chief, Licensing Branch No. 2, DL

, FROM: D. Houston, Project Manager, Licensing Branch No. 2, DL

SUBJECT:

SU M ARY OF JULY 14, 1982 MEETING WITH MP&L ABOUT l HUMPHREY'S MARK III CONTAINMENT CONCERNS I

l On July 14, 1982, a meeting was held in Bethesda, Maryland to discuss -

Mr. John Humphrey's concerns about the Grand Gulf Mark III containment system. These concerns were given in a transcript of a previous meeting held on May 27, 1982, and reported in our meeting sumary dated June 16,

. 1982. This meeting (July 14) was attended by representatives of NRC, MP&L, GE A-Es and consultants (See ' Attachment 1).

4

) The purpose of this meeting was to review MP&L's action plan and schedule i

for resolution of these containment concerns. The details of the action plan and schedule are given in the meeting handout (Attachment 2). A total of 46 issues were listed: 16 to be analyzed and submitted for review by August 19, 1982, an additional 22 by October 1,1982, and the

remaining 8 by November 1,1982. In the August 19 submittal, MP&L would
also provide a justification for full power operation for all items (30)

, not analyzed. MP&L discussed the benefits of postponing the August 19 l submittal. From a licensing position with a tentative Comission briefing

scheduled for early in September, we could not grant any slippage in the l August submittal date. The staff did agree to review the list of 46 issues
and prioritize them so that the August submittal would be more effective.

l l The staff discussed the NRC interest in a Peer Review Group to evaluate these conce.ms and the approach to resolution. MP&L was asked to pursue this matter with the other Mark III owners and attempt to establish such a group.

The forthcoming meetings in San Jose, Qilifornia were discussed. On July 22. GE and the BWR Owne r's Group will meet with Mr. Humptrey. NRC

, was-invited to attend as an observer and the Containment Systems Branch i

indicated they would send a representative. On July 29 and 30, the ACRS l subcommittee on Fluid Dynamics will meet to discuss these same containment concerns. A tentative agenda is . attached (Attachment 3). A detailed agenda for Item VII.of the ACRS meeting is given in the last three pages of the MP&L handout (Attachment 2).

l .? ,

/'.

8208040581 820726 PDR ADOCK 05000416 P

PDR

/ ]/ p L.icensing urancn no. z ornce>

sunmur)

..DI,1,9,u. ,,,,,r

()iv.ision..of.. Licensing..

k ..ha,b, , , , , , , , , , , . . .

.bhk.

.. A.Schwgn.cg.t.

(t.tidKm...en ...'t...... ss s: 'A.......flifsd.. . 7/ i 2 om ....y... 4g 7/hh./.82

...Q..

.g.g . 4.. . . . .. . ..

anc ronu sia oo.aomacu cas OFFTClAL RECORD COPY uscro. mi.-awm

, MEETING

SUMMARY

DISTRIBUTION:

DATE:

' NN' 2 E I92 Document Control (50- ) .

NRC PDR Local PDR PRC NSIC LB#2 Reading File NRC PARTICIPANTS:

EHylton M. Fields Project Manager D. Houston J. Kudrick E. Case F. Eltawila D. Eisenhut/R. Purple C. Hale (Reg. IV)

R. Tedesco D. Bucci (ACRS)

J. Youngblood , G. Quittschreiber (ACRS)

A. Schwencer D. Houston F. Miraglia E. Adensam SSPB G.'Lainas

, W. Russell l D. Crutchfield . _ .

T. Ippolito J. P. Knight N' hnston D l cc: See next page i T. Speis

R. Houston L. Rubenstein F. Schroeder M. Ernst J. Kramer Attorney, OELD Wagner "

0I&E Region II Reside'nt Inspector -

4

~

ACRS (16)

OSD (7) 4 e

1 s , _ .., , - - _ . - - _ -

. s . .

