Text
gp g 4.198K Docket No.:
50-387 APPLICANT:
Pennsylvania Power
& Light Company FACILITY:
Susquehanna Steam Electric Station, Unit 1
SUBJECT:
SUHi~lARY'OF SEPTEMBER 9, 1982 MEETING ON THE HATURAL GAS PIPELINE l'JEAR THE SUSgUEHAfIHA SITE On September 9, 1982, representatives of Pennsylvania Power
& Light Company (PP&L) and their consultants met with members of the HRC staff to present new information regarding the configuration of the gas pipeline near the Susquehanna site.
A list of attendees is provided as Enclosure 1.
PP&L informed the HRC staff that analysis has shown that the flowmeter orifice
- plates, referred to in license condition 13 of the Susquehanna operating license, would likely fail under the high differential pressure associated with a line rupture.
PP&L did claim that flow-and pressure-regulating valves also present in the line, when suitably modified, would constitute passive flow restrictor s and limit the flow to acceptable low levels.
PP&L provided documentation of their presentation in a letter to the HRC staff dated September 9, 1982.
The HRC staff, while agreeing in principle >>ith the PP&L proposal, will continue to conduct a more detailed review.
Enclosure As stated cc w/encl.:
See next page Robert L. Perch, Project Manager Licensing Branch Ho.
1 Division of Licensing
Saiol9OlS3~8a09i4.
"-:: PDR iADOCK<050003B7
~PDa DL:LB¹2 OFFICE/
SURNAME/ RPerch/lg 9/24/82 DATE0 NRO FORM 318 (10-80) NRCM 0240 D,
BJY 'ood 9/$
2 OFFICIAL RECORD COPY USG PO: 1981~~960
Susquehanna e,
4 l:r-. tlorman M. Curtis Vice President E ngi neeri ng a nd Cons truetion Pennsyl vania Power 5 Light Company Allentown, Pennsyl vania 18101 I.
~
ccs:
Jay Silberg, Esquire
- Shaw, Pi ttman, Potts 5 Trowbridge 1800 N Street, 13.
M.
Mashington, D. C. 20036 Edward N. !)agel, Esquii e General Counsel and Secretary Pennsyl vania Pover 5 Light Company 2 tlorth l,'inth Street
~,
Allentown, Pennsyl vania 18101 hr. William E. Barberich H'uclear Licensing GroJp Supervi sor Pennsyl vania Power 5 Light Company 2-Horth Hinth Street Allento>>n, Pennsyl vani a 18101 hr.
G.
Rhodes Resident Inspector P. 0.
Box 52 Shickshinny, Pennsyl vani a 18655 Gerald R. Schultz, Esquire Susquehanna Envirorniental Advocates P.. 0.
Box 1560 Milkes-Barre, Pennsyl vania 18703
!'r. E. B. Poser Project Engi neer Bechtel Power Corporati.on P. 0.
Box 3965 San Francisco, California 94119 Ns. Colleen Harsh P. 0.
Box 538A, RD ;.4 Niountai n Top, Pennsylvania 18707 Yir. Thomas J. Halligan Correspondent The Citizens Against liuclear Dangers P. 0.
Box 5
- Scranton, Pennsylvania 18501 l'll J
M ~ Nil 1 ard Project l~ianager Nail Code 395 General Electric 'Company 175 Curtner Avenue San J os e, California 95125
\\
Robert M. Adler, Esquire.
Office of Attorney General 505 Executive House P. 0.
Box 2357 Harrisburg, Pennsylvania 17120 Nr, R,
Haynes, Administration U, S. Nuclear Regulatory Comnission-Region I
631 Park Avenue King of Prussia, Pennsylvania 19405 Or.. Judi th H. Johnsrud Co-Director Environmental Coalition on Huclear Power 433 Orlando Avenue State Col lege, Pennsyl vania 16801 Nr. Tnomas N. Gerus'ky, Director Bureau of Radiation Protection Resources Com,anwealth of Pennsyl vania
,P. 0.
Box 2063 Harrisburg, Pennsylvania 17120
ENCLOSURE 1
LIST OF ATTENDEES NRC W. H. Regan L, Soffer A. Sinisgalli R.
Perch Stannard 8 Co.
J. Stannard, Jr.
PP8L N.
W. Curtis R, Shovlin W. Barberich D,
Kohn R. Sgarro A. Netzger
0 4
c 1,
WJ A
F
4 MEETING
SUMMARY
j Document Control-(-50--387)7 NRC PDR L PDR TERA NSIC LBPr2 Rdg, MRushbrook Project Manager R.
Perch
- Attorney, OELD OI E Regional Administrator, Region I
SEP 2 C ~SV PARTICIPANTS (NRC)::
W.
H.
Regan L. Soffer A, Sinisgalli R. Perch
sQ
~
'1 v
4 I '