Summary of 820914 Meeting w/util,C-E & Ebasco in Bethesda,Md Re Engineering Verification Program
ML17213A638
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 10/13/1982
From: Nerses V
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8211060366
Download: ML17213A638 (8)


Text

Docket No.:

50-389 APPLICANT:

Florida Power

& Light Company (FP&L)

FACILITY:

St. Lucie Plant, Unit 2

SUBJECT:

SUMMARY

OF MEETING HELD IN BETHESDA, MD, ON SEPTEMBER 14, 1982 llITH THE ENGINEERING VERIFICATION TASK FORCE MANAGERS REGARDING THE ST.

LUCIE 2 ENGINEERING VERIFICATION PROGRAM (EVP)

This meeting was held to provide the NRC staff firsthand information about the EVP through discussions with the EVP gTask Force Managers.

The EVP was initiated in June 1982.

At that time three Task Managers were selected:

T. H. Blodgett, EVP Task Force Manager for EBASCO Services, Inc. (the A/E)l, D.

D. Miller, EVP Task Force Manager for Combustion Engineering, Inc. (the NSSS) and D. L. Christain, EVP Ta'sk Force Manager for Florida Power and Light Company.

Mr. Blodgett and Mr. Miller i]cad a group of approximately 16 and 10 task force members respectively.

The following eight specific~items were selected by FP&L to be verified'y the Task Force:

1) safety injection tank isolation valve V-3614, 2) high pressure safety infection pump 2A,-

3) control room emergency clean-up system valve I-,PCV-2514, 4) combustible gas control system hydrogen recombiner 2A, 5) radiation monitoring system area monitor GM-22, 6) auxiliary building tornado door missile shield RA-107/RA-109, 7) mainsteam isolation valvei I-HCV-08-IA and 8

ECCS area ventilation system HEPA filter.

[The staff found that all the items finally selected for verification were purchased from vendors who designed the components.

Therefore, the ver ificaoo tion work would;..';confirm the purchase specification."

The're uested desi n inputs considered necessary by the task force to(perform

$he desi n reviews a

ear to be dictated by the limited time, restraints t

in complet ng e program.

h~es asap noted that t s

a ears o res r c t e boundaries of the items whose design were bein verified so that pis'ping was not considered in any of the des gn verifications being performe Schedule for completion of this work is the end of October 1982.

The criteria for selecting candidate items for the verification program was that they are important to safety and have.a multi-engineering discipline interface.

OFFICE IIt

~ ~

~ ~ ~ ~

~ ~ ~

S UANAME lP

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ o o o o ~ o ~ o o o o o o ~

~ ~ ~ oooo ~ ~ ~ ~ o o o ~ o o o o ~ ~ ~ ~ ~

(

82iOi3 82ii0603bb PDR

'ADOCK'5000389'"

~ ~"-~-- ~ ~

~

,*,"-PDeR NRC FORte' s vvvt 'ee ev

'e vviv s FIG IAL RECORD COPY USQ PO: 1981~989

'I

, v7aiff atiVs~fasv 6rrrf.bofr6Ff 68k yd'bstsdofb'nd oS eieqji'a>iitvea iipliib friohasjibdl' fade'ruti oj o~P. bsiQ~ev,bnlid' I.

a00 ~ )

~

i h'. 0.8IO 488k'I<

C ~

~

~

) [gjgp

meeting Summary 2

Procedure No. EVP-001/SL-2, Rev.

0 stated that the general boundaries will include "piping up and down stream to the first support locations";

however, Rev.

1 of this procedure del,eted this criteria for the general boundaries.

Nevertheless, in a letter from Eisenhut to Uhrig dated August 17, 1982, the staff suggested that FPSL should include piping into the'EVP.

The staff questioned whether phase 3 of the EVP, the independent start-up operation verification phase, will be done by the program ~end date of October 1882 'si'nce start<up will not be complete by the end of October 1982.

cc:

See next page Orlglnat signed by:

Victor Ner ses, Project Manager Licensing Branch No.

3 Division of Licensing OFFICEI SURNAME$

DATEP DL Lg¹3 VNA mph 10/rm /82 1

82

~

~

~

~

~

~ ~ ~ ~ I

~ ~

~ ~ ~ ~ ~ ~ ~ ~ 0 ~ ~ ~ ~ 0 ~ 0 ~ 0 ~

~

~ ~

~ tt

~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~ 0 ~ 0 ~ ~I~ ~ ~ 00 ~ 0 ~ ~ ~ 0 ~I NRC FORM 318 (10-00) NRCM 0240 OFFICIAL RECORD COPY USOPO: 1991~5-960

o~~4 ',l'>>

t 4

ST.

LUCIE Dr.. Robert E. Uhrig,.Yice President..

Advanced Systems and Technology Florida Power 8 Light Company P. 0. Box 5291000 Hiami, Florida 33152 Harold F. Reis, Esq.

Lowenstein,

Newman, Reis,, Axelrad 5 Toll 1025 Connecticut Avenue, N.W.

Washington, D. C.

20036 Norman A. Coll, Esq.

Steel Hector IE Davis 1400 Southeast First National Bank Building Hiami, Flordia 33131 Hr. Hartin H.. Hodder 1131 N. E. 86th Street "Hiami, Flordia 33138 Resident Inspector St. Lucie Nuclear Power Station c/o U. S. Nu'clear Regulatory Commission 7900 South AlA Jensen Beach, Flordia 33457 Regiona1dminetrator

- Region fI U. S.'uclear Regulatory Coimimission 101 Marietta Street Suite 3100 Atlanta, Georgia 30303

tdeeting NRC/EVP Task Manager:

Re'.-EVP V. Nerses 0.

D. Miller T.

H. Blodgett D. L. Christian T.

M. Novak D. P. Norkin V. Potapovs K. 0. Landis C.

A. Julian R.

H. Vollmer D. Eisenhut

. NRC/NRR/LBg3 Combustion Engineering Ebasco Services, Inc.

FL Power and Light Company NRC/NRR/DL NRC/ IE/DRP NRC/RIV/VP8 NRC/RII/PRP NRC/RII/P RP NRC/DE NRC/DL

MEETING

SUMMARY

, Document. Control (50-3Q9)

NRC PDR L PDR NSIC TERA-LBP3 Reading J.

Lee G. Knighton Project Manager