Mr.' J . P. McGaughy

  • Assistant Vice President Nuclear Production Mississippi Power & Light Company P. O. Box 1640 Jackson, Mississippi 39205 cc: Robert B. McGehee, Esquire
Wise, Carter, Child, Steen and Caraway P. O. Box 651 Jackson, Mississippi 39205

, Troy B. Conner, Jr., Esquire

Conner and Wetterhahn 1747 Pennsylvania Avenue, N. W.

Washington, D. C. 20006 Dr. D. C. GiDbs, Vice President Middle South Energy, Inc.

225 Baronne Street P. O. Box 6100 New Orleans, Louisiana 70161

~~

Mr. John Richardson

. . Mississippi Power & Light Company , .;

P. O. Box 1640 Jackson, Mississippi 39205 fir. R. Trickovic, Project Engineer Grand Gulf Nuclear Station Bechtel Power Corporation Gaithersburg,liaryland 20760 Mr. Alan G. Wagner Resident Inspector

. Route 2, Box 150

, Port Gibson, Mississippi 39150 4

i i

4 i . _ _ _ _. _

. =- _ . - .

~ '

Attachment 1 1

l Attendance List NRC-MP&L MEETING ON CONTAINMENT CONCERNS July 14, 1982 Bethesda, MD NRC E G_E M. Fields L. Richardson J. Kudrick H. Townsend' F. Eltawila M. Davis C. Hale (Region IV) L. Koke D. Bucci (ACRS) A. Smith G. Quittschreiber (ACRS) D. Gluntz D. Houston R. Villa MP&L Bechtel J. Richardson P. Kochis S. Hobbs D. Fouts 1 L. Dale R. Trickovic B. Evans 0. Doyle 3 Nutech Quadrex

0. Williams R. Valandani NNC i

L. Kornblith j

i

Attachment-2 d

J

  • 1 i

A GGNS/NRC PEETING i HUMPHREY CONCEPNS

! JULY If4,1982 i

. INTRODUCTION

. MP8L ACTION PLAN
DESCRIPTION OF PROPOSED ACTION i - SCHEDULE i

. ADDITIONAL HUMPHREY CONCERNS (6/17/82 LETTER)

. ACRS AGENDA / PRESENTATIONS

- NSSS/AE INTERFACE

- GENERIC EFFORTS / REVIEW GROUPS 4

j .

SUMMARY

1 1

t I -, - _ - . , , . - _ . . . , . . - . . . , -.r,,,-_,,,.. , _ _ , _ . . , _ , - , _ , . , , . , , . . - . - . -_,r,,. . . , . , . - ~.-_-_-_..,_y., - . . - ,. - - - . . . . . . . . . , . .

I

} FP8L 7/16/82 SUBMITTAL ACTION PLAN MATRIX CROSS REFERENCES ACT10ft PLANS TO ORIGitJAL ISSUES AND NRC lt! FORMATION REQUESTS ACTION PLAN

- LISTS ISSUES COVERED

- ACTION PLANf!ED TO RESOLVE

- SCHEDULE FOR COMPLETION JUSTIFICATION FOR FULL POWER LICENSE PROVIDES JUSTIFIC/. TION FOR FULL POWER LICENSE FOR ISSUES TJOT SCHFDULED FOR SUPNITTAL ON 8/19/82.

