Summary of 821001 Meeting W/Util in Bethesda,Md Re Const Completion Date.Based on Present Estimated Core Load Date, OL Should Be Issued in mid-Dec
ML20127A310
Person / Time
Site: 05000000, Saint Lucie
Issue date: 10/13/1982
From: Nerses V
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
Shared Package
ML082170543 List: ... further results
References
FOIA-84-367 NUDOCS 8211040074
Download: ML20127A310 (3)


Text

,

A i

[f'#(800 - g NUCLEAR REGULATORY COMMISSION fo UNITED STATES g

j- -

j_

WASHINGTON, D. C. 205S5 g ' ' ( ), /

007 13 1982~--

4 q

....+

Docket No.:

50-389 f

APPLICANT:

Florida Power andlight Co'mpany, (FP&L)

FACILITY:

St. Lucie Plant, Unit 2-

SUBJECT:

SUMMARY

OF MEETING HELD WITH FP&L IN BETHESDA, MARYLAND OCTOBER 1, 1982 REGARDING CONSTRUCTION COMPLETION DATE Due to construction schedule slippage, the FP&L present estimate of core load is January 1983. The staff will notify the Bevill committee of this date. Based on the present estimated core load'date, FP&L wasi told that the staff will-work to 'a mid-December operating license.issuanc,e milestone.

FP&L agreed to supply by 0ctober 8,1982 an update on bulk quantity t-construction status and. start-up program status. As a minimum, information on the following will be provided:

1.

pipe whip: restraints 2.

large and small bore piping 3.

.large bore hangers 4.

power cable pull 5.

power cable terminations

~ 6.- control cable ' pull 7.

control cable terminations 8..

signal cable pull 9.

signal cable terminations 10.

pre-operational test performed J

FP&L will provide by October 8, 1982 a rack-up of licensed current operators,

. licensed supervisors and candidates for operator license. The staff brought to FP&L attention the recent operability problems 'of the San Onofre 2 and 3 post accident sampling system. The staff noted that if these problems pertain to the similiar system in.St. Lucie 2, there could be potential schedular delays.

Victor Nerses, Project Manager Licensing Branch No.'3 Divis~ ion of Licensing

Enclosure:

List of Attendees-1 CC:

See QSX%"p89e LI

, p. oO7x-3rf cc-

ST. LUCIE Dr. Robert.E. Uhrig, Vice President

' ~

Advanced

  • Systems and Techno' logy

' Florida Power & Light Company P. O. Box 5291000 Miami.. Florida 33152 Harold F. Reis Esq.

Lowenstein, Newman, Reis,' Ax&lrad & Toll 1025 Connecticut Avenue, N.W.

Washington, D. C.

20036

-Norman A. Coll, Esq.

Steel Hector & Davis.

1400 Southeast First National Bank Building Miami, Flordia 33131 r

Mr. Martin H. Hodder 1131 N. E. 86th Street Miami, Flordia 33138 Resident Inspector 4

St. Lucie Nuclear Power Station c/o U. S. Nuclear Regulatory Commission 7900 South A1A Jensen Beach, Flordia 33457

/

Regional Adminstrator - Region II U. S. Nuclear Regulatory Commission 101 Marietta Street-Suite 3100 Atlanta, Georgia 30303

\\

P 1

h l

l

?-

l

4 C

ATTENDEES-V. Nerses W.-H.-Lovelace

- R. A. Hartfield

. C.'A. Julian F. ' J. : Mi rag 1ia

- J.:Kerrigan T.' M. Novak-FP&L

R. E. Uhrig

. W. W. Dotson W.'B. Derrickson J. C..Walden H. J.'Dager e

a F

0 -

s.l 1

4-4 m.

m A..