Summary of 821012 Meeting W/Util in Bethesda,Md Re Pressure Isolation Valve Leak Testing
ML17213A672
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 11/01/1982
From: Nerses V
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8211100546
Download: ML17213A672 (6)


Text

Docket No.:

50-389 NOV g

)gg APPLICANT:

Florida Power and Light Company, (Fp&L)

FACILITY:

St.

Lucie Pl ant, Unit 2 SUBJECT'UMMARY OF MEETMG HELD IN BETHESDA ~

MARYLAND tlITH FP&L ON OCTOBER 12, 1982 REGARDING I'RfSSURE ISOLATION VALVE LEAK TESTING A meeting was held on October 12, 1982 between FP&L and the NRC on pressure isolation valve leak testing.

The following was agreed to:

1.

FP&L has demonstrated that leak rate testing or pressure monitoring can be achieved on all valves ments'oned i.n Table 3.4-1 of the St. Lucre 2 Technical Specificati'on.

2.

The following valves will be deleted from Table 3.4-1; V3113, 73114, V3123, V3124, V3133, V3134, V3143 and V3144.

3.

The following valves will be added to Table 3,4 1:

Check valves

V3524, V3525, V3526, V3527 and motor operated valves V3480, V3481, V3651 aind V3652.

4.

Some wording changes to the TS wi'll be made to reflect the above

changes, 5.

NRC will review the 2 valve requirement of action C j,n Spec, 3.4,6.2,'

NRC will tell FP&L the results of thei,r review, 6.

NRC will review the, 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> requirement of I'tepl 4.4,6,2,2(d),

NRC will tell FP&L of the results of thei'r review; cc:

See next page

~~ Si8ned By:

Pictor Nerses, Project Manager Licensing Branch No, 3

Division of Licensing Distribution:

See next page t~82i ii00546.- 82i iOi PDR, ADGCK.,05000389'

-"'-"= 'DR OFF(CE SURNAME/

DATE Q NRC FORM 318 u 0-80) NRCM 0240 g

n j.,I Isa OFFICIAL RECORD COPY USGPO: 1981~~@960

~

~,Q

~

$4 h

ST.

LUCIE Dr. Robert E. Uhrig, Vice President Advanced Systems and Technology Florida Power 8 Light Company P. 0.

Box 5291000 Miami, Florida 33152 Harold F. Reis, Esq.

Lowenstein, Newman, Reis, Axelrad 5 Toll 1025 Connecticut Avenue, N.W.

Washington, D. C.

20036 Norman A. Coll, Esq.

Steel Hector E Davis 1400 Southeast First National Bank Building Miami, Flordia 33131 Mr. Martin H. Hodder 1131 N. E. 86th Street Miami, Flordia 33138 Resident Inspector St. Lucie Nuclear Power Station c/o U. S. Nuclear Regulatory Commission 7900 South-'ARA Jensen Beach, Flordia 33457 Regional Adminstrator - Region II U. S. Nuclear Regulatory Commission 101 Marietta Street Suite 3100 Atlanta, Georgia 30303

j

~

\\

f PRESSURE ISOLATION VALVE LEAK TESTING OCTOBER 12, 1982 Patrick Carier Robert Sweeney Gary Hammer Frank C. Cherny Erroll W. Dotson R.

R. Jennings Donald R. Hoffman William J.

Ross VS Nerses FPSL/Licensing EBASCO/FPSL Licensing NRC NRC/MEB FPL/PSC 2 Engr.

Prog.

Manager FPL-PSL Tech.

Supr.

NRC/SSPB/STS NRC/Region II NRC/NRR/DL/LB83

hEETING SUhhARY cument Control (50-389)

NRC PDR

~a L PDR HSIC TERA-LB.'3 Reading J.

Lee G. Knighton Project Manager V. Nerses

Attorney, OELD E. L. Jordon Regional Administrator, Region J.

M. Taylor PARTICIPANTS (NRC:

0 0