NEW ISSUES RESOLUTION PROVIDES RESPOi!SES TO NEw ISSUES FROM 6/17/82 LETTER Fi<0M HUMPHREY TO NRC

FAJOR CATEGORIES I. LOCAL ENCROACHMENTS

11. PERTURBATIONS IN LOAD DEFINITION CAUSED BY ANf1ULAR VENTS 111. UNACCOUNTED FOR RELIEF VALVE EFFECTS IV. SUPPRESSION POOL TEMPERATURE STRATIFICATION V. DRYWELL TO CONTAlWENT BYPASS LEAKAGE EFFECTS VI. RHR PERMISSIVE ON CONTAINHENT SPRAY Vil. CONTAlttEfff PRESSURE RESPONSES Vill. CONTAlttENT AIRMASS EFFECTS IX. ORYWELL AIRMASS EFFECTS X. WEIPMALL OVERFLOW XI. OWRAT10f!AL CONTROL OF DRYUELL TO CONTAltfENT DIFFERENTIAL PRESSURE-XIV. CONTAltFEAT SPRAY BACKFLOW XVI. EFFECT OF SUPPRESSION POOL LEVEL ON TEEPERATURE MEASURFFENT XIX. EFFECTS OF CilUGGING FROM LOCAL Ef4CROAO'lENTS AND AllDil10NAL SilfM:RGEECE
1. LOCAL ENCR0 AGENTS
1. FuntilSH DETAILS OF 1-DIMErlS10fiAL ANALYSIS WHICH PREDICTED 20% INCREASE IN POOL SWELL VELOCITY.

OCTOBER 1, 1982

2. USE 2-DIMErlS10NAL CODE TO f%KE BETTER PREDICTIONS OF POOL StELL VELOCITY.

- ADD BUBBLE MODEL TO SOLA

- SHOW POOL VELOCITY DECREASES NEAR ENCROACHMENTS

- USE EMPIRICAL DATA TO ESTABLISH BREAKTHROUGH OCTOBER 1, 1982

3. EVALUATE NEW SUBMERGED STRUCTURE L0fDS BASED UPON NEW POOL VELOCITY PROFILES.

- COMPARE P00L' VELOCITIES NEAR ENCROACif1ENTS WITH CLEAN POOL

- SHOW LOADS WITHIN CURRENT DESIGN BASIS NOVEMBER 1, 1982

5. EVALUATE BOUf' DING LOADS ON HCU SUPPORT STEEL PROVIDED BY LATERAL MOVEMENT OF POOL SWELL FROTH.

OCTOBER 1, 1982 l

_ _ _ . _ ---- ------------__- -----_ - _ - - - - - - - - - - - - - - - - - - - - - - - - J

l II. PERTURBATIONS IN LOAD DEFINITION CAUSED BY ANNULAR VENTS

1. EVALUATE A HARDWARE' MODIFICATION WHICH SEALS THE VENT PRODUCED BY THE ANNULUS BETWEEN THE SAFETY RELIEF VALVE DISCHARGE LINE (SRVDL) AND THE SRVDL SLEEVE.
2. SEAL IS AN EXPANDABLE ELASTOMER.
3. SEAL WILL WITHSTAND MAXIMUM TEMPERATURE PRESSURE, RADIATION AND OTHER ENVIRONMENTAL PARAMETERS.

OCTOBER 1, 1982

i l .

III. RHR HEAT EXCHANGER REl.lEF VALVE EFFECTS

1. CALCULATE VENT CLEARitzG LOADS FOR RHR HEAT EXCHANGER RELIEF VALVES.

OCTOBER 1, 1982

2. PROVIDE DETAILED INFORMATION ON OPERATION, ROUTING, DESIGN CAPACITY, AND PERFORf%NCE OF ALL RELIEF VALVES WHICH DISCHARGE TO THE SUPPRESSION POOL.

AUGUST 19,1982

3. PROVIDE DATA CN DISCHARGE SUBMERGENCE VERSUS CONDEtlSATION EFFECTIVENESS.

OCTOBER 1, 1982 11 . PERFORM FAILURE MODES EFFECTS ANALYSES ON RHR SYSTEM PRESSURE CONTROLLER.

