Text
OCT S
DISTRIBUTION:
See next page MEt40RANDUhi FOR:
A. Schwencer, Chief Licensing Branch No. 2, DL FROM:
SUBJECT:
R. Auluck, Project Yaiiager Licensing Branch No. 2, DL MEETING SUtSARY, WNP-2 ELECTRICAL CABLE SEPARATION In response to a memorandum from R. H. Engelken, Regional Administrator, Region V to H.
R. Denton, Director,
- NRR, a meeting,to discuss the WNP-2 cable separation criteria was held in Walnut Creek, Region V'n September 13 8 14, 1982.
NRR participants were T. Novak, H. Sr inivasan, S.
Rhow and R. Auluck.
Highlights af;the meeting are briefly described below.
John Elin, Project Inspector, started with his presentation on the status of the inspection activities concerning cable separation at WNP-2 site.
Examples of the deYiations from the criteria accepted by WPPSS and NRC staff in 1981 (WPPSS letter 8G02-81-146, G.
D. Bouchey Ito R.',L'. Tedesco, dated June 18, 1981) were shown and discussed.
John indicated that the FSAR-writeup is too complex and the requirements
-for:a given situation are difficult to determine.
The color coding scheme is very confusing and is not consistant throughout the plant.
John also stressed that the verification that field installation complies with separation cri'teria very difficult.
H. Srinivasan,
- Chief, Power Systems Branch, explained briefly the general review philosophy of licensing plants of WNP-2 vintage, who do not meet,t;he R.
G. 1-75 requirements.
Non-class IE cables are allowed to share raceways and trays with class IE cables as long as they stay in the same d'ivision (i.e.
same non-class IE circuit does not share raceways with Div.
1 8 Div. 2).
He further noted that the WNP-2 situation is probably similar to the situation at the Seabrook project.
S.
- Rhow, Power Systems Branch, briefly described four category of circuits used at the WNP-2 site.
The following action plan was agreed upon at the end of the meeting:
WPPSS will submit the revised section 8.3 of 'the
.FFSAR
.to. NRC staff by SepteItber 22, 1982.
The staff will review and revise SER section 8.4.1, which will be included in a later SSER.
OFFICE/
~
~ ~ 0 ~ ooo ~ otto ~ 0 ~
0 ~ 0 ~ ~ ~
otoototo ~ ~ oto ~ ootoooooo ~
82ii060394 821006 oATE PDR ADOCK 050003'P7 144 NRO FORM 010 004M) NROM 0040 I
4 c'
~ 0 ~ ~ 4 ~ ~
~
(
l OFF !CIA L R ECOR D COPY USGPO: 1981~&960
II~ 1 >It ~ 4 ~ \\t 0 4 5 <<a I~I~ a ~l~
l Q, ss a i sos-owe>> cs ss 8 ~ ~\\
~ ~ 111\\ '
k4 ~lit& 1l
~ It~Std
~ 0 ~ 1~
I
~ EP 41tj V 0
Vif I~I~ OH-JeltagP ~ gl14 ~ 5 L
~~ey-.
~
~.
Meeting Summary 2
John Elin will come to Bethesda and will be a party to w iting a revised acceptance criteria for IINP-2.
Site visit and discussions with the applicant will, be held in October 1982.
Independent design verification the management g5 meeting to be A copy of the handouts provided on cable separation will be discussed in held in October 1982.
at the meeting is in~the project files.
cc:
See next page R. Auluck, Progect Manager Licensing Branch No. 2, DL DL".LB¹ /
OFFICE) ~
I
~
SURNAMEf ~~i~i~ ~i ~ ~ ~
~ ~
~ o
'A'8j OATE 1 0/5 /82 NRC FORM 318 t10-80) NRCM 0240 DL3:L 2
BC ASch,e cer 10//g /82 OFFICIAL RECORD COPY VSGPO: 1981~5.960
~-
~1
MNP-2 Hr. R. L. Ferguson Han agi ng Director Washington Public Power Supply System P. 0.
Box 968 3000 George Washington May
- Richland, Washington 99352 CC:
Nicholas'Reynolds, Esquire
~ Debevoise 5 Libenan 1200 Seventeenth
- Street, N. M.
Washington, D. C.
20036 Nr. G.E.
Doupe, Esquire Mashington Public Power Supply System P.O.
Box 968 3000 George Mashington May
- Richland, Washington 99352 Nicholas Lewis, Chairman Energy Facility Site Evaluation Council Nail Stop PY-ll Olympia, Washington 98504 Roger
- Nelson, L'icensing Manager Washington Public Power Supply System P.O.
Box 968
- Richland, Washington 99352 Mr. M.G. Conn, Sr.
N/N Group Supervisor Burns and Roe, Incorporated 601 Milliams Boulevard
- Richland, Washington 99352 Mr. Richard Feil U.S.
NRC Resident Inspector WPPSS-2 NPS P.O.
Box 69 Richl and, Washington 99352 Dr. G.D. Bouchey Deputy Director, Safety 8 Security Washington Public Power Supply System P.O.
Box 968, MD 650
- Richland, Washington 99352
'MEETING
SUMMARY
DISTRIBUTION:
50ooutnunt Contro1 (50- 50>
) 7
.RRC
.PCR Local PDR PRC NSIC LB82 Reading File EHylton Project Manager R. Auluck E.
Case D. Eisenhut/R.
Purple
~,T.. Novak J.
Youngblood A. Schwencer J. Kerrigan Adensam C. Thomas F, Miraglia M. Russell D. Crutchfield T. Ippolito J.
P. Knight M. Johnston D. Muller T. Speis R. Houston L. Ruhenstein F. Sch oeder M. Ernst J.. Kramer
'O<<O,OOOO~
E. L. Jordan, J.
M. Taylor, ISE Region V
Resident Inspector ACRS (16)
OSD 0}
OCT 6
1982 NRC PARTICIPANTS:
T; Novak M. Srinivasan S.
Rhow R. Auluck" cc See next page