October 13, 1982 Docket No. 50-206 LICENSEE: SOUTHERN CALIFORNIA EDISON COMPANY FACILITY:
San Onofre Nuclear Generating Station, Unit No. 1
SUBJECT:
SUMMARY
OF OCTOBER 1, 1982 MEETING On October 1, 1982, members of the NRC staff met with representatives of Southern California Edison Company in Bethesda, Maryland. The purpose of the meeting was to discuss the scope of the seismic reevaluation pro gram for San Onofre Unit No. 1. Enclosure 1 is a list of attendees.
The licensee's representatives discussed the items listed in Enclosure 2.
With regard to the postulated seismic=induced failure of the intake and discharge conduits from the Pacific Ocean to the intake structure, the licensee stated that only 4% of total flow is needed (for RHR heat sink) and that it is felt that there should be no problem with total plugging.
SCE sees no need to do a reanalysis for this portion of the intake. SCE representatives stated that any of the structures for which less than expected backfill compaction has been found will be addressed in their reanalysis.
The NRC staff indicated that the following items need additional discussion and resolution:
- 1. Vent stack
- 2. Electrical equipment and instrument support and load path
- 3. Seismic anchor movements on piping
- 4. Mechanical equipment operability Original signed by Walter A. Paalson, Project Manager Operating Reactors Branch #5 Division of Licensing
Enclosures:
As stated cc w/enclosures:
See next page ISE/
8210190671 821013 PDR ADOCK 05000206 o
DL#5 DL, 0R OFFICE SUR AME fj........1....d DA 10 r 8 2
)
/00/ /82 REOROP_
198135-960 NRC FORM 318 (10-80) NRCM 0240 OFFICIAL RE C R CO PY USGPO: 1981-335-960
Mr. R. Dietch 2 -
October 13, 1982 cc Charles R. Kocher, Assistant General Counsel James Beoletto, Esquire Southern California Edison Company Post Office Box 800 Rosemead, California 91770 David R. Pigott Orrick, Herrington & Sutcliffe 600 Montgomery Street San Francisco, California 94111 Harry B. Stoehr San Diego Gas & Electric Company P. 0. Box 1831 San Diego, California 92112 Resident Inspector/San Onofre NPS c/o U. S. NRC P. 0. Box 4329 San Clemente, California 92672 Mayor City of San Clemente San Clemente, California 92672 Chairman Board of Supervisors County of San Diego San Diego, California 92101 California Department of Health ATTN:
Chief, Environmental Radiation Control Unit Radiological Health Section 714 P Street, Room 498 Sacramento, California 95814 U. S. Environmental Protection Agency Region IX Office ATTN:
Regional Radiation Representative 215 Freemont Street San Francisco, California 94111 Robert H. Engelken, Regional Administrator Nuclear Regulatory Commission, Region V 1450 Maria Lane Walnut Creek, California 94596
ENCLOSURE 1 LIST OF ATTENDEES October 1, 1982 Meeting with Southern California Edison Company NAME AFFILIATION F. Miraglia NRC D. Crutchfield NRC W. Russell NRC K. Baskin SCE RKrieger SCE
ENCLOSURE 2 Scope of Seismic Reevaluation Program Structures (Feb.
23, 1981.SCE letterJ Reactor Auxiliary Building Fuel Storage Building Control Building Turbine Building Turbine Pedestal Ventilation Equipment Building Intake Structure Seawall Mechanical Equipment and Piping (Oct.
8, 1981 SCE letter) (July 7, 1981 SCE letter)
RCPB CVCS from RWST to RCS through charging lines and aux. spray Main Steam to atmospheric dump valves Auxiliary Feedwater System Residual Heat Removal System Component Cooling Water System, including maintaining Spent Fuel pool integrity Salt Water Cooling System Instrument Air System Safety Injection System Hydrazine Addition System Containment Spray System Containment Isolation Piping and Valves
Not Included In Scope of Seismic Reevaluation Program I. Non-Safety Related Iterfs A. Vent Stack B. Intake/Discharge Conduits C.. Primary Plant Makeup Tank D. Non-Safety Related Piping and Equipment II. Fuel Transfer Tube III.
Fuel Storage Racks IV. Spent Fuel Pool Cooling and Water Source V. Cooling to Saltwater Cooling Pump Bearings VI.
Overpressure Mitigation System VII.
4kV and 480V Switchgear Room HVAC VIII. Electrical Equipment and Instrument Support and Load Path IX.
Spent Fuel Shipping Cask Handling System X. Seismic Anchor Movements on Piping XI.
Mechanical Equipnment Operability