AUGUST 19,1982

5. CALCULATE FIRST AND SECOND POP ACTUATION LOADS FOR THE RHR HEAT EXCHANGER RELIEF VALVE.

OCTOBEa 1,1982

6. EVALUATE THERf%L DISCHARGE PLUME INTO THE SUPPRESS 10f! POOL.

OCTOBER 1, 1982

IV. SUPPRESSION POOL TEMPERATURE STRATIFICATION j 'l. SUBMIT ANALYSIS DEMONSTRATito A SUPPRESSION POOL MAXIMUM INCREASE OF 6*F

IF THE DRYWELL POOL IS FORMED.

l AUGUST 19,1982

! 2. PREPARE A STUDY DOCUMENTING MAJOR CONSERVATISMS If4 THE SUPPRESSION POOL f TEMPERATURE ANALYSIS.

l - OUANTIFY INDIVIDUAL CONSERVATISMS j - SHOW OVERALL CONSERVATISM IS LARGE l OCTOBER 1, 1982

3. CALCULATE EFFECTS OF FAILURE TO RECOVER THE DRYWELL AIRMASS.

! OCTOBER 1, 1982 14 .

COMPLETE ANALYSIS TO QUANTIFY THE EFFECT ON CONTAINMENT RESPONSE OF HIGHER SUPPRESSION POOL SURFACE TEMPERATURE.

OCTOBER 1, 1982 j 5. PREDICT THE MAXIMUM DIFFERENCE BETWEEN THE SUPPRESS 10fl POOL BULK TEMPERt.TURE AND THE RHR HEAT EXCHANGER INLET TEMPERATURE.

OCTOBER 1, 1982

6. COMPLETE Af!ALYSES OR PROPOSE A TEST PLAN TO EVALUATF_ SUPPF,ESS10N POOL i

TEMPERATURE STRATIFICATION PRODUCED BY SWITCHING TO CONTAltlK UT SPRAY; AND UPPER POOL DUMP. TESTS WOULD ALSO COVER INTERACTION OF RHR SUCTION AND DISCHARGE.

AUGUST 19,1982 4

7. DEVELOP CRITERIA FOR. SWITCHING C0flTAINMENT SPRAY TO. SUPPRESSION POOL
C00Lil'G MODE AND VICE VERSA.
OCTOBER 1, 1982

'8. DOCUMENT THAT C0flTAINMENT SPRAY CAN WITHSTAND CYCLIC CPERATION.

! NOVEFBER 1, 1982 i

...._,,,-_,__._..__2_ ,_ --. - _ _ , , , . ~ _ = . - . . - _ . _ _ - - . . . - - _

l l

V. DRYWELL TO CONTAINWNT BYPASS LEAKAGE EFFECTS

1. COMPLElE A SPECTRUM CF BYPASS LEAKAGF. Af!ALYSES TO CCNFIRM ADEOUACY OF GGNS REPORTED CAPABILITY.

NOVEMBER 1, 1982

2. ASSESS THE POTENTIAL FOR POCKETING OF HYDROGEN WHICH LEAKS THROUGH THE DRYWELL.

AUGUST 19,1982

3. EVALUATE THE NEED FOR REDUCING ALLOWABLE LEAKAGE BASED UPON A PRESSURE OF 6 PSIG IN THE DRYWELL.

NOVEMBER 1, 1982

4. ESTABLISH THAI DRYWELL TEf?ERATURE RESP 0f!SE WILL NOT EXCEED 330 F WHErl DRYWELL PRESSURE IS LESS THAN 2 PSIG.

NOVEMBER 1, 1982 l

l

.VI. PJiR PERMISSIVE ON CONTAINMENT SPRAY

1. SUBMIT DRAWINGS SHOWING EQUIPMENT LOCATED NEAR RECOMBINERS.

AUGUST 19,1982

2. SUBMIT DRAWINGS SHOWING AREA ARRANGEMENT ABOVE THE REC 0f".BINERS.

AUGUST 19,1982

3. SUMMARIZE CRITERIA USED FOR ACTUATING THE C0tHAINMEtrT SPRAYS.

AUGUST 19,1982

l l

l VII. CONTAIWERT PRESSURE RESPONSES

1. COMPLETE ANALYSIS TO QUANTIFY THE EFFECT ON CONTAlif1ENT RESPONSE OF HIGHER SUPPRESSION POOL SURFACE TEMPERATURE.

OCTOBER 1, 1982

2. QUAtlTIFY THE CONSERVATISM INHERENT IN ASSUMING THERf%L EQUILIBRIUM BEWEEtt THE SUPPRESSION POOL AND THE CONTAINMENT ATMOSPHERE.

OCTCBER 1, 1982

3. PROVIDE A LIST OF ASSUMPTIONS USED TO CALCULATE THE EfNIRONMENTAL PARAMETERS.

OCTOBER 1, 1982

l l

1 f

VIII. CONTAIWmT AIRMASS EFFECTS

1. QUANTIFY CONSERVATISMS IN EXISTING COT TAINMEt!T PRESSURE AND TEMPERATURE RESPONSE AtlALYSES.

NOVEMBER 1, 1982

2. COMPLETE REAllSTIC ANALYSES TO DEMONSTRATE THAT EVEN WITH ALL PARAMETERS AT WORST CREDIBLE VALUES, THE EXISTING CONTAINMENT DESIGN PRESSURE IS ACCEPTABLE.

- CREDIT FOR HEAT SINKS

- AIR SPACE-TO-SUPPRESSION POOL TEMPERATURE DIFFERENCES NOVEMBER 1, 1982

3. ALTER THE GGNS TECHNICAL SPECIFICATION LIMITING CONDITIONS FOR C0t1TAINMENT TO AUXILIARY BUILDING DIFFERENTIAL PRESSURE.

COMPLETED 14 . CALCULATE MINIMUM AIR MASS WHICH CAN EXIST INSIDE CONTAINMENT AND EVALUATE THE WORST CASE NEGATIVE' PRESSURE TRANSIEt1T WHICH COULD RESULT FROM THIS LOW AIR MASS.

OCTOBER 1, 1982

IX. FINAL- DRWELL AIRMASS EFFECTS

1. CCF.PLETE A REALISTIC At:ALYSIS TO EVALUATE f%XIMUM PRESSURE INCREASE ATTRIBUTABLE TO THE DRYWELL AIR REf'AINING IN THE CONTAINMEf!T.

- CONTAlfFENT HEAT SIf!KS

- CONTAll>FENT SPRAYS OCTOBER 1, 1982

2. EVALUAT.E EFFECTS OF f%XIMUM LEAKAGE ON CONTAINMENT RESPONSE.

OCTOBER 30,1982 1

3. CONFIRM THAT SBA AND SORV ANALYSES ARE TREATED AS DESIGN BASIS ACCIDENTS.

AUGUST 19,1982

l t

X. HEIR \lALL OVERFLOW

l. PERFORM REVISED Af1ALYSIS TO ASSESS POTEt1TIAL FOR WEIRWALL OVERFLOW. THE NEW ANALYSIS WILL C0f1 SIDER SIGNIFICAtJT FACTORS WHICH AGGRAVATE OVERFLOW.

AUGUST 19,1982

2. PROVIDE DETAILS OF INTERFACE DOCUMEtlT WHICH C0tlTROLS DESIGft OF THE WEIR WALL.

AUGUST 19,1982 XI. OPERATIONAL C0ilTROL OF DRYlELL TO C0llTAINRNT DIFFERENTIAL PRESSURE.

1. DEFit E MAXIMUM POSSIBLE DIFFEREt!CES BETWEEN THE WEIR Af't'ULUS At1D SUPPRESSION POOL LEVELS.

AUGUST 19,1982

2. EVALUATE CHANGES IN THE HYDRODYNRilC LOADS hMICH IMY RFSULT FROM l@XIMUM POSSIBLE DIFFEREt!CES.

AUGUST 19,1982

s XIV. CONTAltfENT SPRAY BACKFL0d

1. OUANTIFY THE MAXIMUM BACKFLOW hillCH CAN OCCUR AND ASSESS ASSOCIATED EFFECTS ON CONTAINMENT RESPONSE.

OCTOBER 1, 1982

2. EVALUATE POSSIBILITY OF ADDING INTERLOCKS TO PREVENT SIMULTANEOUS ACTUATION OF THESE VALUES.

AUGUST 19,1982 XVI. EFFECT OF SUPPRESSION POOL LEVEL ON T&PERATUPE fEASUREENT

1. REVISE EMERGEf.'CY PROCEDURES TO REQUIRE OPERATOR TO CHECK POOL LEVEL PRIOR TO READING BULK POOL TEMPERATURE.

AUGUST 19,1982

., i j

,? /

I 1

i t ,

r $

S iI

' ' 4 i ,,

s t

qs <

< XTX, EFFECTS OF QiUGGlt1G FROM LOCAL ENCROACffElTS AND ADDITIONAL SUITERGENCE <

1. SUBMIT lhFORf% TION SHOWifiG THAT CHUG ING'IS:MORE DEIEfDEf1T ON MASS FLUX,

.0CTOBER 1, 1982

2. OUM!TIFY TO THE MAXIMUM EXTENT POSSIBLE IllERTIAL IMPEDANCE EFFECTS ON CHUGGING LOADS.

OCTOBER 1, 1982

3. EVALUATE ADEQUACY OF AVAILABLE MODELS 90P. PREDICTit'G IMPACT OF LOf'GER ACCUSTIC PATHS Off LOAD DEFINITION.

OCTOBEP.1,1982 ,

/

I i

,f

  • h' I A

1 a a

s I ,? l

, ,1 4

9

GGNS GE/EEOiTEL INTERFACE I. GE A. GE C0flTAlf:fENT DESIGN RESPONSIBILITIES B. GENERAL DESIGN Af;D If;TERFACE DOCUMENTS h

1. SPECIFICATIONS A) A62 - REQUIREIEf;TS B) Al42 - REC 0fEENDATIONS ,

C) A22 - If; FORMATION

2. DESIGN URAWINGS Af'D OTHER SOFTWARE C. DESIGN IIITERFACE PROCESS
1. DESIGN FREEZE
2. CONTROLLED COMullCATION PROCESS
3. CHAf'GES TO DESIGN REQUIRETENTS ECA, ECN, FDI, FDDR, AID, Sll D. SPFCIAL If!TERFACE PROGRN4S E. D 0 P If:TERFACE REVIEW
l. AUDIT BASIS 1 OR 2/ YEAR
2. RN;Iiji SELECT 10f! CF SPECIFICATION COFPLIAfJCE F. If1STALLATION Af;D PREOP. TESTING G. OPERAT10f!fL READif;ESS REVIEW

] r j 11. EECHIEL i

{ A. BECHTEL CONTAlf> MENT DESIGN RESPONSIBILITIES

$% ~R '

B. DEMONSTRATION OF GOOD INTERFACE ,D. :

l kK

1. REVIEW FOR ADEQUACY OF DESIGN CONTROL /0A PROGRAM

~

- AECM 82/119,IhRCH 26, 1982 ,

^

2. IrIDEPENDENT DESIGrl REVIEW - CYGNA

.  :~

3. NRC STRUCTt'RAL AUDIT
  • C. IrlTERFACE CONTROL
1. IflTERFACE DOCUMENTED AND APPROVED BY MP&L IN PROJECT PROCEDURES IhMUAL 1

i j 2. DESIGN CRITERIA

- INCCRPORATES NSSS INTERFACE l - REVIEWED AND APPROVED BY CHIEF ENGINEEP, MPEL APPROVES

)

3. IMPLEMEf! Tit!G PROCEDURES i

4 A. PROJECT ENGINEERING PROCEDURES MANUAL i

'B. AUTOMATIC DOCUMENT CONTROL REGISTER

- CODE 1; REVIEWED, NO CuMMENTS

- CODE 2; ComEN.TS FOR GE INFORMATION

- CODE 3; QM1ENTS REQUIRit!G RESPONSE C. GE COMPUTERIZED LOG FOR TRACKING CORRESP0f:DENCE D. CRITICAL OPEN ITEMS SUBJECT OF fiP&L CORRESPONDENCE / MONTHLY MEETINGS

_..,_,m,m_m,-_.,...____.y _ , . . _ _ . _ _ _ . _ _ , . . _ _ _ _ . , . - , . . , , , , , . - , . , - . - - _ . - . . _ . . - - . - _ , . , _ , , , . , _ . . ,..,~+-,ae,---_.

14 . OVER 113 DESIGrl REVIEW MEETit!GS WITH Sell 10R B/GE/VP8L PERS0 fit;EL . ALL RECORDED If4 MEETif1G MINUTES.

It:CLUDES SPECIAL TASK FORCE Ofi C0f4 CEPT 10f1AL DESIGil

+

+Q

5. FOflTHLY REVIEW FEETitlG DURit?G CRITICAL PERIOD

<T[i[ 0.3

6. OFF PROJECT REVIEWS k,Y ,

A. CHIEF Ef:Gif4EER'S STAFF V

tA 4 [;s INITIAL DESIGt1 4s5 74 (.

'Y%@<#

- Q W1GES IN DESIGtl' '1.$f

- AUDITS (2 PER YEAR)

B. BECHTEL POWER AUDIT (SIMILAR TO GE IfRERFACE REVIEW) _

7. MECHAf!! CAL GROUP REVIEW

- REVIEW ALL GE SPECIFICATIONS TO VERIFY IfPLEMEf; TAT 10f!/COMPLI Af1CE

- PROBLEM AREAS RESOLVED /SOMF fiCDIFICATIOrls MADE Ill. VPRL A. C0f!TINUGUS ItNOLVEMENT AfiD APPROVAL OF If1TERFACE DOCUMENT (PPM)

B. FONTHLY MEETIt;GS TO lt!SURE ' ROPER IflTERFACE C. MARK Ill OWf4ERS GROUP

1. HISTORY
2. PURPOSE
3. PARTICIPANTS II . ISSUES DISCUSSED
5. EXCELLENT If1TERFACE FORUM

\ ..

Att'achment*

3 s .

ACRS FLUID DYNAMICS SUBCOMMITTEE MEETING SAN JOSE, CALIFORNI A Revised 7/19/82 JULY 29-30,1982

- Tentative Schedule of Presentations -

July 29,1982 . .

1. Subcommittee Introduction - M. Plesset, Chairman 8:30 am
11. Comments by J. Humpnrey 8:45 am 111. NRC Presentations 9:30 am A. Introduction
1. Background
2. Problem Definition
        • Break **** 10:15 am B. Decription and Resolution Approach 10:30 am
1. Application to Containment Type (Mark 1-111)
2. Approach for Resolution
3. Schedule
        • Lunch **** 11:30 - 12:30 pm C. NRC Overview of Specific Concerns 12:30 am
        • Break **** 2:30 pm IV. Mississippi Power and Light Presentation 2:45 pm A. Introduction B. Detailed Action Plan
        • Recess **** 5:00 pm July 30,1982 V. Reconvene 8:30 am VI. General Electric Presentation 8:35 am
  • GESSAR II/ STRIDE Containment Design I
        • Break **** 10:30 am Vll. NSSS/AE Interaface 10:45 am A. Grand Gulf Plant - MP&L/Becntel/GE B. STRIDE - GE Vill. J. Humphrey Rema rks 11:45 am IX. Lunch 12:45 - 1:45 pm

"o .

X. Illinois Power Presentation .

  • Schedule and Approach for Resolving Humphrey -

Concerns on Clinton Plant 1:45 - 2:15 pm XI. Cleveland Electric illuminating

  • Schedule Approach for Resolving Humphrey Concerns on Perry Plant 2:15 - 2:45 pm XII. Discussion and Adjou'rn 2:45 pm l

i